• Title/Summary/Keyword: Forestry build-up region

Search Result 2, Processing Time 0.019 seconds

Studies on design of forest road nets for mechanized yarding operations - Classification of forest site - (기계화(機械化) 집재작업(集材作業)을 위한 노망(路網)의 정비 - 임지(林地)의 분류(分類) -)

  • Cha, Du Song;Cho, Koo Hyun;Ji, Byung Yun
    • Journal of Forest and Environmental Science
    • /
    • v.9 no.1
    • /
    • pp.57-66
    • /
    • 1993
  • The purpose of this study is to offer detailed topographic information for substantially selecting the yarding machine for mechanized yarding operations, classifying the forest site by cluster analysis and principal component analysis, and investigating simultaneously the variables which give much influence on the classification of forest site in forestry build-up region (21, 477ha) of Chunchon Gun, Kwangweon Do. Ten topographic variables were used for the analysis. The results of study were as follows : 1) Gosung region (2, 252ha) was classified into hilly terrain (57%) and steep terrain (43%) and required the tractor prehauling system for the former one and the medium skyline system for latter one, respectively. 2) 65% of Gajung region (2,306ha) and 67% of Kwangpan region (2, 627ha) were classified into steep terrain fitted for the medium skyline system and the portion of both region showed the hilly terrain for the tractor prehauling system. 3) Jiam region (4, 591ha), consisted only of steep terrain, required the medium skyline system. 4) Gunja region (3, 400ha), Sudong region (3, 984ha) and Sinpo region (2, 340ha) were classified into steep terrain, requiring the medium skyline system, with 85%, 75%, and 75%, respectively.

  • PDF

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF