• Title/Summary/Keyword: Geothermal Heat Exchanger(GHEX)

Search Result 8, Processing Time 0.023 seconds

Development of High Peformance Geothermal heatexchanger (고성능저가형 지중열교환기 개발연구)

  • An, Hyung-Jun;Baek, Sung-Kwon;Im, Sung-Kyun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.470-473
    • /
    • 2007
  • Geothermal heat exchanger(GHEX) is a major component of Geothermal heat pump system(GSHPs). In Common, We use the vertical type GHEX in Korea. But vertical type GHEX needs a high cost for installation, because of drilling the hole which has 200m depth at max. So, We suggest the use of horizontal type GHEX. When we construct buildins, We excavate the ground and we can install the horizontal type GHEX at the excavated underground. It's very cheap and convenient method compare to vertical type GHEX installation. This study is peformed to estimate the peformance of horizontal type GHEX and to analyze effects of heat exchanger types and undergroundwater. As the result, slinky type GHEX has a 66% efficiency compare to vertical type GHEX and mat type has a 201% efficiency at the undergroundwater zone.

  • PDF

Effect of the Design Parameters of Geothermal Heat Exchanger Design Length (설계변수가 수직밀폐형 지중열교환기 설계길이에 미치는 영향)

  • Min, Kyong-Chon;Choi, Jae-Ho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.2
    • /
    • pp.10-15
    • /
    • 2011
  • A ground loop heat exchanger for the ground source heat pump system is the core equipment determining the thermal performance and initial cost of the system The length and performance of the heat exchanger is dependent on the ground thermal conductivity, the operation hours, the ground loop diameter, the grout, the ground loop arrangement, the pipe placement and the design temperature. The result of this simulation shows that higher thermal conductivity of grouting materials leads to the decrease length of geothermal heat exchanger from 100.0 to 84.4%.

A Study on the Integrated Computer Program for the Multi Analysis of In-Situ Aquifer and Geothermal Response Test (현장 열응답시험과 현장 대수성시험결과를 동시 분석 가능한 통합전산 Program에 관한 연구)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang;Yonn, Yun-Sang
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.4 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • Groundwater flow in confined aquifer and heat transport in underground geologic media are using same governing equation(line source) like well fuction. Therefore the conventional slope method using only later data obtained from in-situ thermal response test to determine the thermal conductivity of vertical geothermal heat exchanger(GHEX) is basically identical with one of Theis straight line method of aquifer test under artesian condition. In case that the pumping rate(Q, $m^3$/d) and drawdown(s,m) which are used for input data of existing hydrogeologic computer programs for aquifer test are replaced and converted to supplying heat energy per unit length of bore hole(Q/L,w/m or Kcal/h.m) and temperatures (T,$^{\circ}C$)measured at in and out-let of GHEX as in put data respectively, thermal conductivity around geothermal heat exchanger can be easily estimated without any special modification of the existing hydrogeologic computer program. Two numbers of time series temperature variation data obtained from in situ geothermal response test are analized using Theismethods(standard curve and straight line method) by using existing aquifer test program and conventional Slope method proposed by ASHRAE. The results show that thermal conductivity values estimated by two straight methods are identical and the difference of estimated values between standard curve methods and Slope method are also within acceptable ranges. In general,the thermal conductivity estimated from Theis straight linemethod gives more accurate value than the one of Slope method due to that Slope method uses only visual matching otherwise Theis method uses automatic curve matching estimation with reducing RSS.

  • PDF

The Comparison of the EWT&LWT between Field Measurement and CFD of Vertical-type Geothermal Heat Exchanger (수직형 지열교환기의 입.출구온도에 대한 실측과 CFD 결과 비교)

  • Woo, Sang-Woo;Kim, Joong-Hun;Shin, Seung-Ho;Hwang, Kwang-Il
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.3 no.1
    • /
    • pp.11-16
    • /
    • 2007
  • The purpose of this study is to use the CFD(Computational Fluid Dynamics) method for the ground source heat pump(GSHP) system with vertical U-tube ground heat exchangers. In order to predict LWT(leaving water temperature) in the length of time, This simulation is used by utilizing FLUENT which is commercial CFD code. It was performed by based on four boreholes in the field. Comparing with the results of CFD and field measurement for LWT, the results of CFD was presented very good agreement with 1.0% average difference.

  • PDF

An Experimental Study on the Thermal Performance Change of Horizontal-type Geothermal Heat Exchanger with Long-Term Operation (수평형 지열교환기 성능의 경년변화)

  • Hwang, Kwang-Il;Woo, Sang-Woo;Kim, Joong-Hun;Yang, Gi-Young;Shin, Seung-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.725-730
    • /
    • 2006
  • The purpose of this study is on the performance evaluation of horizontally installed GHEX(Geothermal Heat Exchanger, HGHEX) which has been operated for 5 years successfully. Followings are the results. Firstly, in summer season, on Aug. 2000, $33^{\circ}C$ water was flowing out from HGHEX with continuous operating method, and $27{\sim}29^{\circ}C$ with interval operating method on Jul. 2005. But $2.5{\sim}3.0^{\circ}C$ temperature differences are gained from HGHEX. Secondly, in winter season, on Nov. 2000, $25^{\circ}C$ water was flowing out from HGHEX with continuous operating method, and $13{\sim}15^{\circ}C$ with interval operating method on Jan. 2006. But with each operating method, only $0.1^{\circ}C$ and $0.7^{\circ}C$ temperature differences are gained from HGHEX respectively. As the conclusion of this study, at the point of continuos operating method, seasonal balance of heating and cooling loads, and at the point of interval operating method, balance for geothermal restoring time respectively must be considered for better system performances.

