• Title/Summary/Keyword: GNSS Surveying

Search Result 140, Processing Time 0.025 seconds

Accuracy Analysis of GPS Ellipsoidal Height Determination in Accordance with the Surveying Conditions (관측조건에 따른 GPS 타원체고 결정의 정확도 분석)

  • Lee, Suk Bae;Auh, Su Chang
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.23 no.4
    • /
    • pp.67-74
    • /
    • 2015
  • GNSS/Leveling technology makes it possible to get geoidal height geometrically using GNSS and Leveling technology. GNSS/Geoid technology refers to a technology for obtaining orthometric height by subtracting geoidal height achieved by Geoid technology from ellipsoidal height achieved by GNSS technology. The purpose of this study is to verify the accuracy of the ellipsoidal height determination in order to verify the accuracy of the orthometric height determination by the GNSS/Geoid technology. For the study, a test bed was selected in Kyungnam province and GNSS Static surveying was accomplished in the test bed and then the GNSS data was processed in accordance with various analysis conditions. So, it was verified the accuracy of the ellipsoidal heights determination in accordance with the surveying conditions under the GNSS Static surveying. According to the research results, to ensure the 3cm goal accuracy of the ellipsoidal height determination, it should be surveyed by four fixed points on the survey area periphery and more than two hours of the GNSS occupation time, And also, it was found that should be limited to a baseline distance of 20km under the GNSS Static surveying.

Design of the Realtime GNSS Surveying Software for Advancement of Geospatial Information Construction Technology

  • Park, Joon Kyu;Jung, Kap Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.34 no.4
    • /
    • pp.425-430
    • /
    • 2016
  • Currently, start of the operation US GPS, the Russian Glonass, European Galileo, the Chinese Compass satellites for positioning are celebrating a true GNSS (Global Navigation Satellite System) generation. Korea is building advanced infrastructure such as a national network consisting of CORS (Continuously Operating Reference Station), VRS service for real-time precise positioning and perform continuous upgrading. However, the acquisition of geospatial information using the national infrastructure requires many steps and high dependence on foreign software part in this process. This study contributes to advanced construction technology of geospatial information by design of realtime GNSS surveying system. As a results, it has designed the surveying software that can effectively positioning realtime. Designed realtime surveying software can utilized in various fields.

Accuracy Analysis of Orthometric Heights Based on GNSS Static Surveying (GNSS 정지측량을 통한 표고 산출 정확도 분석)

  • Shin, Gwang-Soo;Han, Joong-Hee;Kwon, Jay Hyoun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.5
    • /
    • pp.527-537
    • /
    • 2014
  • In 2013, NGII(National Geographic Information Institute) has developed and provided the KNGeoid13(Korean National Geoid Model 2013) to support the fundamental computation of GNSS-derived orthometric height. In this study, the adjusted ellipsoidal height, the sum of geoidal height and height by the leveling, is applied to calculate the GNSS-derived orthometric height without the local bias, based on GNSS static surveying and KNGeoid13. The mean of errors in GNSS-derived orthometric heights could be verified with the leveling data, which was actually less than 0.5 cm with using the adjusted ellipsoidal heights, but 3 cm by calculating differences between ellipsoidal heights and geoidal heights. By analyze the accuracy of GNSS-derived orthometric height depending on the duration of observation, we could realized 95% of data shows less than 4 cm accuracy, when the GNSS survey conducting for 4 hours spread over two days, but while the case of GNSS survey conducting for 4 hours and 2 hours respectively, resulted in 95% of data less than 5cm level of accuracy. Also, if the ambiguity is fixed, less than 10cm of accuracy could be obtained at 95% of data for only 30 minutes GNSS survey over a day. Following the study, we expected that the height determination by GNSS and geoid models can be used in the public benchmark surveying.

The Accuracy Analysis of VRS GNSS for Applying Cadastral Surveying (VRS GNSS의 지적측량에 적용을 위한 정확도 분석)

  • Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.94-100
    • /
    • 2013
  • This study is to analyze the accuracy of position determination in cadastral surveying using VRS GNSS(GPS/GLONASS), and is to suggest a possibility to improvement of accuracy in decision making of cadastral surveying result based on this result. As a result of this study, the position accurate of this study, which decides position combining with GPS/GLONASS satellite data is about 3cm more accurate than using only GPS satellite data. Therefore, if GNSS integrated receiving method is to be applied on cadastration, it can be expected to improve to estimate the position accuracy.

