• 제목/요약/키워드: G7 Test Train

검색결과 35건 처리시간 0.026초

G7 시제 차량의 터널내부 압력파에 대한 수치 해석 (The Numerical Simulation of the Pressure wave for G7 Test Train in the Tunnel)

  • 권혁빈;김태윤;권재현;이동호;김문상
    • 한국철도학회논문집
    • /
    • 제5권4호
    • /
    • pp.260-266
    • /
    • 2002
  • A numerical simulation has been performed to estimate the transient pressure variation in the tunnel when G7 test train passes through the test tunnel in the Kyoeng-Bu high-speed railway. A modified patched grid scheme is developed to handle the relative motion between a train and a tunnel. Also, a hybrid dimensional approach is proposed to calculate the train-tunnel interaction problem efficiently. An axi-symmetric unsteady Euler solve using the Roe's FDS is used for analyzing a complicated pressure field in tunnel during the test train is passing through the tunnel. Usually, this complex phenomenon depends ell the train speed, train length, tunnel length, blockage ratio between train and tunnel cross-sectional area, relative position between train and tunnel, etc. Therefore, numerical simulation should be done carefully in consideration of these factors. Numerical results in this study would be good guidance to make test plans, test equipments selection and to decide their measuring locations. They will also supply important information to the pressurization equipment for high-speed train.

G7 고속전철 기술개발사업에서의 차량시스템 엔지니어링기술 및 시제차량 디자인 개발 (Development of Train System Engineering Technology and Exterior and Interior Design of Prototype Test Train in G7 Project for High Speed Railway Technology)

  • 정경렬;김경택;이병종;윤세균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.533-541
    • /
    • 2003
  • This paper shows the results of train system engineering technology and exterior and interior design of a prototype test train(HSR 350X) which was developed in R&D project titled 'Development of High Speed Railway Technology'. The prototype test train, which has two power cars, two motorized trailers and three trailers, is now being tested on high speed line.

  • PDF

열차풍에 의한 고속선 자갈비산현상 연구 (A Study on the Ballast-flying Phenomena by Strong Wind Induced by High-speed Train)

  • 권혁빈;박춘수
    • 한국철도학회논문집
    • /
    • 제8권1호
    • /
    • pp.6-14
    • /
    • 2005
  • The mechanism of ballast-flying phenomena by strong wind induced by high-speed trains has extensively been investigated by conducting wind tunnel test and field-measuring of wind velocity in the vicinity of the track. The ballast gathered from the Seoul-Busan high-speed railway track has been classified by mass and shape to find relationship between those properties and the characteristic of movement in high wind and 16-channel Kiel-probe array has been used to examine the detailed flow structure above the surface of the track. The probability of ballast-flying during the passage of the high-speed train has been assessed comparing the results from wind tunnel test and that from field-measuring. The results shows that when the G7 train runs well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability far small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore radical countermeasure seems to be needed.

철도차량의 승강장 통과시 발생하는 공기역학적 영향에 대한 실험적 연구 (An Experimental Study on the Aerodynamic Effects Generated by a Train Passing Rear by Platform)

  • 김동현;권혁빈;김도훈;김문헌;송문석
    • 대한기계학회논문집B
    • /
    • 제28권6호
    • /
    • pp.734-739
    • /
    • 2004
  • The aerodynamic effect on platform during the train passage, the results of field test on the high-speed railway platform are discussed and the whole test results and conclusions are synthesized. The field test for the high-speed railway have been conducted on the Osong temporary platform in the newly constructed Seoul-Busan high-speed line and total 12 measurements have been conducted for G7 train and KTX train. The results shows that the high-speed trains have similar aerodynamic characteristics and have far better characteristics referring to the conventional trains such as Saemaul and Mugungwha trains. To discuss the actual aerodynamic effects on the platform at its own operational speed, Beaufort wind scale have been introduced and the criteria for the safety on railway platform has also been discussed.

