• Title/Summary/Keyword: Global Construction

Search Result 1,363, Processing Time 0.028 seconds

Opportunities for Synergistic Collaboration between U.S. and Asia in Construction Business, Research, and Education

  • Liu, LiangY.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.3-8
    • /
    • 2007
  • "The world is flat" as the popular author Thomas L. Friedman declares in his best belling book about the progress of business globalization in the $21^{st}$ century [3]. Construction projects and related businesses have been global since the 1800's, but it has never seen such rapid transformation in both scope and depth as in the past decade. Construction projects today often bring together international design talents, construction management firms, local and international labor forces, and global suppliers. On a visit to Dubai in the United Arab Emirates on the Persian Gulf, a person will experience the complexity of globalization of modern construction projects- with Arab owners, European engineering and design companies, American construction management teams, Korean general contractors, Jordanian subcontractors, and labor forces from Thailand, Indonesia, Turkey, and Sri Lanka. A count of material suppliers reveals over 60 countries involved, covering all continents. Indeed construction projects are getting more and more complex and competitive, as is the project execution. The trend toward globalization poses both challenges and opportunities to construction and engineering companies competing on a global scale. While global competition may be a threat to many companies, there are, however, many opportunities for synergistic collaborations that can create win-win scenarios for construction business, research, and education. This paper presents some of the opportunities between the U.S. and Asia in business integration, research collaboration on technologies, and educational development, which may mutually benefit countries on either side of the Pacific.

  • PDF

Global Construction Business Management (글로벌 건설경영)

  • Shim Og-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2002
  • Foreign construction requires the globalization of management structure and role execution as a global manager. Therefore, this paper prospects the light and shadow of Korea construction business with the consideration about the foreign construction market and Korea's foreign construction. This paper interprets meaning about the foreign construction and analyzes the distinction, strategy, and competitive factor of foreign construction business. On the basis of interpretation and analysis, this paper suggests the innovative change of the domestic construction business manager and management system.

  • PDF

Development Direction of National Competitiveness Evaluation Model in Construction Industry (건설산업의 국가경쟁력 평가모델 개발방향에 관한 연구)

  • Park, Hwan Pyo;Chin, Kyung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.111-114
    • /
    • 2011
  • Korea construction industry needs to secure its competitiveness in global construction markets and to urgently find out the proper approaches in consideration of the current situation of Korean construction enterprises and environmental changes in the international market. Korea has national plan to improve the competitive level of the construction industry. Expecially, Government is trying to build the global system in construction industry. But there are no the related national competitive date. Therefore, this paper suggested national competitive indicators and development direction in construction industry. And this research has presented the competitiveness analysis of construction industry with the consideration of condition of infrastructure, transparency and technological competitiveness.

  • PDF

Gap Analysis between Required Technology in the Global Market and Supply of Construction Re-education (글로벌 건설시장에서의 요구기술과 건설재교육 공급현황 간 차이분석을 통한 개선방안 도출)

  • Lee, Seul-Ki;Shin, Seoung-Woo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.77-86
    • /
    • 2018
  • Demand for construction technology is expected to change due to changes in domestic and foreign construction markets and the fourth industrial revolution. In particular, demand for project management strategy and project management capability is even more increasing rather than existing production technology capability. However, the current re-education program for engineers and technicians in construction industry is not matching the need of improving capacity required to reflect the demand of construction technology from construction industry. Therefore, in this study, as a part of efforts in innovating the current global construction talent re-education system to cope with the change in the construction industry, we analyzed the difference between the demand of construction technology and the present condition of construction re-education program. In order to investigate the current status of re-education of construction, questionnaires were prepared to gather opinions from construction engineers who attended construction re-education program and also from industrial partners that are jointly doing business. This study can be an example to improve the construction re-education program as a system for substantially reinforcing the competence of engineers rather than those programs that are merely verifying and/or extending engineers' certification.

An analysis on the International Construction Market and the Business Performance of Top Contractors after the Global Financial Crisis

  • Sung, Yookyung;Choi, Seok-In
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.736-737
    • /
    • 2015
  • In these days, international construction market including construction companies has much grown due to globalization and economic boom in the mid 2000's. The size of international construction market, measured with overseas revenue of 225 construction firms, has expanded 2.7 times from 2003 to 2008 according to the ENR. However, after the global financial crisis of 2008 it has faced condition of low growth. In this research, major changes of international construction market and top contractors have been studied. In this study, changes of international construction market have been analyzed in the aspect of region and product including general buildings, transportation, petroleum, etc. Then, in order to find the changes of top contractors which obtained good accomplishment, business performance of companies have been examined by the compound annual growth rate, profit margin and international revenue by comparing the data before 2008 and after. The purpose of the study is to understand major changes of international construction market. Also, strategy changes of top contractors against market stagnation, profit depreciation, high competition have been inferred through the study. The result of the study would contribute to analyzing the strategies of construction companies in international market.

