• Title/Summary/Keyword: Generator Scheduling

Search Result 82, Processing Time 0.034 seconds

An Instrument Fault Diagnosis Scheme for Direct Torque Controlled Induction Motor Driven Servo Systems (직접토크제어 유도전동기 구동 서보시스템을 위한 장치고장 진단 기법)

  • Lee, Kee-Sang;Ryu , Ji-Su
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.6
    • /
    • pp.241-251
    • /
    • 2002
  • The effect of sensor faults in direct torque control(DTC) based induction motor drives is analyzed and a new Instrument fault detection isolation scheme(IFDIS) is proposed. The proposed IFDIS, which operated in real-time, detects and isolates the incipient fault(s) of speed sensor and current sensors that provide the feedback information. The scheme consists of an adaptive gain scheduling observer as a residual generator and a special sequential test logic unit. The observer provides not only the estimate of stator flux, a key variable in DTC system, but also the estimates of stator current and rotor speed that are useful for fault detection. With the test logic, the IFDIS has the functionality of fault isolation that only multiple estimator based IFDIS schemes can have. Simulation results for various type of sensor faults show the detection and isolation performance of the IFDIS and the applicability of this scheme to fault tolerant control system design.

Performance Enhancement of Parallel Prime Sieving with Hybrid Programming and Pipeline Scheduling (혼합형 병렬처리 및 파이프라이닝을 활용한 소수 연산 알고리즘)

  • Ryu, Seung-yo;Kim, Dongseung
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.4 no.10
    • /
    • pp.337-342
    • /
    • 2015
  • We develop a new parallelization method for Sieve of Eratosthenes algorithm, which enhances both computation speed and energy efficiency. A pipeline scheduling is included for better load balancing after proper workload partitioning. They run on multicore CPUs with hybrid parallel programming model which uses both message passing and multithreading computation. Experimental results performed on both small scale clusters and a PC with a mobile processor show significant improvement in execution time and energy consumptions.

An Improved Dynamic Programming Approach to Economic Power Dispatch with Generator Constraints and Transmission Losses

  • Balamurugan, R.;Subramanian, S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.3
    • /
    • pp.320-330
    • /
    • 2008
  • This paper presents an improved dynamic programming (IDP) approach to solve the economic power dispatch problem including transmission losses in power systems. A detailed mathematical derivation of recursive dynamic programming approach for the economic power dispatch problem with transmission losses is presented. The transmission losses are augmented with the objective function using price factor. The generalized expression for optimal scheduling of thermal generating units derived in this article can be implemented for the solution of the economic power dispatch problem of a large-scale system. Six-unit, fifteen-unit, and forty-unit sample systems with non-linear characteristics of the generator, such as ramp-rate limits and prohibited operating zones are considered to illustrate the effectiveness of the proposed method. The proposed method results have been compared with the results of genetic algorithm and particle swarm optimization methods reported in the literature. Test results show that the proposed IDP approach can obtain a higher quality solution with better performance.

A study on generator maintenance scheduling in competitive electricity markets (경쟁적 전력시장에서 발전기 예방정비계획 알고리즘에 관한 연구)

  • Han, Seok-Man;Shin, Young-Kyun;Kim, Bal-Ho H.;Park, Jong-Bae;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.643-645
    • /
    • 2003
  • In competitive electricity markets, each GenCo establishes generator maintenance schedule and submits to ISO those. Then, ISO reviews and arranges maintenance schedule of each GenCo to meet the standard for reliability. This paper presents the new optimization model which can apply to competitive electricity markets. The object of this model is to minimize schedules variation of each GenCo and to satisfy system reliability.

