• Title/Summary/Keyword: Full System Commissioning

Search Result 8, Processing Time 0.023 seconds

A Railway Safety Proposal with Full System Commissioning (철도시스템의 종합시험운행을 통한 철도안전 확보방안)

  • Kim, Young-Woo;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.34-38
    • /
    • 2007
  • Rail network authority have to do the safety ensuring activities including the maintenance of railway facilities, integrated performance verification between the facilities and related lolling stock and safety inspections, etc. When constructing the new lines or upgrading the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facilities and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.

A Railway Safety Proposal with Full System Commissioning (철도시스템의 종합시험운행을 통한 철도안전 확보방안)

  • Kim, Jeong-Joo;Lee, Hi-Sung;Moon, Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.522-527
    • /
    • 2005
  • Rail network authority have to do the safety ensuring activities including the maintenance of railway facility, integrated performance verification between the facilities and related rolling stock and safety inspections, etc. When constructing the new lines or revising the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facility and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.

  • PDF

Survey on the virtual commissioning of manufacturing systems

  • Lee, Chi G.;Park, Sang C.
    • Journal of Computational Design and Engineering
    • /
    • v.1 no.3
    • /
    • pp.213-222
    • /
    • 2014
  • This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

Commissioning Results of the Warm Compression System for the KSTAR Helium Refrigeration System (KSTAR 헬륨냉동기의 압축시스템 시운전 결과)

  • Park, Dong-Seong;Chang, Hyun-Sik;Joo, Jae-Joon;Moon, Kyung-Mo;Cho, Kwang-Woon;Kim, Yang-Soo;Bak, Ju-Shik;Kwon, Il-Keun;Cho, Myeon-Chul;Yang, Seung-Han
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.125-130
    • /
    • 2008
  • The main components of the KSTAR helium refrigeration system (HRS) can be classified into the warm compression system (WCS) and the cryogenic devices according to the operating temperature levels. The WCS itself consists of the compressor station (C/S) and the oil removal system (ORS). The process helium is compressed from 1 bar to 22 bar maximum in the C/S and downstream, the ORS removes the oil mixed in the helium to less than 10 ppbw as per the operation criteria of the cryogenic devices of the KSTAR HRS. After the installation, the pre-commissioning and commissioning activities were started on July, 2007. Before the start-up of the C/S, vibration measurement and the skid reinforcement jobs were performed for stable operation of the C/S. The results of the WCS performance tests met the requirements of the KSTAR HRS but satisfied the vibration level criteria only at the compressors' full load condition.

  • PDF

Practical Experience with Full-scale Performance Verification of Dynamic Vibration Absorbers installed in Tall Buildings

  • Love, J.S.;Morava, B.
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.2
    • /
    • pp.85-92
    • /
    • 2021
  • Dynamic vibration absorbers (DVAs) in the form of tuned sloshing dampers (TSDs) and tuned mass dampers (TMDs) are commonly used to reduce the wind-induced motion of high-rise buildings. Full-scale performance of structure-DVA systems must be evaluated during the DVA commissioning process using structural monitoring data. While the random decrement technique (RDT) is sometimes employed to evaluate the DVA performance, it is shown to have no theoretical justification for application to structure-DVA systems, and to produce erroneous results. Subsequently, several practical methods with a sound theoretical basis are presented and illustrated using simulated and real-world data. By monitoring the responses of the structure and DVA simultaneously, it is possible to directly measure the effective damping of the system or perform system identification from which the DVA performance can be evaluated.

KLYSTRON-MODULATOR SYSTEM PERFORMANCES FOR PLS 2-GeV LINAC (포항 20억 전자볼트 선형가속기 클라이스트론-모듈레이터 시스템의 성능)

  • Park, S.W.;Park, S.S.;Lee, K.T.;Oh, J.S.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07c
    • /
    • pp.1365-1367
    • /
    • 1995
  • The PLS 2-GeV linac employs 11 units of high-power pulsed klystrons(80MW) as the main RF sources. The matching modulators of 200 MW(400kV, 500 A) can provide a flat-top pulse width of 4.4 ${\mu}s$ with a maximum pulse repetition rate of 120 Hz at the full power level. For a good stability of electron beams, the pulse-to-pulse flat-top voltage variation of a modulator requires less than 0.5%. In order to achieve this goal, we stabilized high voltage charging power supplies within 1% by a phase controlled SCR voltage regulator. In addition, we employed ac/dc feedback together with a resistive De-Q'ing system to achieve far less than 0.5% variation of the PFN charging voltage. This paper presents the main feature of the klystron-modulator system and the characteristics of the pulsed high-power RF system performance during the beam injection operation for the Pohang Light Source commissioning.

  • PDF

A Method for Generating a Plant Model Based on Log Data for Control Level Simulation (제어시뮬레이션을 위한 생산시스템 로그데이터 기반 플랜트 모델 생성 방법)

  • Ko, Minsuk;Cheon, Sang Uk;Park, Sang Chul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.1
    • /
    • pp.21-27
    • /
    • 2013
  • Presented in the paper is a log data based modeling method for effective construction of a virtual plant model which can be used for the virtual PLC (Programmable Logic Controller) simulation. For the PLC simulation, the corresponding virtual plant, consisting of virtual devices, is required to interact with the input and output symbols of a PLC. In other words, the behavior of a virtual device should be the same as that of the real device. Conventionally, the DEVS (Discrete Event Systems Specifications) formalism has been used to represent the behavior a virtual device. The modeling using DEVS formalism, however, requires in-depth knowledge in the simulation area, as well as the significant amount of time and efforts. One of the key ideas of the proposed method is to generate a plant model based on the log data obtained from the production system. The proposed method is very intuitive, and it can be used to generate the full behavior model of a virtual device. The proposed approach was applied to an AGV (Automated Guided Vehicle).

Field Application of H-Bridge Multi-level Inverter for Fluidized Bed Combustion Boiler Secondary Air Fan (200MW 석탄화력 순환 유동층 보일러 이차공기송풍기용 H-브릿지 멀티레벨 인버터 현장적용)

  • Kim, Bong-Suck;Ryu, Ho-Seon
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.12 no.5
    • /
    • pp.424-431
    • /
    • 2007
  • This thesis proposed H-Bridge Multi-Level Inverter for Fluidized Bed Combustion Boiler Secondary Air Fan in 200MW thermal power plant. The adjustable speed drive systems improve the efficiency in lightly load condition and extend the life span of motor by limiting the over current at starting. H-Bridge Multi-level Inverter is composed of the several series low voltage power cell inverters, which have the independent isolated do link, in each phase. KEPRI(Korea Electric Power Research Institute) has successfully completed to develop, install, and commission H-Bridge Multi-level Inverter(6.6kV, 1MVA). This thesis gives a full detail about H-Bridge Multi-level Inverter, proposed boiler DCS(Distributed Control System) logic, and commissioning test result.