• Title/Summary/Keyword: Ground Fault Current Distribution

Search Result 97, Processing Time 0.022 seconds

Optimal Operation Algorithm of Protection Devices in Distribution Systems With PV System (대용량 태양광전원이 연계된 배전선로에 있어서 보호협조기기의 최적 운용알고리즘)

  • Kwon, Soon-hwan;Lee, Hu-dong;Nam, Yang-hyun;Rho, Dae-seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.17-26
    • /
    • 2018
  • If a photovoltaic (PV) system is installed in a primary feeder interconnected with the PV system, bi-directional power flow can occur, and then, the magnitude and direction of the fault current can change, depending on the fault location and point of common coupling (PCC) of the PV system, and the time current curve (TCC) cannot be properly coordinated between protection devices. Also, it is difficult to obtain a proper time interval for protection devices because the conventional setting approach is applied, even though the PV system is installed and operating. Therefore, this paper presents three operation modes considering the operational conditions of the PV system to obtain setting values for protection devices. Based on the mode, this paper proposes an algorithm to calculate the optimal protection coordination time interval according to the introduction capacity of the PV system. In addition, this paper performs modelling of a distribution system with the PV system and protection devices by using Off-DAS S/W, and analyzes the characteristics of the time interval between the protection devices, such as substation relays, reclosers, customer relays, and PV customer relays. The simulation results confirmed that the proposed operational modes and setting-value algorithms are useful and effective for protection coordination in a distribution system for a PV system.

Design of LQR Controller of DSIATCOM for Compensating Voltage Sag Using PSCAD/EMTDC (PSCAD/EMTDC를 이용한 전압 Sag 보상을 위한 배전용 정지형 보상기의 LQR 제어기 설계)

  • 이명언;정수영;최규하
    • Journal of Energy Engineering
    • /
    • v.13 no.1
    • /
    • pp.68-74
    • /
    • 2004
  • This paper presents the design of DSTATCOM (Distribution Static Synchronous Compensator) controller. The results are verified by using PSCAD/EMTDC package. The state equation derived by decomposition analysis of DSTATCOM current component is applied to load model and the combined model which considered constraint condition. In case of single line to ground fault, the conventional method of Pl control is compared with LQR control technique. LQR control is shown to be superior in terms of response profile and composition of voltage sag.

A study on Optimal Operation of Protection Coordination Devices Evaluation System in Distribution System with Distributed Sources (분산전원이 연계된 배전계통에 보호협조기기 평가시스템의 최적운용에 관한 연구)

  • Ji, Sungho;Song, Bangwoon;Kim, Byungki;Rho, Daeseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.2971-2978
    • /
    • 2013
  • Recently, with the world-wide issues about global warming and CO2 reduction, a number of distributed generations(DGs) such as photovoltaic(PV) and wind power(WP), are interconnected with the distribution systems. However, DGs can change the direction of the power flow from one-direction to bi-direction, and also change the direction and amount of fault current of existing distribution systems. Therefore, it may cause the critical problems on the power quality and protection coordination. This paper proposes an operation algorithm for bi-directional protection coordination using and apply it for the evaluation system for protection coordination. From the simulation results It is found that the proposed method is more effective and convenient than existing method.

Operating Characteristics of Protection Coordination Devices in Distribution System interconnected with Distributed Generation (분산전원이 연계된 배전계통에서 보호협조기기의 운용특성에 관한 연구)

  • Kim, So-Hee;Ji, Seong-Ho;Kim, Sun-Young;Rho, Dae-Seok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.2
    • /
    • pp.35-45
    • /
    • 2011
  • Recently, with the increasement of the interest about global warming, pollutions, and so on, a number of distributed generations(DGs) such as photovoltaic(PV) and wind power(WP), are interconnected with distribution systems. However, installing of DGs makes power flow changes such as directions, one-direction to bi-direction, and increasing/decreasing of fault current. Therefore, it may cause the critical problems. This paper proposes an evaluation algorithm for bi-directional protection coordination and presents an evaluation system for protection coordination based on this algorithm. Additionally, the result shows that the existing method may cause critical problems, and also the effectiveness of proposed method is verified.

