• Title/Summary/Keyword: Flood discharge

Search Result 651, Processing Time 0.022 seconds

Discharge Equation Related to a Levee-Break for a Flood Hazard Map (홍수위험지도 작성을 위한 하천 제방 붕괴 유량공식 제안)

  • Lee, Khil-Ha;Kim, Sung-Wook;Choi, Bong-Hyuck
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.623-627
    • /
    • 2015
  • To compile a flood hazard map it is essential to identify the potential risk areas. A scenario-based numerical modeling approach is commonly used to build a flood hazard map in the case of a levee-break. The model parameters that capture peak discharge, including breach formation and progress, are important in the modeling method. In this study an earth-levee-break model is constructed under the assumption that the failure mechanism and hydraulic processes are identical for all levee-break river activities. Estimation of the hydrograph at the outlet as a function of time is highlighted. The constructed hydrograph can then serve as an upper boundary condition in running the flood routing model downstream, although flood routing is not considered in this study.

Flood Travel Time Analysis using Two-dimensional Hydraulic Model in Yeong-san River Downstream (2차원 수리해석모형을 이용한 영산강 하류부의 홍수파 도달시간 분석)

  • Oh, Ji-Hwan;Jo, Jun-Won;Jang, Suk-Hwan;Choov, Jeong-Ho;Oh, Kyoung-Doo
    • Journal of Wetlands Research
    • /
    • v.20 no.4
    • /
    • pp.446-457
    • /
    • 2018
  • Forecasting of flood wave travel time is very important in terms of river management and operation. Recently, the hydrological environment of has changed due to the construction of multi-function weir in the river. It is necessary to analyze flood wave travel time, including hydraulic structures in the channel. The flood wave travel time according to the discharge and downstream water level operating conditions was analyzed using HEC-RASver5.0.3 which is capable a two-dimentional analysis. This study showed nonlinear characteristics of flood wave travel times due to increase of discharge and operating conditions. The results of this study will be helpful for the operation of multi-function weir as well as the river operation.

A Study on the Stage-Discharge Relationship in the Lower Reach of the Sumjin River (섬진강 하류부에서의 수위-유량관계에 관한 연구)

  • 이재형;황만하
    • Water for future
    • /
    • v.27 no.4
    • /
    • pp.115-121
    • /
    • 1994
  • In tidal rivers, the water level is affected by a tidal wave. The latter creates higher flood stages that enlarge the flood plain areas and increase potential damages. In such rivers, the water level is not solely a function of the flow discharge but rather a joint function of both the discharge and tidal phenomena. This paper attempts at formulating a relation between tital water level and river flow discharge that can be used for the predictions of water level in coastal rivers. Numerical applications were performed on the HaDong and the SongJung Station in Sumjin river with satisfactory results. The correlation coefficients between the tide(M) and the water stage(Z) at the HaDong Station is 0.558, and SongJung is 0.016. From this result, the water level at HaDong Station is greatly affected by a tide, whereas songJung is not.

  • PDF

Comparative analysis of inundation flow patterns and flood risk assessment methods within subway stations (지하철 역사 내 침수 흐름 분석 및 침수 위험도 평가 방법 비교)

  • Shin, Jaehyun;Kim, Minjeong;Cho, Inhwan;Park, Inhwan
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.10
    • /
    • pp.667-678
    • /
    • 2023
  • In this study, quasi-3D inundation flow simulations were conducted for a simplified subway station configuration. The effects of variations in rainwater inflow locations and discharge were investigated, analyzing the resulting inundation flow patterns and flood risk. The inundation simulation results calculated the incipient velocities for slipping and toppling accidents to assess pedestrian safety. The results indicated that velocities exceeding the incipient velocity for slipping accidents mainly occurred on the flooded staircase. Meanwhile, velocities surpassing the incipient toppling accidents were observed around the staircase and the corridor near the staircase leading to B2F. This observation is consistent with the results from the specific force distribution analysis. To provide detailed flood risk assessments, the Flood Hazard Degree (FD) was applied with four levels of criteria, along with the Flood Intensity Factor (FIF). The results demonstrated that FD identified a broader area at risk of flood-induced consequences compared to FIF. When comparing the different inundation risk assessment methods, the specific force method tended to overestimate the risk area, whereas FIF tended to underestimate it. Furthermore, among all assessment methods, the influence of rainwater discharge was found to have a more dominant effect on flood risk assessment compared to the number of rainwater inflow locations. Additionally, the direction of inundation flow influenced the assessed risk, with collision-induced flow patterns leading to higher flood risk than those with identical flow directions.

