• Title/Summary/Keyword: Full Disk Schedule

Search Result 2, Processing Time 0.016 seconds

Moon Imaging for the Calibration of the COMS Meteorological Imager (천리안 위성의 기상탑재체 보정을 위한 달 영상 획득 방안)

  • Park, Bong-Kyu;Yang, Koon-Ho
    • Aerospace Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.44-50
    • /
    • 2010
  • COMS accommodates multiple payloads; Meteorological Image(MI), Ocean Color Imager(GOCI) and Ka-band communication payloads. In order to improve the quality of MI visible channel, the moon image has been taken into account as backup reference in addition to Albedo monitoring. However, obtaining the moon image by adding special mission schedule is not recommended after IOT, because we may miss chances to obtain meteorological images during the time slots for special imaging. As an alternative solution, an approach extracting moon image from MI FD(Full Disk) image has been proposed when the moon is positioned near to the earth. However, prediction of acquisition time of moon image is somewhat difficult as the moon moves while the MI is scanning type sensor. And the moon can not be seen when it is behind the earth or outside of FD field of view. This paper discusses how effectively the moon can be detected by the MI FD imaging. For that purpose, this paper describes an approach taken to predict the time when the moon image is achievable and then introduces the results obtained from computer simulation.

Introduction on the Products and the Quality Management Plans for GOCI-II (천리안 해양위성 2호 산출물 및 품질관리 계획)

  • Lee, Sun-Ju;Lee, Kyeong-Sang;Han, Tae Hyun;Moon, Jeong-Eon;Bae, Sujung;Choi, Jong-kuk
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.5_2
    • /
    • pp.1245-1257
    • /
    • 2021
  • GOCI-II, succeeding the mission of GOCI, was launched in February 2020 and has been in regular operation since October 2020. Korea Institute of Ocean Science and Technology (KIOST) processes and produces in real time Level-1B and 26 Level-2 outputs, which then are provided by Korea Hydrographic and Oceanographic Agency (KHOA). We introduced current status of regular GOCI-II operation and showed future improvement. Basic GOCI-II products including chlorophyll-a, total suspended materials, and colored dissolved organic matter concentration, are induced by OC4 and YOC algorithms, which were described in detail. For the full disk (FD), imaging schedule was established considering solar zenith angle and sun glint during the in-orbital test, but improved by further considering satellite zenith angle. The number of slots satisfying the condition 'Best Ocean' significantly increased from 15 to 78. GOCI-II calibration requirements were presented based on that by European Space Agency (ESA) and candidate fixed locations for calibrating local observation area were. The quality management of FD uses research ships and overseas bases of KIOST, but it is necessary to establish an international calibration/validation network. These results are expected to enhance the understanding of users for output processing and help establish detailed plans for future quality management tasks.