Accuracy Analysis of GNSS-derived Orthometric Height in Mountainous Areas

  • Lee, Jisun;Kwon, Jay Hyoun;Lee, Hungkyu;Park, Jong Soo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.5
    • /
    • pp.403-412
    • /
    • 2018
  • Recently, GNSS (Global Navigation Satellite System)-derived orthometric height determination has been studied to improve the time and cost-effectiveness of traditional leveling surveying. However, the accuracy of this new survey method was evaluated when unknown points are located lower than control points. In this study, the accuracy of GNSS-derived orthometric height was examined using TPs (Triangulation Points) to verify the stability of surveying in mountainous areas. The GNSS survey data were obtained from Mungyeong, Unbong/Hadong, Uljin, and Jangseong. Three unknown points were surrounded by more than three UCPs (Unified Control Points) or BMs (Benchmarks) following the guideline for applying GNSS-derived orthometric height determination. A newly developed national geoid model, KNGeoid17 (Korean National Geoid 2017), has been applied for determining the orthometric height. In comparison with the official orthometric heights of the TPs, the heights of the unknown points in Mungyeong and Unbong/Hadong differ by more than 20 cm. On the other hand, TPs in Uljin and Jangseong show 15-16 cm of local bias with respect to the official products. Since the precision of official orthometric heights of TPs is known to be about 10 cm, these errors exceed the limit of the precision. Therefore, the official products should be checked to offer more reliable results to surveyors. As an alternative method of verifying accuracy, three different GNSS post-processing software were applied, and the results from each software were compared. The results showed that the differences in the whole test areas did not exceed 5 cm. Therefore, it was concluded that the precision of the GNSS-derived orthometric height was less than 5 cm, even though the unknown points were higher than the control points.

A Study on Simultaneous Adjustment of GNSS Baseline Vectors and Terrestrial Measurements

  • Nguyen, Dinh Huy;Lee, Hungkyu;Yun, Seonghyeon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.5
    • /
    • pp.415-423
    • /
    • 2020
  • GNSS (Global Navigation Satellite System) is mostly used for high-precise surveys due to its accuracy and efficiency. But this technique does not always fulfill the demanding accuracy in harsh operational environments such as urban canyon and forest. One of the remedies for overcoming this barrier is to compose a heterogeneous surveying network by adopting terrestrial measurements (i.e., distances and angles). Hence, this study dealt with the adjustment of heterogeneous surveying networks consisted of GNSS baseline vectors, distances, horizontal and vertical angles with a view to enhancing their accuracy and so as to derive an appropriate scheme of the measurement combination. Reviewing some technical issues of the network adjustments, the simulation, and experimental studies have been carried out, showing that the inclusion of the terrestrial measurements in the GNSS standalone overall increased the accuracy of the adjusted coordinates. Especially, if the distances, the horizontal angles, or both of them were simultaneously adjusted with GNSS baselines, the accuracy of the GNSS horizontal component was improved. Comparing the inclusion of the horizontal angles with those of the distances, the former has been more influential on accuracy than the latter even though the same number of measurements were employed in the network. On the other hand, results of the GNSS network adjustment together with the vertical angles demonstrated the enhancement of the vertical accuracy. As conclusion, this paper proposes a simultaneous adjustment of GNSS baselines and the terrestrial measurements for an effective scheme that overcomes the limitation of GNSS control surveys.

