Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.181-186
/
2006
Estimation based on current data of construction performances have become one of the critical subjects which many researchers have been interested in for the past decades. In order to accomplish accurate measurement and estimation of construction performances, the method of data collection stands the highest priority. However, there are many difficulties in data collection from construction jobsite due to the characteristics of the construction industry. With developments of new technologies in other industries, several technologies has recently initiated to be applied to construction field. Electronic tags based on the identification technology, automatic volume measurement based on laser scanning technology, and Global Positioning System (GPS) have been represented the technologies which show the high opportunity for being used in construction. This study reviews specific aspects of these technologies focused on the utilization in construction jobsite. Also, the challenges which these technologies need to overcome are discussed.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.100-101
/
2018
Environmental problems caused by air pollution have been considered as serious critical issues in global perspectives. Controlling greenhouse gases has become one of the major environmental problems in construction fields as well. However, similar studies were mainly focused on suggestion of various methodologies for measuring CO2 emissions of construction equipment and calculating emissions. This study aims to analyze the correlation between the CO2 emissions and RPMs of equipment by the construction process based on row data collected from construction equipment actually operated in job sites. This study allows site personnels to determine the amount of emitted CO2 under particular construction equipment under specific conditions during the targeted construction operations. The research findings expect to be used as fundamental informations for establishing environment-friendly construction operation planning.
International conference on construction engineering and project management
/
2009.05a
/
pp.237-241
/
2009
Automation and robotic technology (ART) has been successfully applied in the manufacturing and allied industries to achieve on-time delivery of quality products at increasingly reduced costs. Meeting time, quality and cost targets still remains a big challenge in the global construction industry with prevalence of time and cost overruns. Application of ART in the construction industry could contribute to significant improvement in the efficient and effective delivery of projects to meet and exceed client expectations. However, the uptake of ART is still low in the construction industry. This study investigates the various ways in which ART could be applied to improve construction project delivery, potential areas of applications, and constraints to the uptake of the technology in the construction industry. Recommendations are made for improving the uptake of ART in the construction industry.
Recently, geosynthetic reinforced earth walls are gradually replacing conventional concrete retaining walls for reasons of economy, expediency of construction, and aesthetics. A number of reinforced soil walls having more than 10m heights have been constructed to make more effective development in the country. However, mistakes in design and construction of reinforced earth walls have resulted in many troubles such as failure of reinforced earth walls, horizontal deformationor breakdown of facings, and so forth during or after construction. In this paper, a case study on global sliding failure of a geogrid-reinforced tiered wall is carried out to investigate the causes of the failure and suggest the proper countermeasures. From the subsurface investigation and field instrumentation, It is found that the cause of the global sliding failure was occurred by decreasing of bearing capacity of foundation ground induced by infiltration of rainwater.
This paper investigated the teaching and teaming of contents-related graphing in Korean secondary textbooks and suggested the improved methods of graph instruction through this analysis. reification-the case of function, In Harel, G., Dubinsky(Eds.), The Concept of Function : Aspects of Epistemology and Pedagogy Textbooks are analyzed from the viewpoint of the proportion of graphing contents, their sequencing, the proportion of each domain in graphing activities (interpretation vs. construction, quantitative vs. qualitative aspect, local vs. global aspect) and tasks (prediction, translation, scaling), and the difference in the graphing contents between the sixth and the seventh curriculum. This analysis demonstrates that graphing contents are increasing in textbooks, therefore the high school textbooks appear in almost every content area. The graphing activities concentrate on the construction, the quantitative aspects, and the local aspects, and are gradually focusing on the interpretation and global aspects of high school textbooks. Furthermore, most of graphing tasks favor translation. In contrast, the current seventh curriculum includes a balance of interpretation and construction activities and has more global aspects than the sixth curriculum based textbooks; however, the qualitative approach still rarely appears. For the graphing tasks, translation is still prevalent, but the importances of prediction tasks based on graph have increased in comparison with the sixth curriculum textbooks. Further, the seventh curriculum based textbooks are designed to stimulate more dynamic graphing instruction by introducing new tools such as graphing calculators and computer software. We suggest that the qualitative and global aspects should be emphasized in early graph instruction, a variety of graph activities in realistic contexts should be performed, and educational technology such as graphing calculator and computer can be efficient to implement these ideas.
Lim, Chaeyeon;Jung, Euntae;Lee, Seongho;Jang, Changsun;Oh, Chaewoon;Shin, Kyung Nam
Journal of Energy Engineering
/
v.29
no.3
/
pp.57-63
/
2020
In this paper, we reported that the global trend of cement production and utilization as raw materials and as a fuel. As we know, cement is one of the significant materials required for the construction industry. The recent trend of rising urbanization, both the cement and construction industry played a vital role. The cement industry is a major sustainable infrastructure for the countries. Currently, China producing cement half of the world's cement production. During the year 2018, Korea producing cements nearly 57.5 million metric tons. Waste materials are used as circular resources and also having tremendous benefits for cement production. Another important use of these circular resources is fuel for the cement industry. There is a large potential benefit of the cement industry, but it's creating a severe environmental threat. The cement industry contributes to the major emissions of CO2. This leads the global warming. As per the Paris agreement, the Korean government initiated the recycling policy of waste materials and also the utilization of circular resources for the prevention of limited natural resources and also the global warming effect.
D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
International conference on construction engineering and project management
/
2005.10a
/
pp.366-370
/
2005
The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.
International conference on construction engineering and project management
/
2015.10a
/
pp.49-50
/
2015
Since the mid-2000s, Korean large-sized construction companies have pursued in earnest to expand their business to global construction market in surroundings that domestic market have a continuous and long-term stagnation. However, during last a few years, they have experienced the serious financial loss from international projects. In the meantime, for the sound improvement of Korean construction industry, many stakeholders long for efficient early warning signals to generally monitor and track the potential risks of international projects. In this study, we introduce an International Project Risk Index (IPRI), which is derived from massive data provided by large-sized companies, and expect to provide the practitioners and decision makers as an aid to proactively cope with the change of the potential risks. The outcomes from the IPRI can be utilized to prepare a timely management strategy and to establish an appropriate government support regulation.
International conference on construction engineering and project management
/
2015.10a
/
pp.21-22
/
2015
Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.
International conference on construction engineering and project management
/
2015.10a
/
pp.614-615
/
2015
In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.