• 제목/요약/키워드: Ground Rod

검색결과 161건 처리시간 0.025초

수처리용 유전체장벽 플라즈마 반응기에 대한 기초 연구 (A Basic Study of Plasma Reactor of Dielectric Barrier Discharge for the Water Treatment)

  • 김동석;박영식
    • 한국환경과학회지
    • /
    • 제20권5호
    • /
    • pp.623-630
    • /
    • 2011
  • This study investigated the degradation of N, N-Dimethyl-4-nitrosoaniline (RNO, indicator of the generation of OH radical) by using dielectric barrier discharge (DBD) plasma. The DBD plasma reactor of this study consisted of a quartz dielectric tube, titanium discharge (inner) and ground (outer) electrode. The effect of shape (rod, spring and pipe) of ground electrode, diameter (9~30 mm) of ground electrode of spring shape and inside diameter (4~13 mm) of quartz tube, electrode diameter (1~4 mm), electrode materials (SUS, Ti, iron, Cu and W), height difference of discharge and ground electrode (1~15.5 cm) and gas flow rate (1~7 L/min) were evaluated. The experimental results showed that shape of ground electrode and materials of ground and discharge electrode were not influenced the RNO degradation. The thinner the diameter of discharge and ground electrode, the higher RNO degradation rate observed. The effect of height gap of discharge between ground electrode on RNO degradation was not high within the experimented value. Among the experimented parameters, inside diameter of quartz tube and gas flow rate were most important parameters which are influenced the decomposition of RNO. Optimum inside diameter of quartz tube and gas flow rate were 7 mm and 4 L/min, respectively.

발파진동 제어에 의한 특수구간 터널굴착에 관한 연구 (A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions)

  • 최형빈;임한욱
    • 산업기술연구
    • /
    • 제20권A호
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

20 kHz 전력설비 접지시스템 분석에 관한 연구 (Study to Analyze the Grounding System in the 20 kHz Power Installation)

  • 정진수;한운기;박찬엄;송영상;임현성
    • 전기학회논문지
    • /
    • 제62권9호
    • /
    • pp.1308-1312
    • /
    • 2013
  • In this paper, carried out for optimal ground system for ensuring safety for electricity used to power equipment in the 20 kHz frequency. Now the grounding system of the mesh electrode, electrode rods are installed for power plant safety and protection against electric shock. However, the electrical equipment grounding system in the 20 kHz were considering the increasing grounding impedance due to the high frequency and the magnetic shielding. But until now, there has been little research on the grounding system. To solve this problem, In this paper was proposed optimal grounding system due to the experiment using a mesh electrode, rod electrode, aluminum plate electrodes. Measurement results, grounding resistance was depending on the material of the electrode grounding resistance. In addition, the leakage current (induced) appeared to be affected depending on the type of electrode.

로드경비로봇 모델 연구 (A RodSecurityRobot Model)

  • 양경애;신승중
    • 문화기술의 융합
    • /
    • 제4권4호
    • /
    • pp.401-406
    • /
    • 2018
  • 경찰청 생활안전국의 자료에 따르면 빈집 등에의 침입이 2013년부터 2016년까지 증가하였다. 이렇게 주거침입, 절도가 늘고 있다. 또한 검찰청 절도 통계자료에 따르면 2016년 총 203,573건의 절도범죄가 발생하였고 이중에 18.9%가 침입절도로 침입한 뒤에 절도를 한 것으로 나타났다. 이렇게 침입을 하여 절도를 하는 형태의 절도가 가장 많기 때문에 우리는 관리할 것이 많은 공장에 보안을 강화하기 위해 로드경비로봇 모델을 연구하게 되었다. 높은 곳까지 보안에 신경쓰기위해 드론까지 사용하여 지상을 관리하는 로봇과 협동하여 제어하는 로드경비로봇 모델을 제안하게 되었다. 로봇과 드론이 함께 움직이고 물체를 피해가는 자율주행 형태와 시간 간격을 체크하고 전력 부족 시에는 충전기에 다시 돌아와서 충전하는 형태의 모델이다.

MATLAB 프로그램을 이용한 배전계통에 사용되는 동봉 접지전극의 과도 접지임피던스 특성 분석 (Transient Grounding Impedance Characteristic Analysis of a Copper Rod-type Grounding Electrode Used for Electric Distribution Systems Using MATLAB Program)

  • 김경철;오경훈;이규진;심건보;최종기
    • 조명전기설비학회논문지
    • /
    • 제23권9호
    • /
    • pp.40-46
    • /
    • 2009
  • 비록 접지저항은 접지전극의 접지성능을 좌우하는 지수이기는 하지만, 과도상태에서는 접지 성능을 반영하지 못한다. 동봉은 배전계통에서 가장 많이 쓰이는 접지전극이다. 본 논문에서는 동봉의 접지 임피던스를 주파수 60[Hz]에서 100[kHz] 범위까지 측정하여 등가 접지임피던스 모델을 구하였다. 뇌격서지가 유입되었을 때 MATLAB 프로그램으로 과도접지임피던스의 수치와 파형을 시뮬레이션하였다.

