• Title/Summary/Keyword: Fixture Design

Search Result 208, Processing Time 0.028 seconds

Structural test of KSLV-I Payload fairing (KSLV-I 페이로드 페어링 구조시험)

  • Lee, Jong-Woong;Kong, Cheol-Won;Eun, Se-Won;Nam, Gi-Won;Jang, Young-Soon;Shim, Jae-Yeul;Lee, Young-Shin
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.11
    • /
    • pp.900-907
    • /
    • 2013
  • Payload fairing(PLF) protects satellites and related equipment from the external environment. They are separated before the satellite separation. Payload fairing made of composite sandwich materials due to their considerable bending stiffness and strength-to-weight ratio. Payload fairing have compression, shear and bending load during the flight. In this study, To check the strength of PLF and connected part, structural test of PLF accomplished using an actuator and a fixture. Purpose of structural test is to verify the strength of PLF in force of separation spring and combination structural load applied. Test result shows that the PLF have an acceptable margin of safety for the combination structural load and force of separation spring.

Posture Analysis of Workers in an Excavator Factory Using 3D Human Simulation (3D 작업자 시뮬레이션을 이용한 굴삭기 생산공정 작업자 자세분석)

  • Moon, Dug-Hee;Baek, Seung-Geun;Zhang, Bing-Lin;Lee, Jun-Seok
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.3
    • /
    • pp.93-101
    • /
    • 2006
  • Recently, work-related musculoskeletal disorders (WMSDs) become a hot issue in the industrial fields. To prevent the potential risk of workers, various approaches have been adopted. One of the approaches is to improve the design of product, that of jig (or fixture) and that of workstation in the early stage of the development. 3D simulation technology is known as the powerful method for detecting such problems before constructing the workstation, because it is possible to evaluate the posture of worker using 3D models in a cyber space. It enables to find the unexpected problems and save the time and cost for redesign and rework. This paper introduces a 3D simulation case study of workers in an excavator factory. 3D models of products, jigs were developed with CATIA. The assembly processes were animated in IGRIP and DPM. Finally the various postures of worker were simulated using Human. As a result, some postures were analysed as the risky jobs and the result of simulation was used to improve the system.

  • PDF

Analysis of the Resonant Characteristics of a Tonpilz Transducer with a Fixed Tail Mass by the Equivalent Circuit Approach (등가회로를 이용한 후면추 고정형 Tonpilz 트랜스듀서의 공진 특성 해석)

  • Kim, Jin-Wook;Kim, Won-Ho;Joh, Chee-Young;Roh, Yong-Rae
    • The Journal of the Acoustical Society of Korea
    • /
    • v.30 no.6
    • /
    • pp.344-352
    • /
    • 2011
  • In this paper, the resonant characteristic of a Tonpilz transducer with a fixed tail mass has been studied by means of an equivalent circuit approach. An equivalent circuit has been designed to describe the characteristic of a Tonpilz transducer that has an additional resonance because of its fixed tail mass. The transmitting voltage response of the transducer calculated by the designed circuit has been compared with that by the FEA (finite element analysis) to confirm the validity of the circuit. This equivalent circuit approach produces identical results with the FEA, in which the variation of resonant frequencies and TVR has been clearly figured out in relation to the stiffness of the mounting fixture and the mass of the tail mass. The suggested equivalent circuit can be utilized to figure out the characteristics of the Tonpilz transducer more efficiently than FEA that requires much calculation time and revision of the models in accordance with the variation of design variables.

