• Title/Summary/Keyword: Generation Cost

Search Result 2,090, Processing Time 0.027 seconds

Optimum Life Cycle Cost Design of Steel Box Girder Bridges (강상형교의 최적 Life Cycle Cost 설계)

  • 조효남;민대홍;김구선
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.151-158
    • /
    • 1998
  • This paper presents an optimal decision model for minimizing the life-cycle cost of steel box girder bridges. The point is that it takes into account service life process as a whole, and the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs and expected failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. The optimal solution identifies those values of the decision variables that result in minimum expected total cost. The performance constraints in the form of flexural failure and shear failure are those specified in the design code. Based on extensive numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on life-cycle cost approach proposed in this study provides a lot more rational and economical design, and thus the proposed approach will propose the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

MODELLING AFRICAN TRYPANOSOMIASIS IN HUMAN WITH OPTIMAL CONTROL AND COST-EFFECTIVENESS ANALYSIS

  • GERVAS, HAMENYIMANA EMANUEL;HUGO, ALFRED K.
    • Journal of applied mathematics & informatics
    • /
    • v.39 no.5_6
    • /
    • pp.895-918
    • /
    • 2021
  • Human African Trypanosomiasis (HAT) also known as sleeping sickness, is a neglected tropical vector borne disease caused by trypanosome protozoa transmitted by bites of infected tsetse fly. The basic reproduction number, R0 derived using the next generation matrix method which shows that the disease persists in the population if the value of R0 > 1. The numerical simulations of optimal control model carried out to determine the control strategy that can combat HAT under the minimum cost. The results indicate that, the use of both education campaign, treatment and insecticides are more efficient and effective to eliminate HAT in African community but too costly. Furthermore, the cost-effectiveness of the control measures (education campaign, treatment and insecticides) were determined using incremental cost-effectiveness ratio (ICER) approach and the results show that, the use of education and treatment of infected people as the best cost effective strategy compared to other strategies.

A Development of GPS SIS Anomalies Generation Software

  • Han, Younghoon;Ko, Jaeyoung;Shin, Mi Young;Cho, Deuk Jae
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.2 no.1
    • /
    • pp.33-40
    • /
    • 2013
  • In this paper, GPS signal anomaly generation software is proposed which can be used for the analysis of GPS signal anomaly effect and the design, verification, and operation test of anomalous signal monitoring technique. For the implementation of anomalous signal generation technique, anomalous signals are generated using a commercial signal generation simulator, and their effects and characteristics are analyzed. An error model equation is proposed from the result of analysis, and the anomalous signal generation software is constructed based on this equation. The proposed anomalous signal generation software has high scalability so that users can easily utilize and apply, and is economical as the additional cost for purchasing equipment is not necessary. Also, it is capable of anomalous signal generation based on real-time signal by comparing with the commercial signal generation simulator.

Economic evaluation on heating systems of apartment complex (공동주택단지 난방시스템들에 대한 경제성 평가)

  • 조금남;윤승호;김원배
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.10 no.6
    • /
    • pp.773-783
    • /
    • 1998
  • The heating system for apartment complex may be classified as old systems including central system with steam boiler(S1), gas engine driven heat pump system(S2), system using waste heat(S3) and new systems including mechanical vapor re-compression system with flashing heat exchangers(S4), system using methanol(S5), system using metal hydride (S6). The purpose of the present study is to suggest optimal heating system by technically, economically and environmentally evaluating old and new heating systems of apartment complex from 500 to 3,000 households. Economic evaluation based on the technical evaluation results which estimated heat transfer area of heat exchangers and capacity of equipments was estimated initial investment cost, annual operating cost and relative payback period by considering annual increasing rates of energy cost and interest. Environmental evaluation provided annual generation rate of carbon dioxide. Initial investment cost was cheap in the order of S6, S5, S3, S2, S4, S1, annual operating cost was cheap in the order of S1, S2, S4, S5 and relative payback period was short in the order of S6, S5, S2, S3 and S4. Relative payback period was within 8 years for all scenarios of 3,000 households, and was increased as annual increasing rates of energy cost and interest were increased. As transportation pipe length was increased twice, payback period was increased by 1.4~2.6 time. The effect of temperatures of waste gas and waste water on the relative payback period was small within 0.8 years. The annual generation rate of carbon dioxide was big in the order of S4, S2 and S1. S4 was the most economic system among whole scenarios when S1 was replaced with other scenarios.

