• Title/Summary/Keyword: Global Maximum Point

Search Result 92, Processing Time 0.035 seconds

A Study on the Technology Development and Application Plan for making an Integrated Digital Map of an Electronical Navigational Chart and a Digital Terrain Map (육.해도 통합수치도 제작 기술 개발과 응용 방안+)

  • 이기철;정희균;박창호;서상현;김정희
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.347-356
    • /
    • 1999
  • This study is to develop the technology and the ways of the practical use of the integrated digital map of and Electronical Navigational Chart(ENC) and Digital Terrain Map(DTM) for the effective and scientific based conservation, development and management. In this study, as preliminary studies to make eventual integrated maps, the concept of coastal areas are defined and the characteristics of digital maps developed by Korean Geography Institute and National Marine Investigation Institute are carefully analyzed. A test coastal map was developed based on the integrated digital map, a high resolution satellite image and Global Positioning System. Results from the edge matching analysis of coastal lines shows 8 meters difference in maximum. The problems, causes and solutions for the edge matched differences are described. Furthermore, the practical value of utilization, future use and various field of application are described based on the integrated digital map data base of coast area.

  • PDF

Finite Element Simulation of Elastic Waves for Detecting Defects and Deteriorations in Underwater Steel Plates (수중강판의 결함 및 열화 검출을 위한 탄성파 유한요소 시뮬레이션)

  • Woo, Jinho;Na, Won-Bae
    • Journal of Ocean Engineering and Technology
    • /
    • v.27 no.3
    • /
    • pp.61-66
    • /
    • 2013
  • This paper presents the results of finite element simulations of elastic wave propagation in an underwater steel plate and the verification of a proposed method utilizing elastic wave-based damage detection. For the simulation and verification, we carried out the following procedures. First, three-dimensional finite element models were constructed using a general purpose finite element program. Second, two types of damages (mechanical defects and deteriorations) were applied to the underwater steel plate and three parameters (defect location, defect width, and depth) were considered to adjust the severity of the applied damages. Third, elastic waves were generated using the oblique incident method with a Gaussian tone burst, and the response signals were obtained at the receiving point for each defect or deterioration case. In addition, the received time domain signals were analyzed, particularly by measuring the magnitudes of the maximum amplitudes. Finally, the presence and severity of each type of damage were identified by the decreasing ratios of the maximum amplitudes. The results showed that the received signals for the models had the same global pattern with minor changes in the amplitudes and phases, and the decreasing ratio generally increased as the damage area increased. In addition, we found that the defect depth was more critical than the width in the decrease of the amplitude. This mainly occurred because the layout of the depth interfered with the elastic wave propagation in a more severe manner than the layout of the width. An inverse analysis showed that the proposed method is applicable for detecting mechanical defects and quantifying their severity.

A Study on Loose Part Monitoring System in Nuclear Power Plant Based on Neural Network (원전 금속파편시스템에 신경회로망 적용연구)

  • Kim, Jung-Soo;Hwang, In-Koo;Kim, Jung-Tak;Moon, Byung-Soo;Lyou, Joon
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2002.05a
    • /
    • pp.227-230
    • /
    • 2002
  • The Loose Part Monitoring System(LPMS) has been designed to detect, locate and evaluate detached or loosened parts and foreign objects in the reactor coolant system. In this paper, at first, we presents an application of the back propagation neural network. At the preprocessing step, the moving window average filter is adopted to reject the low frequency background noise components. And then, extracting the acoustic signature such as Starting point of impact signal, Rising time, Half period, and Global time, they are used as the inputs to neural network. Secondly, we applied the neural network algorithm to LPMS in order to estimate the mass of loose parts. We trained the impact test data of YGN3 using the backpropagation method. The input parameter for training is Rising Time, Half Period, Maximum amplitude. The result showed that the neural network would be applied to LPMS. Also, applying the neural network to the Practical false alarm data during startup and impact test signal at nuclear power Plant, the false alarms are reduced effectively. 1.

  • PDF

The Influence of Changing PV Array Interconnections under a Non-uniform Irradiance

  • Ding, Kun;Feng, Li;Qin, Si-Yu;Mao, Jing;Zhang, Jing-Wei;Wang, Xiang;Peng, Tao;Zhai, Quan-Xin
    • Journal of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.631-642
    • /
    • 2016
  • Usually, the output characteristics of a photovoltaic (PV) array are significantly affected by non-uniform irradiance which is caused by ambient obstacles, clouds, orientations, tilts, etc. Some local maximum power points (LMPP) in the current-voltage (I-V) curves of a PV array can result in power losses of the array. However, the output power at the global maximum power point (GMPP) is different in different interconnection schemes in a PV array. Therefore, based on the theoretical analysis and mathematical derivation of different topological structures of a PV array, this paper investigated the output characteristics of dual series PV arrays with different interconnections. The proposed mathematical models were also validated by experimental results. Finally, this paper also concluded that in terms of performance, the total cross tied (TCT) interconnection was not always the optimal structure, especially in a dual series PV array. When one of the PV modules was severely mismatched, the TCT worked worse than the series parallel (SP) structure. This research can provide guidance for switching the interconnection to gain the greatest energy yield in a changeable- structure PV system.

