• Title/Summary/Keyword: Fussel-Vesely

Search Result 3, Processing Time 0.018 seconds

A Study on Reliability Analysis and Quantitative Risk Analysis for Liquefied Petroleum Gas Station (LPG 충전시설에 대한 신뢰도 분석과 정량적 위험성 분석에 관한 연구)

  • Kim In-Won;Jin Sang-Hwa;Kim Tea-Woo;Kim In-Tae;Yeo Yeong-Koo
    • Journal of the Korean Institute of Gas
    • /
    • v.5 no.4 s.16
    • /
    • pp.40-48
    • /
    • 2001
  • For a Liquified Petroleum Gas(LPG) station, the reliability analysis, such as Fussell-Vesely importance, risk decrease factor and risk increase factor, was carried out and the risk ranks of events were determined. In order to confirm the degree of the risks identified in the reliability analysis, the quantitative risk analysis was done for the equipments which had the large values of risk ranks. As a result of the importance analysis for the LPG station, the external event was identified as the most riskful event. The defect of construction structure and the pipe corrosion were riskful as well. The result of quantitative risk analysis showed that the length of 46.3 meters were estimated to damage the process equipments by the thermal flux from the catastrophic rupture of storage tank in Boiling Liquid Expanding Vapor Explosion.

  • PDF

Development and Implementation of Measures for Structural and Reliability Importance by Using Minimal Cut Sets and Minimal Path Sets (최소절단집합과 최소경로집합을 이용한 구조 및 신뢰성 중요도 척도의 개발 및 적용)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.225-233
    • /
    • 2012
  • The research discusses interrelationship of structural and reliability importance measures which used in the probabilistic safety assessment. The most frequently used component importance measures, such as Birnbaum's Importance (BI), Risk Reduction (RR), Risk Reduction Worth (RRW), RA (Risk Achievement), Risk Achievement Worth (RAW), Fussel Vesely (FV) and Critically Importance (CI) can be derived from two structure importance measures that are developed based on the size and the number of Minimal Path Set (MPS) and Minimal Cut Set (MCS). In order to show an effectiveness of importance measures which is developed in this paper, the three representative functional structures, such as series-parallel, k out of n and bridge are used to compare with Birnbaum's Importance measure. In addition, the study presents the implementation examples of Total Productive Maintenance (TPM) metrics and alternating renewal process models with exponential distribution to calculate the availability and unavailability of component facility for improving system performances. System state structure functions in terms of component states can be converted into the system availability (unavailability) functions by substituting the component reliabilities (unavailabilities) for the component states. The applicable examples are presented in order to help the understanding of practitioners.

Study on the Fire Safety Estimation for a Pilot LNG Storage Tank (PILOT LNG저장탱크의 화재안전성 평가에 관한 연구)

  • 고재선;김효
    • Fire Science and Engineering
    • /
    • v.18 no.3
    • /
    • pp.57-73
    • /
    • 2004
  • Quantitative safety analysis through a fault tree method has been conducted for a fire broken out over the spilling LNG from a pilot LNG tank, which may have 4 types of scenarios causing potentially risky results. When we consider LNG release from venting pipelines as a first event, any specific radius of Low Flammable Limit(LFL) has not been built up. The second case of LNG outflow from the rupture of storage tank which will be the severest has been analyzed and the results revealed various diffusion areas to the leaking times even with the same amount of LNG release. As a third case LNG leakage from the inlet/outlet pipelines was taken into consider. The results showed no significant differences of LFL radii between the two spilling times of 10 and 60 minutes. Hence, we have known the most affecting factor on the third scenario is an initial amount of LNG release. Finally, the extent of LFL was calculated when LNG pipelines around the dike area were damaged. In addition, consequence analysis has been also performed to acquire the heat radiation and flame magnitude for each case.