The analysis of ground subsidence stability was conducted for the residential area located on the limestone corrosion zone. For the investigation of the cavity distribution in limestone region, various geophysical investigations such as electroresistivity tomography, electromagnetic prospecting are carried out. Geotechnical field tests with drilling are also carried out for the evaluation of the ground characteristics. Based upon their results, numerical modeling is performed for the simulation and prediction of the ground subsidence with the conditions of cavity geometry and groundwater level. The main factor to cause the ground subsidence is estimated as the draw down of the groundwater level below soil overburden, which disturbs the mechanical equilibrium of ground and drives washing away the overburden soil through the cavity and solace subsidence. It seemed that it is essential to maintain the groundwater level continuously above the shallow cavity for the prevention of the ground subsidence on the limestone corrosion zone.
Recently frequent occurrence of ground subsidence cases has become social issue, and people's concern on this problem has been growing accordingly. Meanwhile, understanding on the mechanism of ground subsidence formation is not enough. Therefore, this study aims for evaluating formation mechanism of ground subsidence under various groundwater conditions through model test when groundwater and soil are leaked together. Major factors found through model tests are direction of groundwater flow, head difference around the leakage point, and strehgth of the ground to support the underground cavity. Firstly, direction of groundwater flow has an influence on the direction of cavity expansion and ground collapse. Secondly, it is observed that the speed of ground subsidence formation increases as the head difference increases. Lastly, the expansion of the cavity can eventually lead to a sudden collapse.
This paper looks into the field inside the wide rectangular box structure that is excited by the High Power Electromagnetic(HPEM) source as a potential threat to electric grid and communication networks causing malfunction or destruction. The rectangular box is assumed power/ground planes and its internal field is calculated by the cavity model with the lightning strike excitation as an HPEM pulse. The accuracy of the calculation method employed here is validated through a $156mm{\times}106mm{\times}508{\mu}m$ parallel metallic plate case which is manufactured and tested, and is applied to the size of a building. With the help of the cavity model that takes into account loading, the level of the electric field is shown to decrease when a metal pillar is loaded between the power and ground planes.
Kim, Yeonho;Park, Hyunsu;Kim, Byeongsu;Park, Seong-Wan
International Journal of Highway Engineering
/
v.18
no.5
/
pp.39-47
/
2016
PURPOSES : Road subsidence occurs owing to road cavities, which cause many social and environmental problems, especially in cities. Recently, road cavities were detected by various ground radars and repair works were carried out against the detected cavities. The condition assessments related to the road cavities are necessary to understand the potential risk of the cavities. Therefore, in this study, a numerical study was performed to assess the various conditions of road cavities. METHODS : The numerical method adopted in this study is the discrete element approach, and it is suitable for analyzing the condition because it can consider the movement of the soil particles in the surrounded cavity areas. In addition, the triaxial test was modeled and performed under various cavity conditions inside the specimens. RESULTS : The conditions of different cavity locations and shapes were analyzed to identify the effect of cavity state. Three general cases of particle size distributions were formulated to identify the effect of surrounding ground conditions. As a result, the degree of decrement and volumetric strain were varied depending on the locations and shapes of the cavity. Only minor changes were observed when the particle size distributions were altered. CONCLUSIONS : The strength reduction was higher when the cavity formed was larger and located in the upper zone. Similar to the cavity shape, strength reduction and volume deformation are more influenced by the width than the length of the cavities. There is an influence from ground conditions such as the particle size distribution, especially on the wide cavity.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.27
no.2
/
pp.131-137
/
2016
In this paper, a feasibility on a ground-penetrating radar for detecting subsurface cavities near buried pipes has been investigated. The experimental setup was implemented by employing an impulse ground-penetrating radar system, a xy Cartesian coordinate robot, an underground material filled tank, a metal pipe and a simulated cavity model. In particular, the simulated cavity model was constructed by packing Styrofoam chips and balls, which have both similar electrical properties to an air-filled cavity and a solid shape. Through typical three experiments, B-scan data of the radar have been acquired and displayed as 2-D gray-scale images. According to the comparison of B-scan images, we show that the subsurface cavities near the buried pipes can be detected by using the radar survey.