경부고속철도 시험선 구간에서 G7 고속전철 차량의 동특성 검토 (Review on the Dynamic Behavior of G7 High Speed Train(KHST) in the KTX Test Line)

  • 박찬경;김영국;배대성;박태원
    • 한국철도학회논문집
    • /
    • 제4권4호
    • /
    • pp.131-137
    • /
    • 2001
  • The dynamic behavior of high speed train is very important because of its safety and passengers' ride comfort. The railway vehicle is composed of many suspension components, such as 1st springs, 1st dampers, 2nd springs and 2nd dampers, that have an influence on the dynamic characteristics of high speed train. Also, the wheel/rail shapes and the track geometry affect the dynamic behavior of high speed train. This paper reviews the dynamic behavior of KHST in the KTX test line. The VAMPIRE program is used for this simulation. The simulation results are within the limits of safety criteria. Thus the KHST can operate safely at 350 km/h in the KTX test line.

  • PDF

자갈비산 메커니즘 연구를 위한 고속철도차량 하부유동 계측 (Track Measurements of Strong Wind under High-speed Train to Investigate Ballast-flying Mechanism)

  • 권혁빈;박춘수;남성원;고태환
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.369-373
    • /
    • 2005
  • To investigate the mechanism of ballast-flying phenomena by strong wind induced by high-speed trains, wind velocity in the vicinity of the track has been measured using 16-channel Kiel-probe array and detailed flow structure near the surface of the track has been analyzed. The position at which the underflow fully develop has been examined in order to assess the driving force of the turbulent flow under train and the results yields that the turbulent flow owing to the cavity of the inter-car as well as the friction force at the underbody of the train is the main reason of the strong wind under high-speed train. The preceding wind tunnel test results has been introduced to assess the probability of ballast-flying during the passage of the high-speed train by comparing the results from field-measuring. The results shows that when the G7 train as well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability for small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore more radical countermeasure seems to be needed.

  • PDF

고속철도 차량용 소결 마찰재료 개발 (Development of the Sintered Friction Material for the High Speed Railway)

  • 김기열;김상호;김유신;이범주;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.315-321
    • /
    • 2004
  • Dawin Friction Corp. has been advanced sintered brake pad for Korean concept high speed train (so called G7 train) with KRRI, You Jin and Rotem without the assistance of foreign company. In the course of development, the evaluation of our and foreign disk pads was performed by lab scale dynamometer and full scale dynamometer. As the result of dynamo test, it is shown that our developed brake disk is equal or superior to those of foreign companies in many respects, for example, wear resistance, noise, etc. The new brake pad which is developed through 'post G7-project' is equipped with G7 train and is under many tests without any problems at the present moment.

  • PDF

한국형 고속전철용 견인전동기 개발 (Development of the Traction Motor for High Speed Train)

  • 이상우;윤종학;최종묵;박계서
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.427-433
    • /
    • 2002
  • An inverter-driven induction motor is usually adapted to the traction motor for a high speed drive system requiring safety, reliability, performance, compact size owing to the space and weight alloted for attaching to train, etc. and AC Traction motor for G7 train will be operated in the worst condition such as mechanical vibration, limited mounting space, severe thermal stress, inverter with non-sinusoidal voltage waveform, dust and so on. therefore, design procedure must be carefully carried out wi th considering the motor size, vibration and thermal expansion of rotor bars, insulation system, reliability of frame, as well as output characteristics. In this paper, we will inform the characteristics and design of the traction motor for G7 train and also analyze the test result of it.

  • PDF

한국형 고속열차의 공익적 목적 활용방안 대안 연구 (Investigation on the directions of practical use in public purpose of the proto-type Korean High Speed Train(HSR 350 x))

  • 목진용;박찬경;김기환;김상수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.613-618
    • /
    • 2008
  • Proto-type Korean High Speed Train(HSR 350x) had developed in 2002 through G7 High Speed Train R&D project from 1996, had carried successful trial running test up to 350km/h and has been executing running test more than 0.2 Mil. kilometers of accumulated running distance to insure reliability on service line till July 2008. Even though the R&D project has finished by Oct. 2007, the proto-type train HSR 350x has maintaining various measuring functions and test facilities till now. So it may be needed a suggestion on the direction of practical use in public purpose of the HSR 350x. This study has suggested several directions of practical use in public purpose of the HSR 350x, and feasibilities for each alternatives of practical use in order to contribute making reasonable decision for practical use of the train in public purpose for the future.

  • PDF

400km/h급 전차선로 시스템의 시범적용 구간선정 연구 (The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System)

  • 유향복;장사술;박재웅;이해원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF