• Title/Summary/Keyword: Generator set

Search Result 388, Processing Time 0.026 seconds

Development of Optimal Power Flow for the Ancillary Service of Reactive Power Generation under Restructuring Environment (전력산업 구조개편 환경 하에서 무효전력 보조서비스 운용을 위한 최적조류계산법 개발)

  • Lee, Seung-Ryeol;Lee, Byeong-Jun;Song, Tae-Yong;Jeong, Min-Hwa;Mun, Yeong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.1
    • /
    • pp.37-44
    • /
    • 2002
  • This Paper suggests reasonable pricing mathod fur Reactive Power in Optimal Power Flow for the system analysis. Under restructuring, not only real power pricing but also reactive power pricing is important for the system analysis and operation. If people just focus on real power pricing, the Generators may no generate reactive power voluntarily, because the Generators may not recover the cost of the reactive power generation. So making a reasonable reactive power pricing is becoming more important than any other time. In this paper, the authors set a Proper Power factor and price the portion of the reactive power that exceeds the power factor using Interior Point Method. By applying this method, the System operator can use this strategy for the analysis of reactive power generation pricing and the Generator can get the motivation to generate reactive power. The author develops fully optimized fast Primal Dual Interior Point Method with sparsity technique and applies this method to Reliability Test System (RTS24) and KEPCO 674 bus system (684 buses. 1279 lines). It shows adaptability and usefulness.

The Component Sizing Process and Performance Analysis of Extended-Range Electric Vehicles (E-REV) Considering Required Vehicle Performance (SUV급 E-REV의 요구 동력 성능을 고려한 동력원 용량선정 및 성능 해석)

  • Lee, Daeheung;Jeong, Jongryeol;Park, Yeongil;Cha, Suk Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.2
    • /
    • pp.136-145
    • /
    • 2013
  • It is very important to determine specifications of components included in the drive-train of vehicles at the initial design stage. In this study, component sizing process and performance analysis for Extended-Range Electric Vehicles (E-REV) are discussed based on the foundation of determined system configuration and performance target. This process shows sizing results of an electric driving motor, a final drive gear ratio and a battery capacity for target performance including All Electric Range (AER) limit. For E-REV driving mode, the constant output power of a Gen-set (Engine+Generator) is analyzed in order to sustain State of Charge (SOC) of the battery system.

Setup of standard PD calibrator and its uncertainties

  • Kim, Kwang-Hwa;Yi, Sang-Hwa;Lee, Heun-Jin;Kang, Dong-Sik
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.677-683
    • /
    • 2011
  • The present paper describes the setup of standard partial discharge calibrator for measuring partial discharge and estimating uncertainties. The standard PD calibrator was designed and set up, consisting of a digital pulse generator, capacitor modules, and a digital oscilloscope controlled by software developed in the laboratory. Using this software, averages of charges and rising times and their standard deviations in the measured pulses can also be calculated. The standard PD calibrator generates five types of pulses: single, double, random, oscillating, and long-rising. The coefficient sensitivities to estimate the uncertainties of pulses were extracted in the model circuit of the standard PD calibrator. The uncertainties of charges and rising times in pulses of the standard PD calibrator were estimated with single pulses. These values were 0.3%-1.4% in charges and 1.9%-7.0% in rising time; however, these values are lower than the limit values in IEC 60270.

Performance Evaluation of SHF Sensor for Partial Discharge Signal Detection on DC Rectifier (DC 정류기 부분방전 신호검출을 위한 SHF 센서의 성능평가)