Accuracy Analysis of GNSS-based Public Surveying and Proposal for Work Processes (GNSS관측 공공측량 정확도 분석 및 업무프로세스 제안)

  • Bae, Tae-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.457-467
    • /
    • 2018
  • Currently, the regulation and rules for public surveying and the UCPs (Unified Control Points) adapts those of the triangulated traverse surveying. In addition, such regulations do not take account of the unique characteristics of GNSS (Global Navigation Satellite System) surveying, thus there are difficulties in field work and data processing afterwards. A detailed procesure of GNSS processing has not yet been described either, and the verification of accuracy does not follow the generic standards. In order to propose an appropriate procedure for field surveys, we processed a short session (30 minutes) based on the scenarios similar to actual situations. The reference network in Seoul was used to process the same data span for 3 days. The temporal variation during the day was evaluated as well. We analyzed the accuracy of the estimated coordinates depending on the parameterization of tropospheric delay, which was compared with the 24-hr static processing results. Estimating the tropospheric delay is advantageous for the accuracy and stability of the coordinates, resulting in about 5 mm and 10 mm of RMSE (Root Mean Squared Error) for horizontal and vertical components, respectively. Based on the test results, we propose a procedure to estimate the daily solution and then combine them to estimate the final solution by applying the minimum constraints (no-net-translation condition). It is necessary to develop a web-based processing system using a high-end softwares. Additionally, it is also required to standardize the ID of the public control points and the UCPs for the automatic GNSS processing.

A Study on Accuracy Evaluation and Accuracy Improvement in Cadastral Re-survey Surveying Method (지적재조사 측량방법의 정확도 비교 및 정확도 향상방안 연구)

  • Lee, Suk Bae;Auh, Su Chang;Suh, Yong Woon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.39-46
    • /
    • 2014
  • Network RTK GNSS positioning technique which has been developed to overcome the limitation of Single reference station RTK is used widely in the field of general surveying, cadastre surveying and engineering surveying due to the high accuracy and efficiency. It is specified Network RTK, Single reference station RTK and Static of GNSS as a surveying method in the regulation of Cadastre Re-survey Surveying. In this study, Network RTK and Static GNSS surveying were accomplished at cadastral re-survey field in Hadong, Gyeongnam and the surveying results were compared. Also, to analyze the performance of site calibration in Network RTK surveying, two types of Network RTK surveying with and without site calibration were accomplished and the results was compared. The research result shows that average positioning error between Network RTK(VRS) without site calibration and Static surveying result is 2.44cm and 1.53cm respectively and average positioning error between Network RTK(VRS) with site calibration and Static surveying result is 0.19cm and 0.82cm respectively at two zone. So, it was proved the effect of calibration in network RTK(VRS) surveying.

The GNSS Accuracy Analysis according to Data Processing S/W (GNSS 자료처리 S/W에 따른 정확도 분석)

  • Lee, Yong-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.628-633
    • /
    • 2018
  • The accuracy of GNSS depends on several factors from the equipment used in data processing because GNSS positioning can be used differently depending on the accuracy required. In the case of the control point surveying requiring high accuracy, GNSS surveying is performed using the relative positioning method, and the observation time and data processing s/w are used differently depending on the class of the control points. On the other hand, the accuracy of academic software depends on the skill of the user, so it may be better to use commercial software in the case of a short baseline. In this study, the results of GNSS survey data were compared using scientific software and commercial software. The results showed that the horizontal position showed a difference of less than 2 cm and the height showed a difference of less than 5 cm. These differences were found to be in the error ranges specified in the unified control point survey regulations. Based on the above results, the commercial s/w can be used for GNSS data processing at the midterm baseline rather than the long baseline.

Development of GNSS Field Survey System for Effective Creation of Survey Result and Enhancement of User Convenience (효과적인 측량 성과물 작성 및 사용자 편의성 강화를 위한 GNSS 현장 측량시스템 개발)

  • Park, Joon Kyu;Kim, Min Gyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.3
    • /
    • pp.203-210
    • /
    • 2017
  • Korea has established an advanced infrastructure for real-time precise positioning such as CORS, virtual reference station service and perform continuous upgrading. However, in order to utilize the national infrastructure, it is necessary to process the acquired spatial information and take many steps to derive the final product. In addition, this process is highly dependent on foreign software. In this study, GNSS field survey system was developed and evaluation of its usability was performed. Real-time GNSS field survey system was developed and the system improves user̓s convenience and usability. The system was able to conduct survey effectively and produce the results. In addition, we compare the existing software with the survey performance to show the availability of the real-time GNSS surveying system. The system developed through the research can perform all the functions from real-time survey to the production of the outputs. It can create economical added value of the foreign software as a whole and simplify the work required for post-survey performance.