• 제목/요약/키워드: Ground Magazine

검색결과 240건 처리시간 0.019초

완전준설 치환공법에 의한 컨테이너 부지조성 사례 (A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method)

  • 홍의;심동현
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF

지하수에 대한 소고 (A Note on Under ground water)

  • 최귀열
    • 한국농공학회지
    • /
    • 제8권1호
    • /
    • pp.1055-1063
    • /
    • 1966
  • Ground water hydrology may be defined as the science of the occnrrence, distribution, and movement of water below the surface of the earth. Geohydrology has an identical connotation, and hydrogeology differs only by its greater emphasis on geology. Ground water referred to with out further specification is commonly understood to mean water occupying all the voids with in a geologic stratum. This saturated zone is tobe distinguished from an unsaturated, or aeration zone where voids are filled \yith water and air. Water contained in saturate:! zones is important for engineering works, geologic studies, and water supply developements Conseqently, the occurrence of water in these zones will be emphasized here. Un-saturated zones are usualiy found above saturated zones and extending upward to the ground surface. Because this water includes soil moisture with in the root zone, it is a major concern of agricultlre, botmy and soil science. No rigid demarcation of waters, between the two zones is possible, for they possess an iriterdependent boundary and water can move from zone to zone in either science, including eology, hydrology, meteorology, and oceanography are concerned with earths water, but ground water hydrology may be regarded as a specialized science combining elements of geology, hydrology, and fluid mechanics. Geology governs the occurrence and distribution of ground water, hydrology determines the supply of water to the ground, and fluid mechanics explains its movement. To provide maximum development of grofnd water resources. for benefical use requires thinking in terms of an entire ground water basin. In order to inorease the natural supply of ground water, man has attempted to artifially recharge ground water basins. Coastal aquifers come in contact with the ocean at seawater of the coastline. Fresh ground water is discharged in to the ocean. the seaward flow of ground water has been decreased or even reversed, Sea water penettating in land in aquifer.

  • PDF

압밀주입에 의한 지반개량 특성고찰 (a study on ground improvement of sandy soil by CGS Method)

  • 곽수정;백홍렬
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.185-192
    • /
    • 2006
  • In this study the case of ground improvement by CGS as injection method were analyzed in order to find out effect of behavior of sandy soil and the application of this method as ground improvement. The study were analyzed N value after CGS work of sandy soil by many sites test. Considering that increase of N value, CGS can be considered as an effective method to increase the bear capacity as well as constrain the settlement of soft ground From the results of this study, N value after CGS work of sandy soil were closed to N value of ground and relative density(Dr), improvement ratio(As) of grouting and the study will be done continuously for finding out relation of them

  • PDF

오토백 인장장치의 적용성 (Application by Auto Back Tension System)

  • 박상국
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.66-72
    • /
    • 2006
  • The ground anchoring has been utilized over 40 years. It is growing the application of the removal ground anchor with tension force for holding earth retaining constructions in the city. It transmits tension stress of prestressed steel wire through grouting to fixed the ground that is of great advantage adjacent ground stability. Nowadays, we can find the compression dispersion anchor on many site. But, it has some problems in behavior of anchors because of impossible to tense p.c strand uniformly under the existing equipment due to different length of p c strand. Hence, motive of this research was to study the application of the newly developed tension system, that analyze and compare with the current anchoring method build on the data of in-site test and laboratory test. As a result, in case of auto back tension system, it became clear that tension pressure was equally distributed among the steal wires but the existing tension system showed sign of instability by indicating stress deflection of about 30% compare with design load. This can cause an ultimate failure of the concentrated p.c strand and a shear failure of ground.