  • PDF

A maximal-Flow Scheduling Using time Expanded Network in a track (시간 전개형 네트워크를 이용한 선로의 최대흐름 스케쥴링)

  • 이달상;김만식
    • Journal of Korean Society of Transportation
    • /
    • v.8 no.2
    • /
    • pp.67-75
    • /
    • 1990
  • This paper treats the problem to schedule for trains with how transit priority so as to maximizing the number that can be sent during given time periods without interfering with the fixed schedule for train with high transit priority in a track. We transform the this problem into Time Expanded Network without traverse time through application of Ford and Fulkerson Model and construct the Enumeration Algorithm for solutions using TENET Generator (TENETGEN). Finally, we compare our algorithm with Dinic's Maximal-Flow Algorithm and examine the avaliability of our procedures in personal computer.

  • PDF

Efficient Maximal Flow Algorithms in a Large Time-Expanded Network (대규모 시간전개형 네트워크에서의 효율적 최대유량 해법)

  • 이달상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.37
    • /
    • pp.211-220
    • /
    • 1996
  • We consider the problem of scheduling a maximal amount of additional, low priority transport through a large multiperiod network, given that we may not interfere with an existing schedule for high priority transport. The problem is transformed into the Time-Expanded network(TENET) without traverse time using TENET Generator (TENETGEN). We describe two specialized heuristic algorithms that guarantee the optimal solutions and show the effectiveness of them by comparing quite favorably with Dinic.

  • PDF

Generator Scheduling considering Demand Response and Reliability Indices (수요 반응과 신뢰도 지수에 따른 발전 스케쥴링)

  • Kwag, Gun-Hyung;Bae, In-Su;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.556-557
    • /
    • 2008
  • 전력 산업이 경쟁 체제로 변화되면서 고객들의 전기 가격체계가 현물 가격으로 변환되고 있다. 이러한 가격 쳬게에서 전기 가격은 수요와 반응하게 되고 이러한 상호작용을 수요 반응이라 한다. 본 논문에서는 가격의 변화에 따른 수요의 다양한 변화를 가격 민감도, 신뢰도 민감도를 정의하여 설명한다. 이것은 고객의 입장에서는 더 경쟁적인 체계이고 운영자의 입장에서는 더 효율적이고 효과적인 체계이다.

  • PDF

The solar power with weather and generator scheduling (날씨에 따른 테양광 발전의 발전량과 전력시스템의 발전 스케줄링)

  • Kim, Doo-Hyun;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.500-501
    • /
    • 2008
  • 최근 지구 온난화 가스 배출문제에 관련하여 신재생에너지에 대한 관심이 급증하고 있다. 여러가지 신재생에너지 중의 하나인 태양광 발전은 유력한 에너지 문제의 대안으로 떠오르고 있다. 하지만 이러한 태양광발전의 가장 큰 약점은 날씨에 따라 발전량이 결정된다는 것이다. 따라서 본 논문에서는 태양광 발전의 발전량과 부하량의 각 케이스별로 전력시스템의 발전 스케줄링을 해보려 한다.

  • PDF

Various Objective Functions Based Optimal GMS (목적함수별 발전기 최적보수계획)

  • Lee, Yeonchan;Phuong, Do Nguyen Duy;Oh, Ungjin;Lim, Jinteak;Choi, Jaeseok
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.471-472
    • /
    • 2015
  • This paper proposes a generator maintenance scheduling (GMS) problem with due consideration of various objective functions. The objectives include leveling the reserve rate, maximizing reliability and minimizing production cost. The practicality and effectiveness of the proposed approach are demonstrated in the simulation for a real-size power system model in South Korea.

  • PDF

Study on the Calculation of the Optimal Power Operation Considering Line Contingencies (상정사고를 고려한 전력계통 최적운용에 관한 연구)

  • 박영문;백영식
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.33 no.6
    • /
    • pp.241-246
    • /
    • 1984
  • The power system scheduling process is formulated as an optimization problem with linear inequality constraints. AC Loadflow method is used for the problem solution and line losses are considered. The constraints under consiceration are generator power limits, load schedding limits and line capacity limits. In solving the objective function the Dual Relaxation method is adopted. Tests indicate that the method is practical for real time applications.

  • PDF