In urban area, flood risk is getting higher because of inland flood risk has grown up by changing rainfall intensity, rainfall pattern, changing land use and so on. Urban area is needed higher flood protection level to protect accumulated people, buildings and other infrastructures. However, even though former flood protection has focused on overflow from river, there is not a guide line for evaluating proper flood protection level. Thus, it is necessary to protect flood from inland flooding as well as overflow from river and need a proper method to evaluating flood protection level. This study present a method of determining flood protection elevation by using GIS tools for deciding proper flood protection level. The study result may contribute to urban flood protection measures in which inland flood risk increases.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.3
/
pp.27-32
/
2010
The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown areas and low-lying shores by torrential rain, typhoons and tsunamis. It has, in turn, caused replacement, social and economic costs for blackouts. For activity management regarding flood damage we produced a flood protection system which using the Pad transformer as a basic frame and is developed using pneumatic pressure. We tested safety concerns including insulation resistance and current leakage first for water tank flooding and, second, by an empirical test through supplying 22.9[kV]. We estimate that costs associated with flooding and power failure can be diminished by these advances toward creating a more reliable system.
Journal of the Korean Professional Engineers Association
/
v.35
no.4
/
pp.48-51
/
2002
Due to locally torrential downpours which shows Increasing trend, high tide of the southern sea of Korea and etc. submerged and Inundated districts at the lowlands of Nakdong River Basins has been Increasing year by year In order to protect flood hit, it is necessary to make an early implementation of flood control dam and other flood protection works according to Nakdong River Comprehensive Development Project. In addition to the large scale comprehensive projects, local key measures, such as lowland development control, embankment reinforcement, leakage protection, maintenance and management of facilities, increase in pumping station, will be highly effective.
Kim, Gi-Hyun;Choi, Myeong-Il;Bae, Suk-Myong;Lee, Jae-Yong
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.4
/
pp.78-84
/
2008
Inundation of substation and ground power equipment broke out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation excluding the exchanging cost of equipment, it occurs a great economic and social loss owing to recovery time and events of electric shock occur by inundation electrical facility. So we researched the installation situation of substation and power equipment and inundation loss at Flood Danger Area. And we analyzed refutation or law relating to the flood protection counterplan of US, England Australia. We present flood protection countermeasures by survey and analyzing the internal standard and his paper will be used to resent a reform proposal of electrical feinted law about flood protection.
Park, Tae-Sun;Choi, Min-Ha;Yeo, Chang-Geon;Lee, Seung-Oh
Journal of the Korean Society of Hazard Mitigation
/
v.9
no.5
/
pp.87-92
/
2009
It has been considered only with the concerned regional damage costs whenever the restoration and flood control measures were established in Korea. If the relationship between regional flood frequency and damages is quantitatively analyzed, more resonable and reliable countermeasure for flood protection and restoration can be proposed. Historical data ('70~'07) about flood damage in Korea were utilized and analyzed to present such relationship using the point frequency analysis. Also, the quadrant analysis was employed to divide into 4 categories: high frequency-high damage, high frequency-low damage, low frequency-high damage, and low frequency-low damage. If the results from this study were utilized well in specific cities and counties in Korea, it would be helpful to establish the countermeasures and action plans for flood protection because it was possible to compare with the relationship between flood frequency and damage of each region. And it would be the fundamental data for estimating the effect of future flood protection plan.
Kim, Gi-Hyun;Lee, Sang-Ick;Bae, Seok-Myung;Jung, Chan-Oong;Lee, Jae-Yong
The Transactions of the Korean Institute of Electrical Engineers P
/
v.58
no.1
/
pp.90-94
/
2009
The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. For diminishing flood damage of electrical equipment in the root, flood protection system which is used the basic frame of Pad transformer is developed using pneumatic pressure. This system is established on pressure generator equipment and sensor of flooded level operates at flooding occurrence and is maintained a shutting tightly structure. The system is able to protect indraft water in Pad Transformer and supply the electricity at emergency(flooding). And we tested safety for insulation resistance at flooding and applying an electrical current. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation by setting an example.
