• Title/Summary/Keyword: Gantry Crane

Search Result 97, Processing Time 0.024 seconds

A Study on Determination of Optimal Prevention Maintenance Interval for Gantry Crane in Container Terminal (선박작업 생산성 향상을 위한 갠트리 크레인의 고장분석 및 예방보전 주기 결정에 관한 연구)

  • Kim Hwan-Seong;Kim Young-Ho;Tran Ngoc Hoang Son
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.339-344
    • /
    • 2006
  • The productivity for container hand1ing in container ship is a important role in container terminal, and it is mainly depended on the productivity of gantry crane. From the failure of gantry crane, the crane will be stopped until the repair of the failure. During the repair, the loading and/or discharging for container ship is suspended, and the productivities of the container ship and the yard is just hold. Thus, the prevention maintenance is importance to make a keep the steady state condition for all equipments in container terminal. In this paper, we deal with a optimal determination method of prevention maintenance interval for gantry crane systems. For verification, we will make a productivity of gantry crane and adapt to total container handling in each ship by simulation.

  • PDF

Decentralized Control with Input Compensation Form for Gantry Crane Systems (갠트리 크레인의 입력 보상형 분산제어)

  • Kim, Hwan-Seong;Kim, Myeong-Gyu;Yu, Sam-Seong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.4
    • /
    • pp.281-287
    • /
    • 2001
  • In this paper, we deal with a decentralized control scheme with input compensation form for gantry crane systems. By considering the gantry cranes characteristics, the system is decentralized into two subsystems, the travelling and swaying subsystem and the hoisting subsystem. For decentralizing the system, a simple algorithm is proposed using the observability canonical form. The decentralized subsystems include unknown inputs that one coupled with other subsystems and actuator failures. These unknown input and actuator failures are estimated by using PI observation techniques. And those estimated values are used to construct an input compensation form. Finally, the proposed decentralized control scheme for the gantry crane systems is verified by crane simulation.

  • PDF

A Study on 3-D Dynamic Characteristic of Gantry Crane (갠트리 크레인의 3차원 동특성에 관한 연구)

  • 이성섭;이형우;박찬훈;박경택;이만형
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.153-158
    • /
    • 2000
  • The sway motion of the spreader during and after movement causes an efficiency problem of position control in unmaned gantry crane. The objective of this research is to investigate the phenomenon that the load is taken by the sway motion of crane. For deriving the dynamic equations related to the swing motion of crane, we introduced a conception of spring and damper in the upper part of the crane. During the crane and trolley is driving along the velocity profile, the swing motion of the spreader and crane will be simulated. The simulation result of the equation of motion using the Runge-Kutta method is presented in this paper. And we will show an effect of the swing of the crane in this research.

  • PDF

The Study of 3-Dimension Dynamic Characteristics of Gantry Crane (갠트리 크레인의 3차원 동특성에 관한 연구)

  • 이성섭;이형우;박찬훈;박경택;이만형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.708-712
    • /
    • 2000
  • The sway motion of the spreader during and after movement causes an efficiency problem of position control in unmaned gantry crane. The objective of this research is to investigate the phenomenon that the load is taken by the sway motion of crane. For deriving the dynamic equations related to the swing motion of crane, we introduced a conception of spring and damper in the upper part of the crane. During the crane and trolley is driving along the velocity profile, the swing motion of the spreader and crane will be simulated. The simulation result of the equation of motion using the Rung-Kutta method is presented in this paper. And we will show an effect of the swing of the crane in this research.

  • PDF

Optimal Block Lifting Scheduling Considering the Minimization of Travel Distance at an Idle State and Wire Replacement of a Goliath Crane (골리앗 크레인의 공주행 거리와 와이어 교체 최소를 고려한 최적 블록 리프팅 계획)

  • Roh, Myung-Il;Lee, Kyu-Yeul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.1
    • /
    • pp.1-10
    • /
    • 2010
  • Recently, a shipyard is making every effort to efficiently manage equipments of resources such as a gantry crane, transporter, and so on. So far block lifting scheduling of a gantry crane has been manually performed by a manager of the shipyard, and thus it took much time to get scheduling results and moreover the quality of them was not optimal. To improve this, a block lifting scheduling system of the gantry crane using optimization techniques was developed in this study. First, a block lifting scheduling problem was mathematically formulated as a multi-objective optimization problem, considering the minimization of travel distance at an idle state and wire replacement during block lifting. Then, to solve the problem, a meta-heuristic optimization algorithm based on the genetic algorithm was proposed. To evaluate the efficiency and applicability of the developed system, it was applied to an actual block lifting scheduling problem of the shipyard. The result shows that blocks can be efficiently lifted by the gantry crane using the developed system, compared to manual scheduling by a manager.

