• Title/Summary/Keyword: Geopier

Search Result 3, Processing Time 0.019 seconds

Application of Rammed Aggregate Pier(Geopier) for Foundation Reinforcement of Structures (구조물 기초보강용 짧은 쇄석다짐말뚝(Geopier)의 적용성 및 활용방안에 관한 연구)

  • Joeng, Gyong-Hwan;Jung, Sun-Tae;Moon, Jun-Bai;Kim, Dong-Jun;Baek, Kyung-Jong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.479-488
    • /
    • 2005
  • Geopier soil reinforcement system which crushed aggregate is put into a hole and rammed the aggregate with tamper is a viable alternative to deep foundation to over-excavation and replacement. Also, Geopier is intermediate foundation of deep and shallow foundation. In this paper, the value of Geopier element stiffness modulus($K_g$) when designed is compared with the measured value($K_g$) by the in-situ modulus Load test in the field. Also, this paper presents a technology overview of system capabilities and application for foundation reinforcement of structures.

  • PDF

A Study on Bearing Capacity for Installed Rammed Aggregate Pier (RAP의 배치형태에 따른 지지력에 관한 연구)

  • Kim, Younghun;Cho, Changkoo;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.5
    • /
    • pp.19-26
    • /
    • 2009
  • Rammed Aggregate Pier (RAP) method is intermediate foundation between deep and shallow foundation, and it has been built in world wide. RAP represents a relatively new method that has grown steadily over 19 years since Geopier of USA developed this revolutionary method in 1989. The investigation and research in domestic is not accomplished. In this paper, the examined details of different spacing of piles, bearing capacities, respectively, conclude with recommendations on how RAP can be used in future needs. This documentation further provides comparisons of the laboratory test results which were obtained from changing the spacing of piles, namely installed rammed aggregate pier. Laboratory model test was administered in a sand box. Strain control test was conducted to determine the bearing capacities of the piers; 20 mm, 30 mm and 40 mm RAP in diameter using drilling equipment to make holes were installed in sand at initial relative densities of 40%. By comparing different spacing of piles, in this experiment, piles are spaced structually span, form a ring shape, narrowing the distance of each other, to the center. the result shows that as diameter of pier is bigger in diameter, bearing capacity also dramatically increased due to raised stiffness. Also, as the space between each piers was closed, the settlement rate of soil was decreased significantly. From the test results, as the space between each piles were getting closer, it allows greater chances to have more resistance to deformation, and shows more improved stability of structures. After from the verification work which is continuous leads the accumulation of the site measuring data which is various, and bearing capacity and the settlement is a plan where the research will be advanced for optimum installed RAP.

  • PDF