• Title/Summary/Keyword: Flood control reservoir

Search Result 180, Processing Time 0.026 seconds

Determination Scheme of Variable Restricted Water Level during Flood Period of Multipurpose Dam (다목적 댐의 홍수기중 가변제한수위 결정 방안)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.709-720
    • /
    • 1997
  • When flood control storage lacks for the reservoir operation of multipurpose dams during flood period, the additional flood control storage should be considered for the flexible use of limited storage capacity. Flood period is divided by meteorological characteristics in this study and the water levels for water demand and flood control are investigated for the divided flood period. Based on the investigations, we suggest the variable restricted water level(VRWL) from the considerations of water conservation and flood control which can determine dam operating water level during flood period. This paper presents an application of the methodology to determination of the VRWL during flood period at the Taechong Dam and the results are discussed.

  • PDF

Prediction of reservoir sedimentation: A case study of Pleikrong Reservoir

  • Thu Hien Nguyen;XuanKhanh Do
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.36-36
    • /
    • 2023
  • Sedimentation is a natural process that occurs in all reservoirs. Sedimentation problem reduces the storage capacity of the reservoir and limits its ability to provide water for various uses, such as irrigation, hydropower generation, and flood control. Therefore, predicting reservoir sedimentation is important for ensuring the efficient operation and sedimentation management of a reservoir and . In this study, the HECRAS model was applied to predict longitudinal distribution of deposited sediment in the Pleikrong reservoir to 2050. Different scenarios was considered: (i) no climate change, (ii) climate change (under two emissions scenarios, RCP4.5 and RCP8.5), and (iii) climate change and land use change (followed land use planning of the watershed). The computation results with different scenarios were analyses and compared. The results show that the reservoir reduced storage volume's rate and sedimentation proceed toward to the dam in the case of climate change is faster than in the case of no climate change. Analyses also indicates that following the land used planning could also improve the long-term problem of the reservoir sedimentation. The outcomes of this study will be helpful for a sustainable plan of sediment management for the Pleikrong reservoir.

  • PDF

Analysis of Flow in the Spillway of Flood Control Reservoir Using CFD Model (CFD 모형을 이용한 홍수조절지 여수로의 흐름해석)

  • Lee, Ho-Jin;An, Sang-Do;Jun, Kye-Won;Son, Yong-Koo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.4
    • /
    • pp.51-57
    • /
    • 2007
  • In this study, the flow in the spillway of Gun-nam flood control reservoir were simulated by using FLOW-3D model. The discharge in the overflow weir and flow stability in approach channel were investigated with the original design plan. The results show that the scale of spillway is unsuitable and the flow in approach channel is unstable. To solve this problem, therefore, the alternative design plan were formulated. The flow in the spillway were simulated with the alternative design plan. The results show that the scale of spillway is suitable and the flow in approach channel is stable.

Experimental Study on the Inflow and Outflow Structures of Hwasun Flood Control Reservoir (화순 홍수조절지의 유입유출 구조물에 대한 수리모형실험 연구)

  • Lee, Sang-Hwa;Jin, Kwang-Ho;Ryu, Jong-Hyun;Kim, Soo-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.7
    • /
    • pp.675-684
    • /
    • 2012
  • Recently, a heavy rainfall under climate change causes the flood exceeded river's conveyance. Flood control methods under the limited river width are the increase of embankment, the construction of storage pockets and diversion channel, the dredging of river bed. Hwasun flood control reservoir of washland is designed as the storage pockets and the regulating gate for the control of water level. In this study, the propriety of design was investigated through hydraulic experiments for the circumstances to exclude the constant flood discharge during operation period. In the results, the over flow rate of side weir exceeded the flow of design and indicated to be able to discharge the designed flow in the regulating gate opened 1.1 m. The high velocity 7.1 m/s behind the gate has investigated to reduce under 3.3 m/s by the baffle block.

Change of Flood Characteristics in the Down Stream of Keum River after the Ken River Estuary Dam Construction (금강하구언 건설후 금강하류의 홍수흐름특성변화)

  • 박승기;문종필;민진우;김태철;안병기
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.41-46
    • /
    • 1998
  • The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.

  • PDF

A Technique of Inland Drainage Control Considering flood Characteristics of the Han River (한강홍수특성을 고려한 내배수 처리기법)

  • Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.1
    • /
    • pp.99-108
    • /
    • 1991
  • Rapid changes of urban hydrologic events need new management operation rule of detention reservoir which is essential outflow control system in urban area. Therefore, this study is to develop the outflow management method of Seoul city considering the Han river flood characteristics, to analyze the inundation of detention reservoir according to variation of design storm patterns, and to examine the safety of gate due to design flood water level. From this study, new operation rule is presented. The design storm patterns are determined by instantaneous intensity method and Huff's quartile method. And the inflow hydrograph of detention reservoir is obtained by applying ILLUDAS model and RRL method. The operation rule of existing drainage pump is designed to have linear relation between storage and pumping discharge. But in this study, it is effective for preventing inundation when the operation rule of drainage pump have Gaussian function which is combined the storage of detention reservoir with its inflow according to increasing or decreasing of inflow hydrograph.