  • Jung, Ho-Sung;Park, Young;Na, Hee-Seung;Jang, Soon-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.7
    • /
    • pp.1056-1060
    • /
    • 2012
  • Online monitoring system is becoming an essential element of railway traction system for utilized to condition based malignance management and various techniques currently employed in railway traction system. Among the various techniques, it is efficient to detect partial discharge signals by electromagnetic wave detection in order to detect insulation fault of rectifier. Although VHF (Very High Frequency), UHF (Ultra High Frequency) sensors were adopted to detect partial discharge of power facilities, due to characteristics of urban railway, excessive noise occurs from 500 MHz to 1.5 GHz on UHF bandwidth. In this paper a new measurement system able to monitoring the conditions of power facilities on DC substation in metro was studied and set up. The system uses UHF sensors to measure the partial discharge of the rectifier due to electric faulting and dielectric breakdown. Comparison and estimation for performance of SHF sensor which had devised to detect partial discharge signal of urban railway rectifier has conducted. In order to estimate performance of SHF sensor, we have compared the sensor with existing UHF sensor on sensitivity upon frequency bandwidth generated by pulse generator, and also we have verified performance of the SHF sensor by detection results of partial discharge signal from urban railway rectifier.

Kinetic Study on the Low-lying Excited States of Ga Atoms in Ar

  • Kuntack Lee;Ju Seon Goo;Ja Kang Ku
    • Bulletin of the Korean Chemical Society
    • /
    • v.15 no.8
    • /
    • pp.663-669
    • /
    • 1994
  • Decay kinetics of Ga(5s), Ga(5p) and Ga(4d) atoms in Ar were studied by laser induced fluorescence technique. Theground state gallium atoms in the gas phase were generated by pulsed dc discharge of trimethyl gallium and argon mixtures. Both pulsed discharge and YAG-DYE laser system were controlled by a dual channel pulse generator and the delay time between the end of discharge and laser pulses was set 3.0-6.0 ms. The Ga(5s) and Ga(4d) atoms were generated by single photon excitation from the ground state Ga atoms and radiative lifetimes as well as the total quenching rate constants in Ar were obtained from the pressure dependence of the fluorescence decay rates. The Ga(5p) atoms were populated by a two-photon excitation method and the cascade fluorescence from Ga(5s) atoms were analyzed to extract quenching rate constant of Ga(5p) atoms by Ar in addition to radiative lifetimes of Ga(5p) state. The magnitudes of the quenching rate constants by Ar for the low-lying excited states of Ga atoms are 1.6-3$ {\times}10^{-11}cm^3$ molecul$e^{-1}s^{-1}$, which are much larger than those for alkali, alkaline earth and Group 12 metals. Based on the measured rate constants, kinetic simulations were done to assign state-to-state rate constants.

Design of Speed Controller for Stall Blade Wind Turbine Complying with the Speed Limit During Speed Overshoot (속도 오버슈트 발생 시 제한 속도를 초과하지 않는 실속형 블레이드 풍력터빈의 속도제어기 설계)

  • Kim, Ye-Chan;Song, Seung-Ho
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.438-445
    • /
    • 2022
  • Blade efficiency decreases when the rotor speed is kept constant even though the wind speed is higher than the rated value. Therefore, a speed controller is used to regulate the rotor speed in the high-wind-speed region. In stall-blade wind turbine, the role of the speed controller is important because precise aerodynamic regulation is unavailable. In this study, an effective parameter design method of a PI speed controller is proposed to limit the speed overshoot of a type 4 wind turbine with stall blades even though wind gust occurs. The proposed method considers the efficiency characteristics of the stall blade and the mechanical inertia of the wind turbine rotor. It determines the bandwidth of the speed controller to comply with the speed limit during generator speed overshoot for the worst case of wind gust. The proposed method is verified through intensive simulations with a MATLAB/SIMULINK model and experimental results obtained using a 3 kW MG set of wind turbine simulator.

Improved Cycle GAN Performance By Considering Semantic Loss (의미적 손실 함수를 통한 Cycle GAN 성능 개선)

  • Tae-Young Jeong;Hyun-Sik Lee;Ye-Rim Eom;Kyung-Su Park;Yu-Rim Shin;Jae-Hyun Moon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2023.11a
    • /
    • pp.908-909
    • /
    • 2023
  • Recently, several generative models have emerged and are being used in various industries. Among them, Cycle GAN is still used in various fields such as style transfer, medical care and autonomous driving. In this paper, we propose two methods to improve the performance of these Cycle GAN model. The ReLU activation function previously used in the generator was changed to Leaky ReLU. And a new loss function is proposed that considers the semantic level rather than focusing only on the pixel level through the VGG feature extractor. The proposed model showed quality improvement on the test set in the art domain, and it can be expected to be applied to other domains in the future to improve performance.