  • PDF

Relative Effects on Construction Workers' Safety Behavior Between Global Feedback and Specific Feedback (구체적 피드백과 포괄적 피드백이 건설 현장 근로자들의 안전 행동에 미치는 상대적 효과 검증)

  • Lee, Kye-Hoon;Oah, She-Zeen
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.5
    • /
    • pp.62-68
    • /
    • 2010
  • The main purpose of this study was to examine relative effects on safety behaviors between global feedback and specific feedback at a construction site. Participants were 30 full-time workers at a construction site. Five safety related behaviors were identified as critical behaviors. An ABCB within-group design was adopted. After baseline (A), participants received global feedback on their average percentage of all five target safety behaviors (B). In the next phase, participants received specific feedback on the percentages of individual target behaviors (C). In the final phase, the global feedback condition was reintroduced (B). Results showed that both global feedback and specific feedback were effective in increasing the frequencies of safety behaviors and there were no differences in the effectiveness between the two types of feedbacks.

The global standard realizing process of the Automobile Assembly Facility

  • Nashimoto, Tomoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.24-25
    • /
    • 2015
  • To realize the global standard of the assembly facility, one of key point is an influence of local characteristic. The global standardized information could be a useful input, especially at the beginning stage of the project. The content should be carefully checked against local requirements, in order to develop an Assembly Facility design to meet local regulations & characteristics. The level of input information required in each step is different depend on regions & countries. At an execution stage of the project, the global standard input needs to be updated as customized final input for the construction. There will be many issues to be clarified and coordinated so that the Assembly facilities meet the final requirements for the production technology. As a result, it is important to understand the timing to use the global standard information and the contents what is needed to adapt to the local characteristics. And close collaboration between production technology team and facility team is always required.

  • PDF

RESPONDING TO GLOBAL ISSUES: SUSTAINABILITY AND INNOVATION IN THE AUSTRALIAN SME RESIDENTIAL BUILDING CONSTRUCTION SECTOR

  • D.S. Thorpe;N. Ryan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.684-693
    • /
    • 2007
  • The construction industry is a significant component of many economies and typically contains a high proportion of small and medium enterprises. However, it is generally understood that this industry is fragmented, adversarial, not highly innovative and not quick to respond to change. At the same time, the industry is under pressure to continue to embrace new technologies and methods, and to adapt better to current and emerging global issues such as sustainability. In order to meet these challenges, firms in the industry need to understand the issues involved and manage their practices accordingly. This paper describes exploratory research into the role of innovative and environmentally sustainable design and construction practices in one group of construction firms, viz., smaller residential building firms in Queensland, Australia.

  • PDF

The present and future of SWRO-PRO hybrid desalination technology development (SWRO-PRO 복합해수담수화 기술의 현재와 미래)

  • Chung, Kyungmi;Yeo, In-Ho;Lee, Wonil;Oh, Young Khee;Park, Tae Shin;Park, Yong-gyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.4
    • /
    • pp.401-408
    • /
    • 2016
  • Desalination is getting more attention as an alternative to solve a global water shortage problem in the future. Especially, a desalination technology is being expected as a new growth engine of Korea's overseas plant business besides one of the solutions of domestic water shortage problem. In the past, a thermal evaporation technology was a predominant method in desalination market, but more than 75% of the current market is hold by a membrane-based reverse osmosis technology because of its lower energy consumption rate for desalination. In the future, it is expected to have more energy efficient desalination process. Accordingly, various processes are being developed to further enhance the desalination energy efficiency. One of the promising technologies is a desalination process combined with Pressure Retarded Osmosis (PRO) process. The PRO technology is able to generate energy by using osmotic pressure of seawater or desalination brine. And the other benefits are that it has no emission of $CO_2$ and the limited impact of external environmental factors. However, it is not commercialized yet because a high-performance PRO membrane and module, and a PRO system optimization technology is not sufficiently developed. In this paper, the recent research direction and progress of the SWRO-PRO hybrid desalination was discussed regarding a PRO membrane and module, an energy recovery system, pre-treatment and system optimization technologies, and so on.

A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application (GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례)

  • Lee, Jae-Kwang;Cho, Min-Ho
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.