Kim, JinYoung;Lee, SungYeol;Choi, ChangHo;Kang, JaeMo;Kang, KwonSoo;Jeong, HyoJin;Hong, JaeCheol;Lee, JaeSoo;Baek, WonJin
Journal of The Korean Society of Agricultural Engineers
/
v.59
no.5
/
pp.83-91
/
2017
Recently, ground subsidence frequently occurs in downtown area. The major causes of the subsidence on the subsurface were the damages of the water supply and sewer pipelines and excavation works in adjacent areas, etc. Because of these various factors, it is not easy to analyze the tendency of occurrence of ground subsidence. The purpose of this study is to clarify the effect of ground subsidence by the change of the fine particle content and ground water level and to establish the ground subsidence mechanism. In this study, a model soil-box was manufactured to simulate the failure of the old sewer pipe which is one of the causes on ground subsidence. And a model test was conducted to investigate the effects of fine contents and ground water level on the cavity occurrence. From the test results, firstly the higher the ground water level, the faster the primary cavity is formed as the seepage stress increases. As a result, the secondary cavity and the ground subsidence rapidly progress due to the relaxation of the surrounding ground. The total amount of discharged soil was decreased as the fine content increased.
The ground cavity occurring in the downtown area is on the increase. However, when ground subsidence is occurred or a cavity that causes it to occur is found, time and economic difficulties are follwed in recovery. In advance, this study conducted to develop filling system for reinforcement material which is consist of polymer pouch and admixture as a new filler material. We developed a polymer pouch that is water soluble in the precedent study. Since the filling system is trenchless method and don't need any plant, it has time and economic benefits. This system uses air pressure to filling out cavity in a short time. We estimate this system with respect to filling speed and filling ratio by model experiment. In addition, we could confirm various filling condition using DEM Analysis. So, we could develop filling system and analysis it.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.1343-1350
/
2005
In this study, the whole deformation conditions of domestic old tunnels and reinforcement methods for deformation tunnels were investigated and analysed, and the present conditions, occurrence cause and reinforcement methods of cavity behind the tunnel lining were investigated and analysed comprehensively. The deformation causes of domestic old tunnels could be classified in three kinds : change of earth pressure operating tunnel ground, material problem of concrete lining, mistake of design and construction. As a result of analysis, the tunnel deformation was occurred by not specific cause but various cause As a result of investigation for 455 domestic tunnel data, more than 70% of the tunnel deformation was related to leakage and the other deformation cause also accompanied leakage mostly. An applied reinforcement method was related to leakage and flood prevention measures, but application of reinforcement method for boundary area between tunnel and ground and tunnel periphery which influence on the tunnel stability was still defective. The cavity of domestic old tunnel occupied about 16% of the total tunnel length and about 68% of cavity was located in the crown of tunnel, and besides, the occurrence cause of cavity was analysed to design, construction and management cause. The filling method for cavity using filling material was comprehensively appling to cavity behind tunnel lining.
As construction for road and train tunnel is increasing, various geotechnical conditions can be faced during the construction stage. Especially, if the tunnel is located in limestone area, the cavity is mostly to locate in tunnel planning location. One or some cavities which can be harmful for tunnel safety are predicted. Hence, this study was fulfilled to confirm the influence between tunnel and cavity using laboratory scale down model test and numerical analysis. The scale down model test was carried out to confirm the failure load of the model ground about the interval length of cavity and tunnel and to analyze behaviour characteristics of the model ground on the cavity shape. From the model test result, the failure load decrease in accordance with decreasing of interval length between cavity and tunnel within 0.5D. The numerical analyses were carried out for verification about scale down model test. From the numerical analysis result, tunnel safety decreases in the case of the interval between cavity and tunnel within 0.5D.
In this study, a series of finite element numerical analyzes were performed considering the pavement thickness and traffic load for the purpose of stability analysis on the cavity ground. In order to verify the validity of this numerical method, the previous numerical analysis was used to simulate the mechanical behavior of cavity ground, and the results were compared and analyzed. Also, from the numerical results, it was possible to confirm the dynamic behavior of the ground by confirming the change of ground void ratio, surface settlement, and shear stress, and using the relationship between stress ratio, non-destructive depth and surface settlement, the safety of the was analyzed. As a result, as the pavement thickness decreased and the traffic load increased, the non-destructive depth and the overall stability of the ground decreased with the increase of surface settlement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.