Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.4-5
/
2014
Planning earthmoving haul-route must be preceded for appropriate equipment fleet assignment. However, traditional haul-route planning methods have limitations relative to practical usage because multiple variables (e.g., grade/rolling resistance, length, equipment's weight etc.) should be considered at a time. Genetic algorithm(GA) was introduced to improve these traditional methods. However, GA based haul-route planning method still remains in inefficiency relative to computation performance. This study presents a new haul-route searching method that computes an optimal haul-route using GA. The system prototype is developed by using MATLAB(ver. 2008b). The system identifies an optimal haul-route by considering equipment type, soil type, and soil condition.
The writer has attempted in the present article first to investiqate whether shipping industry is poor countries' business more favourable to them, compared to wealthy nations in terms of comparative cost of operation and to analyse how can developing conntries afford to maintain a modern fleet; secondly to examine the economic aspect of the situation created by the UNCTAD V held in May this year, at which passed a resolution demanding "the right of all countries to an equitable participation in the carriage of cargoes generated by their own trade"; and thirdly to adduce conclusions. The article contains six chapters; chapter I is the introduction on the subject under examination; chapter II provides background information on the structure of the industry and of the operating cost of ship; chapter III addresses itself to the legal backgrounds of ensuring free transfer of resources among nations and free competition of shipping; chapter IV deals with the recent development of shipping nationalism of developing countries at the UNCTAD; chapter V discusses division of labour in shipping and in particular the survival mechanism of high-cost countries; and chapter Ⅵ sets forth conclusion.onclusion.
Korea has a systemic problem with lack of engine maintenance, especially among the Commercial Fishing Vessel fleet. This results in a inordinate percent of SAR call-outs for vessels with engine failure. These SAR call-outs lead to a free tow to shore by KCG or by one of its volunteer associates. Although these tows are not a terrible economic burden on KCG, it is a burden in terms of time and resources mis-allocated. This paper proposes a Commercial Fishing Vessel Examination (CFVE) program modeled after the program run by USCG. It is expected that adopting the CFVE program, KCG may be able to create a culture of safety among fishermen; thus, replicating the USCG's success rates.
The convergence of fixed and wireless networks in data communication is providing the necessary driver for M2M commerce to take-off. The opportunities provided by M2M Commerce areonly limited by imagination. Automotive Fleet and Freight, Tolling, Water and Power Metering, Supply Chain Management including Asset Management, Remote Monitoring and Diagnostics, Energy Management and Access Control and Security are among the many M2M applications that are currently getting rolled out. ARC Group expects the worldwide solutions market to be worth in excess of US$ 100 billion by 2007. In addition, operator revenues worldwide from the transport of Telematics data alone will rise from US$ 3.5 billion in 2002 to US$ 78 billion by 2007. This paper discusses some of the lifestyle and business opportunities provided by M2M Commerce in the new ear of network convergence. It also provides some case studies to demonstrate the benefits of M2M Commerce across the supply chain. The key focus of the paper is on achieving enhanced lifestyle, cost reduction, improved profitability and enhanced customer relationship management through M2M Commerce.
In order to widen the radius of electric vehicle (EV) travel recharging points must be provided in sufficient numbers and at convenient places. The cost of providing side an infrastructure is at preset, not well documented and this lack of information acts as a detersent to prospective insestors in EV technology. This paper acts as a preliminancy investigation into the cost of infrastructure is the different situation i.e for the private owner, the fleet owner or for the public. It provides an overview of the items required and this relative costs. Cost will however, vary from country to country and application to application, and this paper two acts purely as guide to the type of equipment and its relative costs.
Bimodal Tram is the newly developed vehicle for both the tracked way and the public road. Its operation system has some characteristics including BIS(bus information system)/BMS(bus management system) based on ITS(intelligent Transportation system) which is used presently in public transportation operation system. One of them is more accurate vehicle fleet control based on both magnetic maker position reference system and GPS(global positioning system) and the other is automatic vehicle control for emergency situations by the Bimodal Tram operation system which will be performed by the unified control and operation center. This paper has investigated the requirements and functional definitions necessary to construct the unified control and operation center for Bimodal Tram operation system which will be more efficient and secure public transportation system than the conventional ones.
To assess the derailment safety of the Samaeul Train, We developed a fleet analysis model and carried out sensitivity analysis of the variables related to derailment factors with ADAMS/Rail computing analysis method. Depending on the variation of the running speed in curve section, derailment coefficient and wheel load reduction rate are high at right side wheels in slow running speed section and low at left side wheel in high running speed. According to decreasing the radius of curve, derailment coefficient and wheel load decreasing rate are increased. Derailment coefficient is proportional to transition curve length and wheel load decreasing rate is constant. Cant value rising causes wheel load deduction rate rising.
This paper considers an integrated inventory-distribution system with a fleet of heterogeneous vehicles employed where a single warehouse distributes a single type of products to many spatially distributed retailers to satisfy their dynamic demands. The problem is to determine order planning at the warehouse, and also vehicle schedules and delivery quantities for the retailers with the objective of minimizing the sum of ordering cost at the warehouse, inventory holding cost at both the warehouse and retailers, and transportation cost. For the problem, we give a Mixed Integer Programming formulation and develop a Lagrangean heuristic procedure for computing lower and upper bounds on the optimal solution value. The Lagrangean dual problem of finding the best Lagrangrean lower bound is solved by subgradient optimization. Computational experiments on randomly generated test problems showed that the suggested algorithm gives relatively good solutions in a reasonable amount of computation time.
In this paper, we present a framework for modeling and control of multiple mobile robots which cowork within a bounded workspace and limited resources. To achieve this goal, we adopt a formalism of discrete event system and supervisory control theory based on Petri nets. We can divide our whole story into two parts: first, we search the shortest path using the distance vector algorithm, and then we construct the control scheme from which a number of mobile robots can work within a bounded workspace without any collision. The use of Petri net modeling allows us In synthesize a controller which achieves a control specification for the desired closed-loop behavior efficiently. Finally, the usefulness of the proposed Petri net formalism is illustrated by a simulation study.
Park, Young-Jun;Lee, Hong-Chul;Li, Xianjun;Lee, Dong-Eun
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.62-63
/
2016
Existing studies relative to enhancing sustainability of earth-work are mainly involved in the performance of construction equipments. They assume that there is no variation of the engine power and fuel consumption and classify the dozer operation into working and idle conditions. They enable to find the most eco-friendly equipment fleet deployment plan. However, they are confined in that they do not provide a measure to assess the sustainability of the operation plan and suggest optimal alternative(s). This paper presents a method that identifies an optimal dozer operation plan that assures sustainability by reducing fuel consumption of the equipment. The method computes the dozer operation productivity using engine-torque-output map provided by equipment manufacturers. Indeed, it identifies the eco-dozing operation that minimizes fuel consumption and maximizes the target productivity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.