  • PDF

Application of Newton's Approach for Transient Stability Improvement by Using Generation Rescheduling (발전력 재배분을 이용하여 과도안정도를 향상하기 위한 Newton's Approach 응용)

  • Kim, Kyu-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.1
    • /
    • pp.68-75
    • /
    • 2013
  • This paper presents a scheme to improve transient stability using Newton's Approach for generation rescheduling. For a given contingency, the energy margin and sensitivities are computed. The bigger energy margin sensitivity of generator is, the more the generation of the generator effects to the transient stability. According to energy margin sensitivity, the control variables of generation rescheduling are selected. The fuel cost function is used as objective function to reallocate power generation. The results are compared to the results of time simulation to show its the effectiveness.

Photovoltaic Generation System Simulation using Real Field Weather Conditions

  • Park, Min-Won;Yu, In-Keun
    • Journal of IKEEE
    • /
    • v.5 no.2 s.9
    • /
    • pp.121-127
    • /
    • 2001
  • Actual system apparatuses are necessary in order to verify the efficiency and stability of photovoltaic(PV) generation systems considering the size of solar panel, the sort of converter type, and the load conditions and so on. Moreover, it is hardly possible to compare a certain MPPT control scheme with others under the exactly same weather and load conditions as well. For the purpose of solving above mentioned difficulties in a laboratory basis, a transient simulation of PV generation system using real field weather conditions is indispensable. A straightforward simulation scheme with cost effective hardware structures under real weather conditions is proposed in this paper using EMTDC type of transient analysis simulators. Firstly, a solar cell has been modeled with VI characteristic equations, and then the real field data of weather conditions are interfaced to the EMTDC through Fortran program interface method. As a result, the stability and the efficiency analysis of PV generation systems according to various hardware structures and MPPT controls are easily possible under the exactly same weather conditions.

  • PDF

A method Based on Boundary Deformation for Planar Grid Generation

  • Liu, Xinru;Liu, Duanfeng;Han, Xuli
    • International Journal of CAD/CAM
    • /
    • v.8 no.1
    • /
    • pp.63-67
    • /
    • 2009
  • This paper puts forward a method based on the boundary deformation for planar grid generation. Many methods start with the special properties of grid and switch to the solution of a direct optimization or a non-linear minimum cost flow. Though with high theoretical significance, it's hard to realize due to the extremely complicated computing process. This paper brings out the automatic generation of planar grid by studying the boundary deformational properties of planar grid, which leads to uniform grid and enjoys the simplicity of computation and realization.

An Explicit Column Generation Algorithm for the Profit Based Unit Commitment Problem in Electric Power Industry (전력산업에서의 Profit-Based Unit Commitment Problem 최적화를 위한 명시적 열생성 알고리즘)

  • Lee, Kyung-Sik;Song, Sang-Hwa
    • IE interfaces
    • /
    • v.20 no.2
    • /
    • pp.186-194
    • /
    • 2007
  • Recent deregulation of Korean electricity industry has made each power generation company pay more attention to maximizing its own profit instead of minimizing the overall system operation cost while guaranteeing system security. Electricity power generation problem is typically defined as the problem of determining both the on and off status and the power generation level of each generator under the given fuel constraints, which has been known as Profit-Based Unit Commitment (PBUC) problem. To solve the PBUC problem, the previous research mostly focused on devising Lagrangian Relaxation (LR) based heuristic algorithms due to the complexity of the problem and the nonlinearity of constraints and objectives. However, these heuristic approaches have been reported as less practical in real world applications since the computational run time is usually quite high and it may take a while to implement the devised heuristic algorithms as software applications. Especially when considering long-term planning problem which spans at least one year, the complexity becomes higher. Therefore, this paper proposes an explicit column generation algorithm using power generation patterns and the proposed algorithm is successfully applied to a Korean power generation company. The proposed scheme has a robust structure so that it is expected to extend general PBUC problems.

Study on Energy Independence Plan for Sewage Treatment Plant (하수처리시설의 에너지 자립화 방안 연구)

  • Kim, Young-Jun;Lee, Jong-Yeon;Kang, Yong-Tae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.1
    • /
    • pp.49-55
    • /
    • 2010
  • The objectives of this study are to analyze the energy independence plan and to propose a suitable sewage treatment plant in Korea. The total amount of electricity consumption for public sewage treatment plant was estimated as 1,812 GWh in 2007. It was estimated that total 16 sewage treatment plants with renewable energy systems produced electricity of 15 GWh per year, which could replace 0.8% of total electricity used for sewage treatment. It was found that domestic sewage treatment plants with power generation plants by digestion gas were installed in 7 places and produced electricity of 13 GWh per year. It was also found that the power generation plants by digestion gas were the most cost-effective for sewage treatment plant out of the renewable energy systems based on the benefit-cost analysis.