• Title/Summary/Keyword: Floating dry dock

Search Result 11, Processing Time 0.014 seconds

Case Study on the Bogie Arrangement of the Load-out System for On-ground Shipbuilding (선박 육상건조를 위한 로드-아웃 시스템의 보기 배치 사례 연구)

  • Hwang, John-Kyu;Ko, Jae-Yong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.1
    • /
    • pp.153-160
    • /
    • 2022
  • This study presents the bogie arrangement of the load-out system for on-ground shipbuilding. The load-out system is one of the most important systems to perform the bogie arrangement of the on-ground shipbuilding technique without dry dock facilities, and this system is composed of four pieces of equipment: bogies, driving bogie with motors, trestles, and power packs. Also, the bogie arrangement analysis (BAA) is employed to simply calculate the reaction forces at the trestle for structural safety. In this context, the purpose of this study is to propose an optimal design method to perform the bogie arrangement satisfying structural safety requirements with minimal cost. It is expected that the proposed methodology will contribute to the effective practice as well as to the improvement of competitive capability for shipbuilding companies at the on-ground shipbuilding stage. Furthermore, we describe some problems and their solutions of the deformation that may occur in the bottom of the hull during the load-out process. As a result, it is shown that we applied it to the 114K crude oil tanker (Minimum bogie 54EA) and the 174K CBM LNG carrier (Minimum bogie 88EA), it can minimize the number of bogie and critical risks (Safety rate 1.61) during the load-out of on-ground shipbuilding. Through this study, the reader will be able to learn successful load-out operation and economic shipbuilding in the future.