A phasor estimation algorithm based on the least square curve fitting technique for the distorted secondary current due to current transformer (CT) saturation is proposed. The mathematical form of the secondary current during CT saturation is represented as the scaled primary current with magnetizing current. The information on the scaled primary current is estimated using the least square technique, with the measured secondary current in the saturated section. The proposed method can estimate the phasor of a fundamental frequency component during the saturated period. The performance of the algorithm is validated under various fault and CT conditions using a C400 CT model. A series of performance evaluations shows that the proposed phasor estimation algorithm can estimate the phasor of the fundamental frequency component with high accuracy, regardless of fault conditions and CT characteristics.
Electroforming is the highly specialized use of electrodeposition for the manufacture of metal parts and basically a specialized form of electroplating. So, we can apply electrochemical system analysis for electroforming process. Electrochemical systems are concerned with the interplay between electricity and chemistry, namely the measurements of electrical quantities, such as current density, potential, and charge, and their relationship to chemical parameters. This paper based on the basic equations of electrics and electrochemical kinetics, was employed for a theoretical explanation of the current density distribution on electroforming process. We calculated current density distribution and potential distribution on cathode. Also, calculated current density distribution of vertical direction. It was shown that current density is related with distance of between anode and cathode and mass transfer process.
Park, Jungsam;Bae, Jaesung;Hwang, Jaihyuk;Kang, Kukjeong
Journal of Aerospace System Engineering
/
v.2
no.3
/
pp.24-28
/
2008
Eddy current are induced when a nonmagnetic, conductive material is moving as the result of being subjected to the magnetic field, or if it is placed in a time-varying magnetic field. These currents circulate in the conductive material and are dissipated, causing a repulsive force between the magnet and conductor. Using this concept, eddy current damping can be used as a form of viscous damping. This paper investigated analytically and experimentally the characteristics of an eddy current damping when a permanent magnet is placed in a conductive tube. The theoretical model of the eddy current damping is developed from electromagnetics and is verified from Maxwell program and experiments. From these comparisons, although predictability is not accurate at high excitation frequencies, the present model can be used to predict damping force at low excitation frequencies. In order to improve the prediction of the characteristics of an eddy current damping, the induced magnetic flux densities have to be considered in following researches.
Journal of the Korean Institute of Telematics and Electronics A
/
v.29A
no.8
/
pp.71-77
/
1992
According to increasing the doping concentration in p-n junction, a tunneling current through trap as well as SRH(Shockley-Read-Hall) generation-recombination current in depletion region occurs. It is the tunneling current that is a dominant current at the forward bias. In this paper, the new tunneling-recombination equation is derived. The thermal generation-recombination current and tunneling current though trap can be easily calculated at the same time because this equation has the same form as the SRH generation-recombination equation. For the validity of this equation, 2 kind of samples are simulated. The one is $n^{+}$-p junction device fabricated with MCT(Mercury Cadmium Telluride, mole fraction=0.29), the other Si n$^{+}-p^{+}$ junction. From the results for MCT $n^{+}$-p junction device and comparing the simulated and expermental I-V characteristics for Si n$^{+}-p^{+}$ junction, it is shown that this equation is a good description for tunneling through trap and thermal generation-recombination current calculation.
The process of electromembrane transformation of L-lysine monohydrochlorides into their zwitterionic form in four- and two-chamber electrodialysis apparatus was investigated. The process of transformation at various concentrations of lysine monohydrochloride (0.1-0.6 mol.L-1) was studied and it was established that at the optimum density of current optimal concentrations of lysine hydrochloride during electrodyalisis was in the range of 0.2-0.4 mol.L-1. It was determined that the process of total transformation was accomplished when pH of the lysine solution achieved 10. Changes of concentrations of $Cl^-$ ions and lysine diffused into the neighboring chamber were determined depending on the time. The method developed by us allows adjusting the removal coefficient of $Cl^-$ ions during transformation to a maximal value, the losses of lysine diffused into the next chamber after its return to the technological cycle being less than 1.0 %. The specific energy consumption during the process of transformation in two- and four-chamber electrodialyzers was 0.19 and 0.205 A.h.kg-1 and the current efficiency was 75.9 and 73.1 %, correspondingly. Study of the process of electromembrane transformation allowed obtaining zwitterionic form of L-lysine from L-lysine monohydrochloride with minimal reagent and energy consumption.
Journal of the Korean Society of Marine Environment & Safety
/
v.19
no.1
/
pp.78-84
/
2013
The primary objective of the current work is to develop efficient numerical code to assess the resistance performance of the twin hull form. Resistance performance for the two different twin hull forms with asymmetric and symmetric mono hull using developed code are evaluated. Numerical calculations and model tests have been compared to validate a developed code used in the current work. Comparison were carried out through sinkages of the bow and stern, trim angle and wave-making resistance. Comparative analysis regarding hydrodynamic characteristic of different twin hull forms is worthy of application in the hull form development stage.
Korean Journal of Construction Engineering and Management
/
v.4
no.1
s.13
/
pp.90-96
/
2003
The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.
Journal of the Korean Institute of Telematics and Electronics A
/
v.29A
no.9
/
pp.56-64
/
1992
Because of a small bandgap energy, a high doping density, and a low operating temperature, the dark current in HgCdTe photodiode is almost composed of a tunneling current. The tunneling current is devided into an indirect tunneling current via traps and a band-to-band direct tunneling current. The indirect tunneling current dominates the dark current for a relatively high temperature and a low reverse bias and forward bias. For a low temperature and a high reverse bias the direct tunneling current dominates. In this paper, to verify the tunneling currents in HgCdTe photodiode, the new tunneling-recombination equation via trap is introduced and tunneling-recombination current is calculated. The new tunneling-recombination equation via trap have the same form as SRH (Shockley-Read-Hall) generation-recombination equation and the tunneling effect is included in recombination times in this equation. Chakrabory and Biswas's equation being introduced, band to band direct tunneling current are calculated. By using these equations, HgCdTe (mole fraction, 0.29 and 0.222) photodiodes are analyzed. Then the temperature dependence of the tunneling-recombination current via trap and band to band direct tunneling current are shown and it can be known what is dominant current according to the applied bias at athe special temperature.
The LC filter design procedure of the inverter output filter is described. The transfer function of the filter output voltage to the load current is described with the capacitor value and the system time constant considering the system controller. By using the closed form of the relation between the filter capacitor value and the system time constant, the capacitor value can be calculated with the given system time constant and vice versa. It is more practical for the implementation of power and control circuit of inverter. And as the effect of the load current to the voltage distortion can be calculated from the closed form, it is possible to analyze the system how much the voltage waveform is distorted in case of the nonlinear load. All the proposed design procedure is verified with the simulation and experimental results.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.2
/
pp.83-89
/
2007
The LC filter design procedure of the inverter output filter is described. The transfer function of the filter output voltage to the load current is described with the capacitor value and the system time constant considering the system controller. By using the closed form of the relation between the filter capacitor value and the system time constant, the capacitor value can be calculated with the given system time constant and vice versa. It is more practical for the implementation of power and control circuit of inverter. And as the effect of the load current to the voltage distortion can be calculated from the closed form, it is possible to analyze the system how much the voltage waveform is distorted in case of the nonlinear load. All the proposed design procedure is verified with the simulation and experimental results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.