• Title/Summary/Keyword: GFRP bridge structure

Search Result 12, Processing Time 0.016 seconds

Structural design using topology and shape optimization

  • Lee, Eun-Hyung;Park, Jaegyun
    • Structural Engineering and Mechanics
    • /
    • v.38 no.4
    • /
    • pp.517-527
    • /
    • 2011
  • A topology optimization and shape optimization method are widely used in the design area of engineering field. In this paper, a unified procedure to combine both topology and shape optimization method is used. A material distribution method is used first to extract necessary design parameters of the structure and a shape optimization scheme using genetic algorithm and satisfying all the condition follows. As an example, a GFRP bridge deck is designed and compared with other commercial products. The performance of the designed deck shows that the used design procedure is very efficient and safe. This procedure can be generalized for using in other areas of engineering.

Application of FRP-Concrete Composite Deck to Cable Stayed Bridge (FRP-콘크리트 합성 바닥판의 사장교 적용)

  • Cho, Keun-Hee;Park, Sung-Yong;Kim, Sung-Tae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.217-220
    • /
    • 2008
  • A modified FRP-concrete composite deck applicable to cable stayed bridge with long girder-to-girder span is proposed, and its design and economical efficiency are presented. The existing FRP-concrete composite deck has low section stiffness due to adoption of GFRP panel with low elastic modulus, which arrives at difficulty in meet of serviceability limit such as deck deflection. So a new-type FRP-concrete composite deck, named precast FRP-concrete deck, is developed by extensioning concrete at the both ends of FRP-concrete composite deck, which brings the effect of reduction of net span length of deck. Compared to the existing FRP-concrete composite deck this modified deck has the advantage of increasing span length but slightly increases self weight. For this type of deck the section optimization is carried out for the cases of simply supported on girder and composite to girder. The optimized deck was applied to cable stayed bridge with a center span length of 540m, and as a result it is verified that PFC deck can be applied efficiently to cable stayed bridge due to reduction of quantity of upper structure.

  • PDF