A study on Protection Coordination Method for Electric Vehicle Charging Facility based on the Wireless Power Transmission (무선전력전송 전기충전설비용 전원공급장치의 최적운용방안에 관한 연구)

  • Ryu, Kyung-Sang;Kim, Byungki;Kim, Dae-Jin;Jang, Moon-Seok;Rho, Daeseok;Ko, Hee-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.42-51
    • /
    • 2017
  • This paper deals with the power supply facility providing wireless power transmission for a type of electric vehicles called the on-line electric vehicle(OLEV) and proposes optimal protection coordination methods which analyze the faultsin the 60Hz and 20kHz bands using PSCAD/EMTDC, which is the typical commercial software for the distribution system. The simulation results show that the proposed methods can reduce the fault current by introducing an NGR (Neutral Ground Resistor) in the 60Hz band and prevent the malfunctioning of the protection device by installing a CT in the neutral wire in the 20kHz band when a ground fault occurs.

A Study on Searching Algorithm for Malfunction Pattern of Protection Devices in Distribution System with PV Systems (태양광전원이 연계된 배전계통 보호협조기기의 부동작패턴 탐색알고리즘에 관한 연구)

  • Kwon, Soon-Hwan;Tae, Dong-Hyun;Lee, Hu-Dong;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.652-661
    • /
    • 2020
  • Recently, the Korean government developed the RE3020 (renewable energy) policy to overcome environmental problems, such as fine dust, climate change, and large-scale PV systems interconnected with a distribution system. When a large-scale PV system is interconnected in the distribution system, however, a malfunction can occur, and the protection devices may not be operated because of the dividing effect depending on the magnitude and direction of fault current as well as connection types and location of the PV system. Therefore, this paper proposes a search algorithm for the malfunction pattern of protection devices based on various scenarios, when large-scale PV systems are operated and interconnected in a distribution system. This paper presents a malfunction mechanism of protection devices according to the installation locations of recloser (R/C). Furthermore, the modeling of a distribution system with large-scale PV systems was performed using Off-DAS S/W, and the malfunction patterns of protection devices were analyzed based on a range of scenarios. From the simulation results with the proposed model and algorithm for searching for protection devices, it was confirmed that they are useful and effective in identifying a malfunction phenomenon depending on the installation location of the R/C and connection type of PV system.

A Study on the Focal Mechanism of the Hongsung Earthquake from the P-Wave Polarity Distributions (초동극성분포를 이용한 홍성지진의 Focal Mechanism 연구)

  • 김준경
    • The Journal of Engineering Geology
    • /
    • v.1 no.1
    • /
    • pp.121-136
    • /
    • 1991
  • The focal mechanism of the Hongsung Earthquake (1978. Oct. 7, M$_L$=5.0, Latitude 36.62N, Longitude 1 26.67E) was evaulated using the polarity distribution of the P-Waveforms. Through the non-linear computer process, the compatibility of polarity distributions of the 9 P-Waveforms observed at teleseismic distances from the Hongsung Earthquake epicenter was investigated to those of the focal mechanism determined from the varying strike, dip and rake angles. The resultant values for the strike and dip angle of the principal fault plane, which apparently matches very well the sunface lineament of the Hongsung region, are determined to be about 247 degree and 78 degree with uncertainties, respectively. However, the rake angle of the focal mechanism has wide range of 40 degree to 160 degree, which is mainly due to the poor coverage of the azimuthal angle of the observed seismic stations. Due to the consistency of principal stress axes, the resultant focal mechanism could support the current stress regime of that region, which may be caused by subduction of the Pacific Plate under the Eurasia Plate along the Japan Trench. It also provides information of seismic source characteristics of the part of the Korean Peninsula for aseismic design criteria such as Site Specific Response Spectrum and Strong Ground Motion Time History for the nuclear power plants and related nuclear waste disposal facility sites.

  • PDF