A Multistriped Checkpointing Scheme for the Fault-tolerant Cluster Computers (다중 분할된 구조를 가지는 클러스터 검사점 저장 기법)

  • Chang, Yun-Seok
    • The KIPS Transactions:PartA
    • /
    • v.13A no.7 s.104
    • /
    • pp.607-614
    • /
    • 2006
  • The checkpointing schemes should reduce the process delay through managing the checkpoints of each node to fit the network load to enhance the performance of the process running on the cluster system that write the checkpoints into its global stable storage. For this reason, a cluster system with single IO space on a distributed RAID chooses a suitable checkpointng scheme to get the maximum IO performance and the best rollback recovery efficiency. In this paper, we improved the striped checkpointing scheme with dynamic stripe group size by adapting to the network bandwidth variation at the point of checkpointing. To analyze the performance of the multi striped checkpointing scheme, we applied Linpack HPC benchmark with MPI on our own cluster system with maximum 512 virtual nodes. The benchmark results showed that the multistriped checkpointing scheme has better performance than the striped checkpointing scheme on the checkpoint writing efficiency and rollback recovery at heavy system load.

Local optimization of thruster configuration based on a synthesized positioning capability criterion

  • Xu, Shengwen;Wang, Lei;Wang, Xuefeng
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.7 no.6
    • /
    • pp.1044-1055
    • /
    • 2015
  • DPCap analysis can assist in determining the maximum environmental forces the DP system can counteract for a given heading. DPCap analysis results are highly affected by the thrust forces provided by the thrust system which consists of several kinds of thrusters. The thrust forces and moment are determined by the maximum thrust of the thrusters as well as the thruster configuration. In this paper, a novel local optimization of thruster configuration based on a synthesized positioning capability criterion is proposed. The combination of the discrete locations of the thrusters forms the thruster configuration and is the input, and the synthesized positioning capability is the output. The quantified synthesized positioning capability of the corresponding thruster configuration can be generated as the output. The optimal thruster configuration is the one which makes the vessel has the best positioning capability. A software program was developed based on the present study. A local optimization of thruster configuration for a supply vessel was performed to demonstrate the effectiveness and efficiency of the program. Even though the program cannot find the global optimal thruster configuration, its high efficiency makes it essentially practical in an engineering point. It may be used as a marine research tool and give guidance to the designer of the thrust system.

Automatic Extraction of River Levee Slope Using MMS Point Cloud Data (MMS 포인트 클라우드를 활용한 하천제방 경사도 자동 추출에 관한 연구)

  • Kim, Cheolhwan;Lee, Jisang;Choi, Wonjun;Kim, Wondae;Sohn, Hong-Gyoo
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.5_3
    • /
    • pp.1425-1434
    • /
    • 2021
  • Continuous and periodic data acquisition must be preceded to maintain and manage the river facilities effectively. Adapting the existing general facilities methods, which include river surveying methods such as terrestrial laser scanners, total stations, and Global Navigation Satellite System (GNSS), has limitation in terms of its costs, manpower, and times to acquire spatial information since the river facilities are distributed across the wide and long area. On the other hand, the Mobile Mapping System (MMS) has comparative advantage in acquiring the data of river facilities since it constructs three-dimensional spatial information while moving. By using the MMS, 184,646,009 points could be attained for Anyang stream with a length of 4 kilometers only in 20 minutes. Levee points were divided at intervals of 10 meters so that about 378 levee cross sections were generated. In addition, the waterside maximum and average slope could be automatically calculated by separating slope plane form levee point cloud, and the accuracy of RMSE was confirmed by comparing with manually calculated slope. The reference slope was calculated manually by plotting point cloud of levee slope plane and selecting two points that use location information when calculating the slope. Also, as a result of comparing the water side slope with slope standard in basic river plan for Anyang stream, it is confirmed that inspecting the river facilities with the MMS point cloud is highly recommended than the existing river survey.

A feasibility modeling of potential dam site for hydroelectricity based on ASTGTM DEM data (ASTGTM 전지구 DEM 기반의 수력발전댐 적지분석 사전모델링)