  • PDF

Application of Artificial Intelligence Technology for Dam-Reservoir Operation in Long-Term Solution to Flood and Drought in Upper Mun River Basin

  • Areeya Rittima;JidapaKraisangka;WudhichartSawangphol;YutthanaPhankamolsil;Allan Sriratana Tabucanon;YutthanaTalaluxmana;VarawootVudhivanich
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.30-30
    • /
    • 2023
  • This study aims to establish the multi-reservoir operation system model in the Upper Mun River Basin which includes 5 main dams namely, Mun Bon (MB), Lamchae (LC), Lam Takhong (LTK), Lam Phraphoeng (LPP), and Lower Lam Chiengkrai (LLCK) Dams. The knowledge and AI technology were applied aiming to develop innovative prototype for SMART dam-reservoir operation in future. Two different sorts of reservoir operation system model namely, Fuzzy Logic (FL) and Constraint Programming (CP) as well as the development of rainfall and reservoir inflow prediction models using Machine Learning (ML) technique were made to help specify the right amount of daily reservoir releases for the Royal Irrigation Department (RID). The model could also provide the essential information particularly for the Office of National Water Resource of Thailand (ONWR) to determine the short-term and long-term water resource management plan and strengthen water security against flood and drought in this region. The simulated results of base case scenario for reservoir operation in the Upper Mun from 2008 to 2021 indicated that in the same circumstances, FL and CP models could specify the new release schemes to increase the reservoir water storages at the beginning of dry season of approximately 125.25 and 142.20 MCM per year. This means that supplying the agricultural water to farmers in dry season could be well managed. In other words, water scarcity problem could substantially be moderated at some extent in case of incapability to control the expansion of cultivated area size properly. Moreover, using AI technology to determine the new reservoir release schemes plays important role in reducing the actual volume of water shortfall in the basin although the drought situation at LTK and LLCK Dams were still existed in some periods of time. Meanwhile, considering the predicted inflow and hydrologic factors downstream of 5 main dams by FL model and minimizing the flood volume by CP model could ensure that flood risk was considerably minimized as a result of new release schemes.

  • PDF

A study on the feasibility analysis of the current flood season: a case study of the Yongdam Dam (현행 법정홍수기 타당성 검토 및 개선에 관한 연구: 용담댐 사례)

  • Lee, Jae Hwang;Kim, Gi Joo;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.5
    • /
    • pp.359-369
    • /
    • 2024
  • Korea prepares for potential floods by designating June 21st to September 20th as the flood season. However, many dams in Korea have suffered from extreme floods caused by different climate patterns, as in the case of the longest consecutive rain of 54 days in the 2020's flood season. In this context, various studies have tried to develop novel methodologies to reduce flood damage, but no study has ever dealt with the validity of the current statutory flood season thus far. This study first checked the validity of the current flood season through the observation data in the 21st century and proved that the current flood season does not consider the effects of increasing precipitation trends and the changing regional rainfall characteristics. In order to deal with these limitations, this study suggested seven new alternative flood seasons in the research area. The rigid reservoir operation method (ROM) was used for reservoir simulation, and the long short-term memory (LSTM) model was used to derive predicted inflow. Finally, all alternatives were evaluated based on whether if they exceeded the design discharge of the dam and the design flood of the river. As a result, the floods in the shifted period were reduced by 0.068% and 0.33% in terms of frequency and duration, and the magnitude also decreased by 24.6%, respectively. During this period, the second evaluation method also demonstrated that flood decreased from four to two occurrences. As the result of this study, the authors expect a formal reassessment of the flood season to take place, which will ultimately lead to the preemptive flood response to changing precipitation patterns.

Growth Characteristics and Nutrient Loads of Submerged Plants in Flood Control Reservoir around Juam Lake (주암호 홍수조절지내 침수식물체별 생육특성과 영양염류 부하량)

  • Seo, Young-Jin;Seo, Dong-Cheol;Choi, Ik-Won;Lim, Byung-Jin;Park, Jong-Hwan;Kim, Kap-Soon;Lee, Jun-Bae;Kang, Seok-Jin;Heo, Jong-Soo;Cho, Ju-Sik
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.44 no.5
    • /
    • pp.922-928
    • /
    • 2011
  • In order to properly manage the quality of water in Juam Lake, distributions and growth characteristics of submerged plants in Boknae flood control reservoir were investigated. In addition, the total amount of nutrient load by submerged plants were investigated. The total vegetation area was $1,146,849m^2$ of total flood control reservoirs ($1,848,568m^2$) before flooding. By August 19, all of Boknae flood control reservoir was flooded during rainy season. Dominant plants were MISSA (Miscanthus sacchariflorus), SCPMA (Scirpus fluviatilis) and CRXDM (Carex dimorpholepis) which occupied 87% of all flood control reservoirs. The total amounts of organic matter loads at different submerged plants were great in the order of CRXDM ($501,642kg\;area^{-1}$) > SCPMA ($20,987kg\;area^{-1}$) > MISSA ($3,413kg\;area^{-1}$). The total amounts of nitrogen loads by CRXDM, SCPMA and MISSA under different submerged plants were 56%, 3.9% and 0.8%, respectively. The total amounts of phosphorus loads at different submerged plants were on the order of CRXDM ($1,842kg\;area^{-1}$) > SCPMA ($78kg\;area^{-1}$) > MISSA ($14.8kg\;area^{-1}$). Therefore, the results of this study suggest that organic matter, T-N and T-P in water quality of Juam lake were strongly influenced by submerged plants in flood control reservoir.