A Study on Setting SPS for Generator Tripping Action considering Operating Conditions of Power Systems (전력계통 운영조건을 고려한 발전기차단용 SPS 동작설정에 관한 연구)

  • Gwon, Han Na;Son, Hyeok Jin;Kook, Kyung Soo;Yang, Sung-Chae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.1
    • /
    • pp.411-417
    • /
    • 2014
  • Special Protection Scheme(SPS) for generator tripping action is an emergency control tool that secures the power system stability by instantly tripping the pre-determined number of generators to avoid the acceleration of the remaining generators in a large-scaled power plants when a fault occurs on the drawing transmission lines. However, since the existing operating conditions of SPS are set based on a peak demand, SPS could trip more generators than required if it is activated during the off-peak demand period. For this, this paper proposes the algorithm for setting the operating conditions of SPS through the online stability evaluation with the periodically updated operating conditions of power systems. The proposed algorithm adopts COA for the accuracy and speed of the stability evaluation, and can reduce the number of tripping generators by SPS during the off-peak demand period. This results in reducing the loss of profit caused by a fault on power systems.

Radiated Emission of Electrical Fast Transient/Burst Signal and Its Countermeasures (전기적으로 빠른 과도현상/버스트 신호의 복사방출과 대책)

  • Park, Soo Hoon;Kim, Dong Il;Park, Youn Joon;Nah, Seung Wook
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.27 no.3
    • /
    • pp.291-298
    • /
    • 2016
  • In this paper, we studied about the radiated emission of EFT(Electrical Fast Transient)/Burst signal, referenced IEC-61000-4-4 of the international EMC standard and its effect on EUT(Equipment Under the Test) when EFT/Burst signal (Conducted noise) induced on a power cable to EUT. Firstly, we set up test sample by the standard and +4 kV standard signal is induced by EFT/Burst signal generator with 1 m length power cable for 1 minute. Consequently, we found not only induced EFT/Burst signal along power line, but also directly radiated emission signal from EFT/Burst signal generator (Radiated emission noise of EFT/Burst). The radiated emission signal of EFT/Burst was 30 dB which is higher than limit of CISPR 22 which is international EMC standard. Moreover, we measured the electric field strength by changing distance from maximum radiated emission point to electric field strength tester. As a result, this electric field strength was 23 V/m which is higher than international EMC standard test level(CISPR 24). Therefore, it was confirmed that the probability of malfunction may be high when radiated emission of EFT/Burst noise exists near the EUT.

ETS Sampler design for borehole radar receiver using 4 different clock phases (위상이 다른 4개의 클럭을 이용한 시추공 레이다 수신기용 ETS 샘플러 설계)

  • Yoo, Young-jae;Oh, Chaegon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.680-687
    • /
    • 2018
  • Borehole radar is a radar used for underground resources and geological exploration purposes. It needs a high-speed sampler to transmit electromagnetic waves with a pulse width of several ns and to receive reflected waves of several tens to several hundreds of MHz reflected from the object to be surveyed. ETS (Equivalent-Time Sampling), which can achieve sampling performance of several GHz with a sampling frequency of several tens of MHz, is suitable for use as a sampler of a borehole radar receiver. In this paper, we propose a method to control the sampling clock delay, which is the most important factor in ETS sampler design, using four clocks with phase difference of $90^{\circ}$ for one clock source. The proposed method can reduce the time required to acquire the data within the set interval by 1/25 than the conventional method using the delay generator. When the implemented sampler is applied to the receiver of existing borehole radar, it is possible to accumulate 58 additional times due to the shortened sampling time. In addition, by using one delay control logic compared with the conventional method using several sampling clock delay control logic in order to satisfy the target sampling range, it is possible to omit the correction process which was necessary in the past. As a result, the structure of the system can be simplified and a uniform sampler can be realized.