Simulation for Characteristics Analysis of Grid-connected Wind Power Generation System on MATLAB/Simulink (MATLAB/Simulink에서 계통연계 풍력발전시스템의 특성해석에 대한 시뮬레이션)

  • Ro, Kyoung-Soo;An, Hae-Joon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.8
    • /
    • pp.18-25
    • /
    • 2008
  • The paper presents a modeling of the grid-connected wind turbine generation system on MATLAB/Simulink and aims to perform simulations for analysis of the system's characteristics. It performs a pitch regulation for control of the wind generator's output with respect to wind speed variation, and presents a relationship between interconnecting transformer's connections and fault current by reviewing the variations of fault current according to transformer connections in a grid-connected wind power generation system. It also investigates the effect of grounding methods of the interconnecting transformer's neutral point on fault current variations. The simulation results show the differences of fault currents, voltages and generator's characteristics for a line-to-ground fault according to interconnecting transformer's four different connections, and the differences of fault currents of the system according to grounding methods of the transformer neutral point. Therefore, the case studies demonstrate the effectiveness of the proposed simulation model on Simulink.

Analysis of Electricity Cost Saving Effect by the Optimal load shifting Operation with 1MWh Redox Flow Battery (1MWh급 레독스흐름전지의 부하이전용 최적운전에 따른 전기요금 절감효과 분석)

  • Baek, Ja-Hyun;Ko, Eun-Young;Kang, Tae-Hyuk;Lee, Han-Sang;Cho, Soo-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.7
    • /
    • pp.1151-1160
    • /
    • 2016
  • In recent years, the energy storage systems such as LiB, NaS, RFB(Redox-Flow Battery), Super- capacitor, pumped hydro storage, flywheel, CAES(Compressed Air Energy Storage) and so on have received great attention as practical solutions for the power supply problems. They can be used for various purpose of peak shaving, load leveling and frequency regulation, according to the characteristics of each ESS(energy storage system). This paper will focus at 1 MWh RFB system, which is being developed through the original technology project of energy material. The output of ESS is mainly characterized by C-rate, which means that the total rated capacity of battery will be delivered in 1 hour. And it is a very important factor in the ESS operation scheduling. There can be several options according to the operation intervals 15, 30 and 60minutes. The operation scheduling is based on the optimization to minimize the daily electricity cost. This paper analyzes the cost-saving effects by the each operating time-interval in case that the RFB ESS is optimally scheduled for peak shaving and load leveling.

Outage Rate Calculating Method of Energy Storage System for the Application on Power System Operation (전력계통 운영적용을 위한 전기저장장치 고장률 산정방안)

  • Song, Seung-Heon;Choi, Woo-Yeong;Kook, Kyung-Soo
    • Journal of IKEEE
    • /
    • v.23 no.1
    • /
    • pp.188-192
    • /
    • 2019
  • As the contribution of the Energy Storage System (ESS) on the power system operations has increased, it is required to secure the reliability on the capacity of ESS and this needs to consider the outage rate in calculating the available capacity of ESS. However, the existing method of calculating the outage rate does not consider the configuration of ESS and this does not accurately calculate the available capacity of ESS. For this, this paper analyzes the structural characteristics of ESS in Korean power system and proposes a method to calculate the outage rate of ESS. Through the study cases adopting the Korea Electric Power Corporation (KEPCO) ESS for providing the frequency response service, the effectiveness of the proposed method verified.

Comparison of PI and PR Controller Based Current Control Schemes for Single-Phase Grid-Connected PV Inverter (단상 계통 연계형 태양광 인버터에 사용되는 PI 와 PR 전류제어기의 비교 분석)

  • Vu, Trung-Kien;Seong, Se-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2968-2974
    • /
    • 2010
  • Nowadays, the PV systems have been focused on the grid connection between the power source and the grid. The PV inverter can be considered as the core of the whole system because of an important role in the grid-interfacing operation. An important issue in the inverter control is the load current regulation. In the literature, Proportional Integral (PI) controller, which is normally used in the current-controlled Voltage Source Inverter (VSI), cannot be a satisfactory controller for an AC system because of the steady-sate error and the poor disturbance rejection, especially in high-frequency range. Compared with conventional PI controller, Proportional Resonant (PR) controller can introduce an infinite gain at the fundamental frequency of the AC source; hence it can achieve the zero steady-state error without requiring the complex transformation and the de-coupling technique. Theoretical analyses of both PI and PR controller are presented and verified by simulation and experiment. Both controller are implemented in a 32-bit fixed-point TMS320F2812 DSP processor and evaluated on a 3kW experimental prototype PV Power Conditioning System (PCS). Simulation and experimental results are shown to verify the controller performances.

