• 제목/요약/키워드: Floor fountain

검색결과 4건 처리시간 0.015초

광주지역 바닥분수의 수질특성 평가 (Evaluation of Water Quality Characteristics of Floor Fountains in Gwangju)

  • 김종민;김하람;장서은;최영섭;강유미;정숙경;조영관;김은선
    • 한국환경보건학회지
    • /
    • 제43권2호
    • /
    • pp.143-156
    • /
    • 2017
  • The purpose of this study was to investigate water quality through a field survey at six floor fountain sites. The floor fountain facilities were designed and operated in such a way that tap water was stored in a water tank and recycled repeatedly. The water tank was cleaned once or twice per week in the summer. The number of facility users was low during the day due to sweltering heat, but up to 40 people, mainly children, were using them around 8 pm. Since the operation time was as short as 30 minutes, it is considered necessary to extend it for at least one hour for the number of users. As a result of the water quality test of the reservoir tank prior to operation after cleaning, it was measured to be within drinking water quality standards at the six facilities. As a result of the water quality test after use, ammonia nitrogen was measured to be 1.45 mg/L at Site IV. This exceeded the drinking water quality standard of 0.5 mg/L. In the case of turbidity, two cases exceed at 7.38 and 4.52 NTU when applying 4 NTU as the water quality standard for waterscape facilities. Twenty-eight cases exceed the standard of drinking water quality. The result of microbiological tests, at five sites excepting Site I, where disinfectant was injected, was that the maximum total colony count was 180,000 CFU/mL, total coliforms was 2,100,000 CFU/100 mL, fecal coliforms was 4,600 CFU/100 mL, Escherichia coli was 170 MPN/100 mL and Enterococcus was 100 CFU/100 mL. This exceeded the water quality standards of drinking water. Children are very likely to inhale because the water spews from below and falls from above, so it is necessary to apply water quality standards for ammonia nitrogen, turbidity and microbes. Current floor fountain facilities are highly susceptible to disease caused by microbial contamination because of water cycling and reuse, so it is necessary to change the water every day, clean the water tank, and perform chlorination. Therefore, it is necessary to inject calcium hypochlorite according to the free chlorine water quality standard of swimming pools with a different water tank capacity. In addition, facilities should be improved to prevent the reuse of water by installing the water tank at a separate location.

우도(牛島) 분화구(噴火口)에서의 일윤회(一輪廻) 화산과정(火山過程) (One-cyclic Volcanic Processes at Udo Crater, Korea)

  • 황상구
    • 자원환경지질
    • /
    • 제26권1호
    • /
    • pp.55-65
    • /
    • 1993
  • Udo Island, some 3 km off the coast of Sungsan Peninsula at the eastern promontory of Cheju Island, occurs in such a regular pattern on the sequences which reprent an excellent example of an eruptive cycle. The island comprises a horseshoe-shaped tuff cone, a nested cinder cone on the crater floor, and a lava delta which extends over northwest from the moat between two cones. The volcanic sequences suggest volcanic processes that start with emergent Surtseyan eruption, progress through Strombolian eruption and end with lava effusion followed by reworking of smooth tephra on the tuff cone. Eruptive environment and hydrology of vent area in the Udo tuff cone are poorly constrained because the stratigraphic units under the tuff cone are unknown. It is thoughl, however, that the tuff cone could be mainly emergent because the present cone deposits show no evidence of marine reworking, and standing body of sea water could play a great role. The emergent volcano is characterized by distinctive steam-explosivity that results primarily from a bulk interaction between rapidly ascending magma and a highly mobile slurry. The sea water gets into the vent by flooding accross or through the top or breach of tephra cone. Udo tuff cone was constructed from Surtseyan eruption which went into with tephra finger jetting activities in the early stage, late interspersed with continuous uprush activities and proceeded to only continuous uprush activities in the last. When the enclosure of the vent by a long-lived tephra barrier would prevent the flooding and thus allow the vent to dry out, the Surtseyan eruption ceased to transmit into Strombolian activities, which constructed a cinder cone on the crater floor of the tuff cone. The Strombolian eruption ceased when magma in the conduit gradually became depleted in gas. In the case of Udo, the last magmatic activity was Hawaiian-type (and/or fountain) which accumulated basalt lava delta. And then the loose tephra of the tuff cone reworked over the moat lava and the northeastern flank.

  • PDF

다산 어린이 공원설계 (Design of the Dasan Children's Park)

  • 김성균
    • 한국조경학회지
    • /
    • 제29권5호
    • /
    • pp.51-59
    • /
    • 2001
  • This paper presents a design of the Dasan Children\`s Park which is located Shindang- dong, lung-gu, Seoul which has an area of about 3,678$m^2$. Objectives for the design were to make nature-friendly space, learning space, interesting play space, space for every child, adventure play space, traditional play space, sense of place, and recycle space. For the space compositions a children\`s garden, a traditional play space, and a science play space were located around the S shaped main route. Facilities relating nature, science, culture. environment and adventure play were arranged in the 3 main spaces. The Children\`s Garden is a green space for learning and playing with natural elements. It is composed of a ecological learning space, a children\`s story garden, a children\`s song road, an environmental labyrinth, and a pall space leer handicap children. The Science Play Place is a place space for learning scientific theories through plays to which scientific theories were applied. It is composed of a total play structure, a math experience playground, a \"Keojunggi\" play space, a sound reflecting experience space, arid an infant playground. The Traditional Play Madang(space) is a space for traditional plays. It is composed of a traditional play pattern, a sun dial, and a floor fountain. The Recycle Road is a dragon shaped road fort learning about resource recycling and conservation. It is composed of a dragon head, body, tail space and a dragon bead(cint mani).int mani).

  • PDF

수질기준 법제화에 따른 물놀이형 수경시설의 수질관리방안 연구 (A Study on Water Quality Management Methods of Waterscape Facilities in Accordance Legislation of Water Quality Criteria)

  • 나경호;정주용;김지수;변주형
    • 한국물환경학회지
    • /
    • 제33권4호
    • /
    • pp.487-493
    • /
    • 2017
  • This study was conducted to propose measures of water quality management as the water criteria for waterscape facilities which have been highlighted as alternatives to wading pools in summer season was legislated. The number of public waterscape facilities has reached 290 sites in Gyeounggi province and 971 sites in South Korea in 2017. The water tank capacity of 80.3 % public waterscape facilities was less than $100m^3$. Facilities with disinfection system were only 6.5 % and facilities with filtration function were also very low at 6.9 %. Most of the waterscape facilities, about 93%, are expected to be vulnerable to complying with revised water quality criteria because they have to be disinfected by handling. Chlorine disinfectants, which are more persistent than ozone or ultraviolet sterilization methods, are more preferred. However, care should be taken when adding disinfectans because hypochlorous acid, which is an effective component of chlorine disinfectant, remains after the disinfection, but it is easily decomposed with time. For this study, ${\bigcirc}{\bigcirc}$ park floor fountain with a capacity of $63m^3$ was selected and the amount of free residual chlorine concentration was measured by injecting a certain amount of chlorine bleach. As a result, it took 5 hours to decrease from the water quality standard of 4 mg/L to 0.04 mg/L. If the waterscape facility is operated for 7 to 8 hours, the chlorine bleach should be re-injected after 5 hours. In addition, the problem of pH increase due to the input of chlorine disinfectant is expected, and the neutralization method using vinegar was proposed.