Estimation of Flood Discharge Using Satellite-Derived Rainfall in Abroad Watersheds - A Case Study of Sebou Watershed, Morocco - (위성 강우자료를 이용한 해외 유역 홍수량 추정 - 모로코 세부강 유역을 대상으로 -)

  • KIM, Joo-Hun;CHOI, Yun-Seok;KIM, Kyung-Tak
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.3
    • /
    • pp.141-152
    • /
    • 2017
  • This paper presents a technical method for flood estimation based on satellite rainfall and satellite rainfall correction method for watersheds lacking measurement data. The study area was the Sebou Watershed, Morocco. The Integrated Flood Analysis System(IFAS) and Grid-based Rainfall-Runoff Model(GRM) were applied to estimate watershed runoff. Daily rainfall from ground gauges and satellite-derived hourly data were used. In the runoff simulation using satellite rainfall data, the composites of the daily gauge rainfall and the hourly satellite data were applied. The Shuttle Radar Topographic Mission Digital Elevation Model(SRTM DEM) with a 90m spatial resolution and 1km resolution data from Global map land cover and United States Food and Agriculture Organization(US FAO) Harmonized World Soil Database(HWSD) were used. Underestimated satellite rainfall data were calibrated using ground gauge data. The simulation results using the revised satellite rainfall data were $5,878{\sim}7,434m^3/s$ and $6,140{\sim}7,437m^3/s$ based on the IFAS and GRM, respectively. The peak discharge during flooding of Sebou River Watershed in 2009~2010 was estimated to range from $5,800m^3/s$ to $7,500m^3/s$. The flood estimations from the two hydrologic models using satellite-derived rainfall data were similar. Therefore, the calibration method using satellite rainfall suggested in this study can be applied to estimate the flood discharge of watersheds lacking observational data.

Assessment of Flood Flow Conveyance for Urban Stream Using XP-SWMM (XP-SWMM을 이용한 도시하천에서의 홍수소통능력 평가)

  • Hong, Jun-Bum;Kim, Byung-Sik;Seoh, Byung-Ha;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.139-150
    • /
    • 2006
  • In recent, increasing of the impervious area gives rise to short concentration time and high peak discharge comparing with natural watershed and it is a cause of urban flood damage. Therefore, we have performed for structural and non-structural plans to reduce the damage from inundation. The Gulpo-cheon basin had been frequently inundated and damaged due to the water level of Han river. So, the Gulpo-cheon floodway was constructed with 20 meters width for flood control in the basin but it was not enough for our expectation and now we have a plan to expand the floodway to 80 meters. We use a XP-SWMM model developed based on EPA-SWMM version for analyzing the capacity of flood conveyance by the expansion of Gulpo-cheon floodway with the same 100 years return period design storm and the same tidal conditions of the Yellow sea. The flood conveyance after the expansion of floodway becomes three times comparing it with before the expansion. Also we simulate the flood discharge at the diversion point of Gulpo-cheon for the expanded condition of floodway and know that the discharge of about 300 m3/sec is flowing backward to the expanded floodway. Therefore we may need some kinds of hydraulic structures to prevent the back water.

A study on the dominant discharge in small and medium-sized stream (Yo-Stream) (중소하천(요천)에서 지배유량 연구)

  • Rim, Chang-Soo;Lee, Joon-Ho
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.2
    • /
    • pp.309-314
    • /
    • 2011
  • The purpose of this study is to select the dominant discharge which mostly affects the formation of the channel shape in Yo-Stream. So far, three different discharge conditions such as bankfull discharge, discharge of a specific recurrence interval, and effective discharge have been considered as an indicator of dominant discharge. Therefore, three different discharge conditions were studied and based on the study results, dominant discharge was selected for Yo-Stream. When comparing bankfull discharge and effective discharge at Beonam stream gaging station, it has turned out that effective discharge was 10 $m^3$/sec, which is 6 times greater than bankfull discharge of 58.83 $m^3$/sec. Furthermore, when comparing bankfull discharge and discharge of a specific recurrence interval, bankfull discharge was quite similar to discharge with recurrence interval of 1.52 years. Previous study results also indicate that dominant discharge occurs with recurrence interval of similar duration. Therefore, discharge of 58.83 $m^3$/sec was considered as a dominant discharge, which corresponds to discharge with recurrence interval of 1.52 years.