  • PDF

Design Guidlines of Geothermal Heat Pump System Using Standing Column Well (수주지열정(SCW)을 이용한 천부지열 냉난방시스템 설계지침)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang;Hahn, Chan;Kim, Hyong-Soo;Jeon, Jae-Soo
    • Economic and Environmental Geology
    • /
    • v.39 no.5 s.180
    • /
    • pp.607-613
    • /
    • 2006
  • For the reasonable use of low grade-shallow geothermal energy by Standing Column Well(SCW) system, the basic requirements are depth-wise increase of earth temperature like $2^{\circ}C$ per every 100m depth, sufficient amount of groundwater production being about 10 to 30% of the design flow rate of GSHP with good water quality and moderate temperature, and non-collapsing of borehole wall during reinjection of circulating water into the SCW. A closed loop type-vertical ground heat exchanger(GHEX) with $100{\sim}150m$ deep can supply geothermal energy of 2 to 3 RT but a SCW with $400{\sim}500m$ deep can provide $30{\sim}40RT$ being equivalent to 10 to 15 numbers of GHEX as well requires smaller space. Being considered as an alternative of vertical GHEX, many numbers of SCW have been widely constructed in whole country without any account for site specific hydrogeologic and geothermal characteristics. When those are designed and constructed under the base of insufficient knowledges of hydrgeothermal properties of the relevant specific site as our current situations, a bad reputation will be created and it will hamper a rational utilization of geothermal energy using SCW in the near future. This paper is prepared for providing a guideline of SCW design comportable to our hydrogeothermal system.

Evaluation on in-situ Heat Exchange Efficiency of Energy Slab According to Pipe Materials and Configurations (파이프 재질 및 형태에 따른 에너지 슬래브의 현장 열교환 성능 평가)

  • Lee, Seokjae;Oh, Kwanggeun;Han, Shin-in;Park, Sangwoo;Choi, Hangseok
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.13 no.4
    • /
    • pp.1-7
    • /
    • 2017
  • The energy slab is a ground coupled heat exchanger equipped in building slab structures, which represents a layout similar to the horizontal ground heat exchanger (GHEX). The energy slab is installed as one component of the floor slab layers in order to utilize the underground structure as a hybrid energy structure. However, as the energy slab is horizontally arranged, its thermal performance is inevitably less than the conventional vertical GHEXs. Therefore, stainless steel (STS) pipes are alternatively considered as a heat exchanger instead of high density polyethylene (HDPE) pipes in order to enhance thermal performance of GHEXs. Moreover, not only a floor slab but also a wall slab can be utilized as a heat-exchangeable energy slab in order to maximize the use of underground space effectively. In this paper, four field-scale energy slabs were constructed in a test bed, which consist of the STS and HDPE pipe, and a series of thermal response tests (TRTs) was conducted to evaluate relative heat exchange efficiency per unit pipe length according to the pipe material and the configuration of energy slabs. The energy slab equipped with the STS pipe shows higher thermal performance than the energy slab with the HDPE pipe. In addition, thermal performance of the wall-type energy slab is almost equivalent to the floor-type energy slab.

A Performance Prediction of a Vertical-type Geothermal Heat Exchanger by CFD Analysis (CFD 해석에 의한 수직형 지열교환기의 성능예측)

  • Woo, Sang-Woo;Hwang, Kwang-Il;Kim, Jong-Hun;Shin, Seung-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.3
    • /
    • pp.117-125
    • /
    • 2007
  • This study proposes a CFD(Computational Fluid Dynamics) analysis as a method of verification of the designed-data and a supplement of the insufficient experiences in geothermal system, which shows a rapid growth among the renewable energies. The followings are the results. FLUENT 6.2.12 is used as a CFD tool on this study, with the equations of continuity, motion, energy for unsteady flow through pipes and k-epsilon turbulent model. S-type model which has one borehole with diameter 12m by depth 206m and T-type model which has 3 boreholes with $12m{\times}20m{\times}206m$ are proposed, and also the boundary conditions are described. The temperature differences between temperatures by CFD analysis and by on-site measurement are less than 1.5%, this shows a high reliability of CFD analysis process which this study proposes. After 11 days simulation operated 12 hours interval On/Off mode, it is clearly predicted that the outlet temperatures of geothermal pipes are increased by $1.2^{\circ}C$, and $2.2^{\circ}C$ after 4 months. And the outlet temperatures of geothermal pipes increased with increase of the mass flow rates through the pipes. T-type model shows that the 4m distance between boreholes are reasonable because the temperatures at 2m and 6m from boreholes are nearly same.