Kim Gi-Hyun;Kim Chong-Min;Kim Sun-Gu;Hwang Kwang-Su
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.19
no.4
/
pp.85-90
/
2005
Inundation of Transformer Vault breaks out every summer season in low-tying downtown and low-tying shore by localized heavy rain, typhoon and tidal wave. In case inundation of Transformer Vault, it occurs a great economic loss owing to recovery time and events of electric shock occur by inundation electrical facility. So we need installation plan of Transformer Vault in common flood area for preventing from economic loss and equipment events. Therefore we research distribution of 22.9[kV] Transformer Vault in common flood of the country and analyze field condition about flood protection plan. And we analyze regulation or law relating to the flood protection counterplan of US, England, Australia. This paper will be used to present a reform proposal of electrical related law about flood protection of existing Transformer Vault. Also we present considering facts at the time Transformer Vault installation in common flood area.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.5
/
pp.111-117
/
2008
Recent climate changes have increased flood damage on bank and revetment. However design standard for revetment that is the one of the most important facility for flood protection is not enough in Korea. In this study, destruction of rock revetment in Guryecity caused by the flood on Aug 2007 was inquired by analysis using 2D hydraulic simulation model SMS and the propriety of established plan for protection of rock revetment was evaluated. For this purpose, the ranges of protection facility for revetment was calculated by two methods. The one is normal method to calculate range of pier scour protection facility, and the other is a method of the standard for river design in Korea. The results of both methods are compared to evaluate the established plan.
In this study, water protection reservoir is selected as the target which is located at the estuary of Taehwa river to analyze and examine the effects of hydraulic structure on river environment. This study aims at the definition of factors which cause the change of ecological environment of river due to the effects of the sediment protection reservoir, and the proposal of the direction of environmental friendly river space development through the analysis and examination of stream variation conditions and riverbed variation characteristics among many effects of hydraulic structure on river environment before and after removal of the sediment protection reservoir when design flow is yielded. Firstly, in case of removal the existing sediment protection reservoir, the hydraulic variation characteristics like depth drop due to removal of the sediment protection reservoir are thought of little because it is examined that depths drop with about 0.01m and 0.01~0.56m when low flow is yielded and design flood yielded, respectively. Nextly, as the examination result of the variation characteristics of flow velocity in case of removal the existing sediment protection reservoir, it is thought that the concern about riverbed erosion is not serious according to the analyzed result as the mean velocity of the channel section where the velocity varies in case of removal the sediment protection reservoir is about 0.07~1.36m/s when low flow is yielded, and is about 1.02~2.41m/s when design flood is yielded despite riverbed erosion is concerned as it is examined that flow velocity is getting increase as about 0.01m/s when low flow is yielded and about 0.01~0.44m/s when design flood is yielded. Lastly, from the prediction result of riverbed variation for each flow amount condition before and after removal the sediment protection reservoir, it is known that the variation range of riverbed is nearly constant when flow amount of the channel exceeds a specific limit as it is analyzed that the more flow amount, the more erosion and sediment in the channel section of down stream part of the sediment protection reservoir and the sediment protection reservoir~Samho-gyo, and the variation ranges according to flow amount between flood condition and design flood condition have little difference in the channel section of the upstream of Samho-gyo.
Kim, Gi-Hyun;Choi, Myeong-Il;Bae, Suk-Myong;Lee, Jae-Yong
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2007.11a
/
pp.327-331
/
2007
Inundation of substation and underground power equipment(pad-mounted transformers & switches) breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation of substation and underground power equipment, it occurs a great economic loss owing to recovery time and events of electric shock occur by inundation electrical facility. So we search the damage situation and installation situations. Therefore we propose the necessity of protection of flood at low-lying downtown and low-tying shore. This paper will be used to present a reform proposal of electrical related law about flood protection of existing power equipment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.