Parameters Identification of Gantry Crane By Using ANSYS

  • Kim, Hwan-Seong;Nguyen, Tuong-Long
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.62.5-62
    • /
    • 2002
  • The main purpose of this paper is to identify the important parameters and to examine their relations to one another while gantry crane structure was modeled. The important elements of the structural analysis are included, such as the stiffness matrix and its relations to the degrees of freedom, the displacement, and frequency responses. To investigate these relations, the parametric modeling of a dynamic system is solved by using the finite element method (ANSYS-Program). Furthermore, EXPRESS schema and C-FAR (change favorable representation) are described how to change the frame length of gantry crane which influences other elements. Since this relationship is established, the results may...

  • PDF

The Effect of Machinery House Location on the Stability of High Efficiency Gantry Crane (기계실 위치 변화가 고효율 갠트리 크레인의 안정성에 미치는 영향 분석)

  • Lee S.W.;Han G.J.;Shim J.J.;Han D.S.;Gwon S.G.;Kim T.H.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1605-1608
    • /
    • 2005
  • This study was carried out to analyze the effect of machinery house location on the stability of high efficiency gantry crane which can improve the productivity of the container transportation wok by reducing cycle time. The wind load was evaluated according to 'Load Criteria of Building Structures' enacted by the ministry of construction & transportation. The uplift forces of high efficiency gantry crane under this wind load were calculated by analyzing reaction forces at each supporting point. And variation of reaction forces at each supporting point was analyzed according to machinery house location.

  • PDF

A Study on the Anti-sway System of the UGC (UGC의 복합식 Anti-sway에 관한 연구)

  • 김두형;신영재;박경택;박찬훈;김태우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.281-291
    • /
    • 1999
  • Productivity of container cranes and gantry cranes is influenced by the performance of crane hardware and cycle time. Cycle time in container handling is influenced by the path of containers and relative positioning of containers. So we have to minimize the sway of containers and spreaders to minimize relative positioning time. And sway minimization is influenced by the skill of workers in manual gantry cranes. In this paper, we will develop anti-sway system using mechanical and electrical method. Proposed hybrid system uses the basic structure of general manual gantry crane. So, it is very useful and effective. Electrical methods are main methods and mechanical methods are auxiliary methods.

  • PDF

Multi-flexible Dynamic Modeling and Wheel Load Analysis of a Rubber Tired Gantry Crane in Container Cargo Working (컨테이너 하역작업 시 갠트리 크레인의 유연다물체 동역학 모델링 및 윤하중 해석)

  • Kim, Jungyun;Kim, Jingon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.5
    • /
    • pp.379-384
    • /
    • 2014
  • This article describes the dynamic behaviors of a rubber tired gantry crane(RTGC) under typical load conditions which are used in the design of gantry cranes. In order to investigate the dynamic characteristics of an RTGC, we developed a finite element crane model for its huge structure. The finite element model was validated with the modal test results, e.g., natural frequencies and normal modes. And other components of RTGC were converted into detailed 3D CAD models and finally transformed to rigid body models in a dynamic simulation program ADAMS. The load conditions considered in this paper were a normal operating condition(OP1) and container hanging condition with no external loads. As a result, we could find there was large influence of crane's vibration owing to its structural stiffness and deformation. And the vibration of crane could made the movements of RTGC, which occurs crash or malfunction of crane works.

Position Control of Motor for Yard Crane Drive Using Lonworks network (LonWorks네트워크를 이용한 야드 크레인 구동용 전동기 위치제어)

  • 전태원;최명규;김동식;김홍근;노희철
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.1
    • /
    • pp.37-44
    • /
    • 2001
  • This paper describes the position control method in yard crane drive system using Lonworks network, which is a leading industrial control network. The network is composed of host computer and three motor drive systems for both gantry and trolley position controls of both gantry and trolley are controlled with the simulator of yard crane, the size of which is about 1/10 with the real yard crane.

  • PDF