  • PDF

충남지역의 지하수개발에 관한 조사 (Research on the Ground Water Developement in the Region of Choong Nam Province)

  • 민병섭
    • 한국농공학회지
    • /
    • 제11권4호
    • /
    • pp.1827-1831
    • /
    • 1969
  • Resulties of research on the capacity of ground water of 994 concrete-pipe-wells and 97 infiltration-gallerys in ground-water-developement-works region executed from March to Julyin 1969, in Choong Chung Nam Do, and research on the quality of ground water for 88 wells for home-use around of River Geum Area, are as fellows: (1) Thickness of aquifer is no more than 2.85m averagely even at river-overflowed plain, alluvial plain and valley plain area that are estimated to contain ground water mostly. And so, it is guessed that ground water capacity is not much especially. (2) Soil of aquifer of the above area is sand or gravel and it is estimated to be good for ground water developement and its mean permeability coefficient is bout $2.5{\times}10^{-3}$(m/sec), and its porosity is about 33.9%. (3) The quality of ground water is good for irrigation water exception of delta plain area. Warm water plan is to need for irrigation water when water temperature is less than 19 degrees below zero. (4) Prospect of ground water developement, judging from quality and quantity, expects to lay infiltration gallery under the ground at river bed in order to utilize under-flow-water of river bed, river-overflowed plain, alluvial plain and valley plain that ground level is less than 50m. (5) Collectable water volume of under-flow-water of river bed is about 450 to $750m^3/day$ to be able to irrigate 3ha to 5ha of the cultivated land in case that infiltration gallery length is 50m and its depth is about 5m. (6) Collectable water volume at river-overflowed plain, alluvial plain and valley plain area, is estimated $150m^3/day$ to be able to irrigated 1ha of the cultivated land.

  • PDF

온돌의 구들장과 땅바닥의 비정상 열전도 해석 (Transient Heat Conduction Through the Ondol Floor and Beat toss to the Ground)

  • 배순훈;김두천
    • 대한설비공학회지:설비저널
    • /
    • 제4권1호
    • /
    • pp.6-17
    • /
    • 1975
  • For a periodic variation of the flue gas temperature the heat conduction through the Ondol floor was analysized. Also the heat loss to the ground was estimated. The floor thermal capacity, as a function of the floor thickness, has strong influence on the time lag of the temperature variation. It is an important design parameter for intermittent heating. Even for the steady periodic variation, there was significant heat loss to the ground below the Ondol floor.

  • PDF

고압분사주입공법으로 보강된 개량체의 특성 및 흙막이벽의 변형해석 (Mechanical Properties of the Ground Improved by High Pressure Jet-Grouting and Analysis of Deformation of Propped Retaining Walls)

  • 심태섭;주승완
    • 한국농공학회지
    • /
    • 제42권6호
    • /
    • pp.98-105
    • /
    • 2000
  • Recently, the construction method of high pressure jet-grouting is in wide-use, for the purpose of structure foundation ground, reinforcing of ground behind propped retaining walls and cut-off in order to perform safe construction of underground excavation work. This study was performed a serious of tests of field permeability and unconfined compressive strength upon ground improved established on the ground behind propped retaining walls and examined proper jet mechanism by changing the construction parameter value of high pressure jet-grouting. In addition, we got the conclusion like the followings as a result of inspecting the condition of earth pressure distribution and deformation, using elasto-plastic method and FEM. 1. In that characteristics of strength of ground improved, with the same condition of construction parameter, unconfined compressive strength of sand gravel is shown bigger than that of silty sand by about 1.6 times and cut-off effect is shown to have effect of reducing the permeability of original ground by about 10$^{-2}$ ~10$^{-3}$ cm/s. 2. As a result of analysis of figures of horizontal displacing quantity of propped retaining walls materials regarding before and after High pressure jet- grouting through FEM, the reducing quantity of 0.1~0.3mm in maximum horizontal displacement is shown.

  • PDF

JSP 공법의 시공 사례 (An Example of JSP Method)

  • 구본충
    • 기술사
    • /
    • 제37권3호
    • /
    • pp.50-53
    • /
    • 2004
  • JSP(Jumbo Super Pile) method is a foundation treatment of mixing in depth, one of the soft ground improvement methods through which settlement and deformation of ground foundation is prevented. An example of this method which is applied for the foundation design of a new drainage pumping station is Introduced, and another applied example for an existing pumping station which is built on soft foundation is also introduced.

  • PDF