케이싱 오실레이터의 역기구학 해석 (A Study on the Inveres Kinematic Analysis of a Casing Oscillator)

  • 이은준;배재만;박명관
    • 한국정밀공학회지
    • /
    • 제17권12호
    • /
    • pp.47-53
    • /
    • 2000
  • The casing oscillator is a construction equipment to clamp, oscillate and push a casing for foundation work. In case that the casing oscillator is operated on the slant ground, if another construction heavy equipment is not used, it is impossible to insert the casing in ground using only casing oscillator. So in this paper, we present the new casing oscillator that need not to level the ground for work of casing insertion. This mechanism can execute 4 DOF motion by actuating 5 single - rod hydraulic cylinders. The inverse kinematics analysis of the casing oscillator is performed and we verify the validity of kinematics analysis through the experiment.

  • PDF

A study on new soil investigation method using seismic waves generated by dynamic penetration blows

  • Saito Hideki
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2005년도 제7회 특별심포지움 논문집
    • /
    • pp.3-9
    • /
    • 2005
  • In order to obtain more reliable data for the information on the ground, a new site Investigation method is proposed, in which seismic waves (S-waves) generated by the Swedish Ram Sounding Test (SRS) are used. It is indicated that the energy transferred from the hammer to the rod in SRS's is much more stable, compared to SPT's. A series of SRS with measurements of seismic waves at the ground surface were carried out to clarify the characteristics of seismic wave propagation in the ground. As the results of comparison between seismic S-wave amplitudes and $N_d$ (blow count for 20 cm penetration in SRS), it was found that amplitudes of S-waves generated by SRS correlate well with $N_d$. The amplitude of the S-wave is thought to be more adequate parameter for the soil strength and rigidity than $N_d$.

  • PDF

케이싱오실레이터의 순기구학 해석 (A Study on the Forward Kinematic Analysis of a Casing Oscillator)

  • 백재호;신진오;이은준;박명관
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 추계학술대회 논문집
    • /
    • pp.237-240
    • /
    • 1997
  • The casing oscillator is a construction equipment to clamp, oscillate and push a casing for foundation work. In case that the casing oscillator is operated on the slant ground, if another construction heavy equipment is not used, it is impossible to insert the casing in ground using only casing oscillator. So in this paper, we present the new casing oscillator that need not to level the ground for work of casing insertion. This mechanism can execute 4 DOF motion by actuating 5 single - rod hydraulic cylinders. The forward kinematics analysis of the casrng oscillator by tetrahedron geometry is performed so predict workspace, direction and poison of casing oscillatoer.

  • PDF

신개발 접지장치의 성능평가시스템에 관한 연구 (A study on the system to evaluate the performance of novel ground apparatus)

  • 박상만;장상옥;박창호;강문호;최종기;이문석;최하옥;이용한;황광수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2666-2668
    • /
    • 2003
  • The most widely employed grounding apparatus in distribution systems is a driven rod. But this method has some difficulties to get a specified ground resistivity in cities or islands. Recently, the new ground apparatus are proposed. This paper describes the research which relates with the system to evaluate the performance of novel grounding apparatus.

  • PDF

서울메트로 PSD장비 탄소접지모듈 설치 사례 (The example of the Carbon Grounding Modules installation for PSD systems at a subway station, Seoulmetro)

  • 정용기;현용섭;송병권;김용협
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.292-298
    • /
    • 2008
  • Seoul Metro and Seoul Metropolitan Rapid Transit Corp. have started installing screen doors at subway platforms to improve the environment of subways and prevent passengers' accidents since 2006. They are still installing screen doors at subway platforms and Metropolitan Rapid Transit Corporations in other areas are also proceeding with installment of screen doors or making preparations for it. Grounding is necessary for installing PSD systems. In case that PSD grounding is connected with existing electrical equipment grounding system, it was decided to install separate grounding for safe operation of PSD system and passenger safety. However, it's very difficult to install new grounding at the subway station compound. A way to improve this condition is that we proceed with grounding by composing grounding station by carbon grounding rod. This paper will mainly deal with how to design and construct carbon ground rod, which has been applied to PSD system grounding since 2006, including its experimental examples. In this paper, ways to secure ground resistance below 5 ohms, which is resistance necessary for PSD grounding, and to compose grounding system were also discussed. Furthermore, a ground test to check the ability to fulfill a role of PSD grounding system was conducted. As a result of applying carbon grounding module, PSD system is being operated without any problem and the installment of PSD system will be continuously expanded in the future. It's also thought that a way to integrate grounding of each functional room which has been installed at the subway station compound and to arrange equipotential grounding should be reviewed and performed promptly.

  • PDF