A Study on The Performance Verification and Economic Evaluation of ESS for Frequency Regulation Application (주파수조정용 ESS의 성능검증 및 경제성평가 알고리즘에 관한 연구)

  • Lee, Ju-Gang;Choi, Sung-Sik;Kang, Min-Kwan;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.5
    • /
    • pp.738-744
    • /
    • 2017
  • Recently, the installation of energy storage systems (ESSs) has increased in parallel with the extension of renewable energy resources. However, there has been no concrete analysis ofthe performance verification and economic evaluation of ESSs,which makes it difficult to perform aneffective installation and operation of an ESS. In particular, there are no international technical standards and guidelines on electric ESS for frequency regulation applications. Therefore, acomprehensive study on the power quality, impact on grid, extent of contribution, and cost benefit study of ESS are strongly being required. Under these backgrounds, this paper proposes a performance verification algorithm on ESS for frequency regulation application based on ananalysis of the AGC(Automatic Generation Control) performance verification method of PJM in USA. In addition,this paper proposes an economic evaluation algorithm on a 500 MW installation of ESS for frequency regulation applications using the account settlement of an expensive gas-fired generation plant and coal-fired power generation plant. From the simulation with real ESS operation data and 500 MW installation case, it wasconfirmed that the ESS showssuperior performance toany other conventional generators and provides anannual benefit of 500 MW ESS are between 345~429 billon won.

Modeling of a Grid-Connected Wind Energy Conversion System for Dynamic Performance Analysis (동특성해석을 위한 계통연계 풍력발전 시스템의 모델링)

  • Choo, Yeoun-Sik;Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1358-1360
    • /
    • 2002
  • This paper presents a modeling and simulation of a utility-connected wind energy conversion system with a link of a rectifier and an inverter. It discusses the maximum power control algorithm for the wind turbine and presents the relationship of wind turbine output, rotor speed, power coefficient, tip-speed ratio and wind speed when the wind turbine is operated under the maximum power control algorithm. The control objective is to extract maximum power from wind and transfer the power to the utility. This is achieved by controlling the pitch angle of the wind turbine blades. Pitch control method is mechanically complicated, but the control performance is better than that of the stall regulation method. The simulation results performed on MATLAB will show the variation of generator's rotor speed, pitch angle, and generator output.

  • PDF

Analysis of Effect of Designated New Technology of Electric Power on the Electrical Construction Industries (전력신기술 제도가 전기공사업계에 미치는 영향 분석)

  • Hwang, Min-Soo;Jeon, Tae-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.2
    • /
    • pp.106-113
    • /
    • 2012
  • Recently laws have been enacted to build and promote the use of smart grid. There are also increasing demands for the compliance with international trade agreements and the related international standards. Due to these rapid changes in electric power industry and the market expansion, importances of new technologies and processes have been being increased. To reflect these international trends, the government have carried out the designation of new technology for electric power industry to promote domestic industries and national competitiveness by inspiring technology developments in individual or private industry sectors. In this paper analysis of the current status of the designation of the new technology of electric power has been presented including its problem and effect on the related industries. The analysis is expected to be utilized to enhance sound development and to vitalize the electrical new technology regulation.

Output Voltage Regulation for Harmonic Compensation under Islanded Mode of Microgrid

  • Lim, Kyungbae;Choi, Jaeho
    • Journal of Power Electronics
    • /
    • v.17 no.2
    • /
    • pp.464-475
    • /
    • 2017
  • This study examines a P+multi resonant-based voltage control for voltage harmonics compensation under the islanded mode of a microgrid. In islanded mode, the inverter is defined as a voltage source to supply the full local load demand without the connection to the grid. On the other hand, the output voltage waveform is distorted by the negative and zero sequence components and current harmonics due to the unbalanced and nonlinear loads. In this paper, the P+multi resonant controller is used to compensate for the voltage harmonics. The gain tuning method is assessed by the tendency analysis of the controller as the variation of gain. In addition, this study analyzes the slight voltage magnitude drop due to the practical form of the P+multi resonant and proposes a counter method to solve this problem by adding the PI-based voltage restoration method. The proposed P+multi resonant controller to compensate for the voltage harmonics is verified through the PSIM simulation and experimental results.

Motor drive control development: a new approach to learning and design

  • Porobic, Vlado;Ivanovic, Zoran;Adzic, Evgenije;Vekic, Marko;Celanovic, Nikola;Oh, Hyounglok
    • Proceedings of the KIPE Conference
    • /
    • 2013.11a
    • /
    • pp.37-38
    • /
    • 2013
  • This paper presents an intuitive and powerful way to study and design motor drive control. The control of induction motors, as most widely used machines, is discussed. Thanks to ultra low latency and high fidelity Hardware-in-the-Loop systems, different aspects of up-to-date drive regulation are examined. A power stage, comprised of a grid voltage source, a rectifier, a VSC inverter and an induction motor, is emulated on the HIL platform in real time. A digital signal controller is plugged into the interface board and connected to the HIL emulation platform, without any hardware modifications. For motor control and power electronics applications, a dedicated Texas Instruments TMS320F2808 DSP is chosen. The same controller can drive an emulation platform and a real device with no modifications. Current and speed control loop test results are presented and discussed.

  • PDF

Distributed N+X Redundant UPS System (분산형 N+X 리던던트 UPS 시스템의 개발)

  • Cho J.S.;Choe G.H.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07a
    • /
    • pp.168-172
    • /
    • 2003
  • This paper presents a non-electrical isolated Prototype of N+X redundant UPS with two-quadrant converter. Proposed topology has multi-functions of battery charge and discharge regulation, operates with a near unity input power factor, compensates unbalanced voltage on U bus capacitors, and regenerates the circulating active power among the inverters into battery or grid. And furthermore, this system adopts a novel wireless parallel operation algorithm of N+X redundant UPS system with no control interconnections. Simulation and experiment results are provided in this paper to prove the validity of proposed topology and wireless control algorithm.

  • PDF