  • Jang, Wonjin;Lee, Yonggwan;Kim, Seongjoon
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.545-555
    • /
    • 2020
  • A feasibility modeling for potential hydroelectric dam site selection was suggested using 1 sec ASTGTM (ASTER Global Digital Elevation Model) and Terra/Aqua MODIS (Moderate Resolution Imaging Spectroradiometer) derived land use (MCD12Q1) data. The modeling includes DEM pre-processing of peak, sink, and flat, river network generation, watershed delineation and segmentation, terrain analysis of stream cross section and reservoir storage, and estimation of submerged area for compensation. The modeling algorithms were developed using Python and as an open source GIS. When a user-defined stream point is selected, the model evaluates potential hydroelectric head, reservoir surface area and storage capacity curve, watershed time of concentration from DEM, and compensation area from land use data. The model was tested for 4 locations of already constructed Buhang, BohyunMountain, Sungdeok, and Yeongju dams. The modeling results obtained maximum possible heads of 37.0, 67.0, 73.0, 42.0 m, surface areas of 1.81, 2.4, 2.8, 8.8 ㎢, storages of 35.9, 68.0, 91.3, 168.3×106 ㎥ respectively. BohyunMountain and Sungdeok show validity but in case of Buhang and Yeongju dams have maximum head errors. These errors came from the stream generation error due to ASTGTM. So, wrong dam watershed boundary limit the head. This study showed a possibility to estimate potential hydroelectric dam sites before field investigation especially for overseas project.

Generation of Ionospheric Delay in Time Comparison for a Specific GEO Satellite by Using Bernese Software

  • Jeong, Kwang Seob;Lee, Young Kyu;Yang, Sung Hoon;Hwang, Sang-wook;Kim, Sanhae;Song, Kyu-Ha;Lee, Wonjin;Ko, Jae Heon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.6 no.3
    • /
    • pp.125-133
    • /
    • 2017
  • Time comparison is necessary for the verification and synchronization of the clock. Two-way satellite time and frequency (TWSTFT) is a method for time comparison over long distances. This method includes errors such as atmospheric effects, satellite motion, and environmental conditions. Ionospheric delay is one of the significant time comparison error in case of the carrier-phase TWSTFT (TWCP). Global Ionosphere Map (GIM) from Center for Orbit Determination in Europe (CODE) is used to compare with Bernese. Thin shell model of the ionosphere is used for the calculation of the Ionosphere Pierce Point (IPP) between stations and a GEO satellite. Korea Research Institute of Standards and Science (KRISS) and Koganei (KGNI) stations are used, and the analysis is conducted at 29 January 2017. Vertical Total Electron Content (VTEC) which is generated by Bernese at the latitude and longitude of the receiver by processing a Receiver Independent Exchange (RINEX) observation file that is generated from the receiver has demonstrated adequacy by showing similar variation trends with the CODE GIM. Bernese also has showed the capability to produce high resolution IONosphere map EXchange (IONEX) data compared to the CODE GIM. At each station IPP, VTEC difference in two stations showed absolute maximum 3.3 and 2.3 Total Electron Content Unit (TECU) in Bernese and GIM, respectively. The ionospheric delay of the TWCP has showed maximum 5.69 and 2.54 ps from Bernese and CODE GIM, respectively. Bernese could correct up to 6.29 ps in ionospheric delay rather than using CODE GIM. The peak-to-peak value of the ionospheric delay for TWCP in Bernese is about 10 ps, and this has to be eliminated to get high precision TWCP results. The $10^{-16}$ level uncertainty of atomic clock corresponds to 10 ps for 1 day averaging time, so time synchronization performance needs less than 10 ps. Current time synchronization of a satellite and ground station is about 2 ns level, but the smaller required performance, like less than 1 ns, the better. In this perspective, since the ionospheric delay could exceed over 100 ps in a long baseline different from this short baseline case, the elimination of the ionospheric delay is thought to be important for more high precision time synchronization of a satellite and ground station. This paper showed detailed method how to eliminate ionospheric delay for TWCP, and a specific case is applied by using this technique. Anyone could apply this method to establish high precision TWCP capability, and it is possible to use other software such as GIPSYOASIS and GPSTk. This TWCP could be applied in the high precision atomic clocks and used in the ground stations of the future domestic satellite navigation system.

A New Algorithm for the Interpretation of Joint Orientation Using Multistage Convergent Photographing Technique (수렴다중촬영기법을 이용한 새로운 절리방향 해석방법)

  • 김재동;김종훈
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.486-494
    • /
    • 2003
  • When the orientations of joints are measured on a rock exposure, there are frequent cases that are difficult to approach by the surveyor to the target joints or to set up scanlines on the slope. In this study, to complement such limit and weak points, a new algorithm was developed to interpret joint orientation from analyzing the images of rock slope. As a method of arranging the multiple images of a rock slope, the multistage convergent photographing system was introduced to overcome the limitation of photographing direction which existing method such as parallel stereophotogrammetric system has and to cover the range of image measurement, which is the overlapping area between the image pair, to a maximum extent. To determine camera parameters in the perspective projection equation that are the main elements of the analysis method, a new method was developed introducing three ground control points and single ground guide point. This method could be considered to be very simple compared with other existing methods using a number of ground control points and complicated analysis process. So the global coordinates of a specific point on a rock slope could be analyzed with this new method. The orientation of a joint could be calculated using the normal vector of the joint surface which can be derived from the global coordinates of several points on the joint surface analyzed from the images.