Retrospective study of conical connection dental implant (Ankylos dental Implant). (Conical connection 임프란트(Ankylos dental implant)에 대한 후향적 임상연구)

  • Yang, Byoung-Eun;Song, Sang-Hun;Shim, Hye-Won;Lee, Sang-Min;Kim, Seong-Gon
    • The Journal of the Korean dental association
    • /
    • v.44 no.11 s.450
    • /
    • pp.739-747
    • /
    • 2006
  • Objectives. The standardization of connection between fixture and abutment has not been defined. The success of dental implants was not always depends on connection. However, the connection mechanism is one of the most important things for dental implant treatment success. Most implant systems are very comparable in their design and engineering. They share many common characteristics and have similar strengths and weaknesses. Their significant weaknesses are connection, microgap and the resulting micromovement allowing bacterial contamination and bone loss. In the present study, we investigated the clinical performance of Ankylos implant (conical connection implant) Patients and Methods. The clinical performance of conical connection implant was studied under well-controlled clinical conditions. A total of 133 conical connection implants were placed in 50 patients from April 2005 to March 2006. The mean follow-up loading period of implants which was considered successful was 220$\pm$29 days. We recorded the age, sex, installation site, reason of edentulous region, bone density of installation site, diameter and length of dental implants and periods from installation to uncovering surgery using patients medical chart. Results Four Ankylos implants were lost during pre-loading period. 129 implants provided excellent clinical performance during 220$\pm$29 days on an average. The short-term success rate of this conical connection implant system was 96.99%.

  • PDF

Research Trends in Light Guide Plates for LED Backlight Units (LED 백라이트유닛 도광판의 연구동향)

  • Park, So Hee;Choi, Eun Seo;Ahn, Sun Young;Shin, Yong Jin
    • Korean Journal of Optics and Photonics
    • /
    • v.28 no.6
    • /
    • pp.314-326
    • /
    • 2017
  • The display, which is closely related to modern life, is being developed as a window on a network connecting individuals, devices, and even other individuals from simple display devices, as the IT industry develops. To achieve a thinner, brighter unit with less consumption for backlighting, the LED light source has applied, and the study of complex light-guiding plates to improve luminance, uniformity, and viewing angle has been initiated. In this paper, we summarize the research results for the scatterers' pattern formation of the light-guiding plate and the arrangement and composition of the light source, which have enabled remarkable development of the LED backlight unit over the last 10 years. In addition, a large-area flat-screen illumination system, applying the light-guiding-plate technology to a currently noteworthy LED light-fixture design, is outlined. Finally, we discuss the direction and way to develop the current technology more progressively.

Development of Spot Welding and Arc Welding Dual Purpose Robot Automation System (점용접 및 아크용접 겸용 로봇 자동화시스템 개발)

  • Lee, Yong-Joong;Kim, Tae-Won;Lee, Hyung-Woo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.3 no.4
    • /
    • pp.73-80
    • /
    • 2004
  • A dual purpose robot automation system is developed for both arc welding and spot welding by one robot within a cell. The need for automation of both arc welding and spot welding processes is urgent while the production volume is not so big as to accommodate separate station for the two processes. Also, space is too narrow for separate station to be settled down in the factory. A spot welding robot is chosen and the function for arc welding are implemented in-house at cost of advanced functions. For the spot welding, a single pole type gun is used and the robot has to push down the plate to be welded, which causes the robot positioning error. Therefore, position error compensation algorithm is developed. The basic functions for the arc welding processes are implemented using the digital I/O board of robot controller, PLC, and A/D conversion PCB. The weaving pattern is taught in meticulously by manual teach. A fixture unit is also developed for dual purpose. The main aspects of the system is presented in this paper especially in the design and implementation procedure. The signal diagrams and sequence logic diagrams are also included. The outcome of the dual purpose welding cell is the increased productivity and good production stability which is indispensable for production volume prediction. Also, it leads to reduction of manufacturing lead time.

  • PDF

Finite element analysis of stress distribution on supporting bone of cement retained implant by loading location (하중 위치에 따른 시멘트 유지형 임플란트 지지골의 유한요소법 응력 분석)

  • Kim, Kap-Jin
    • Journal of Technologic Dentistry
    • /
    • v.38 no.3
    • /
    • pp.143-149
    • /
    • 2016
  • Purpose: The purpose of this study is to evaluate the effect of two different oblique mechanical loading to occlusal surfaces of cement retained implant on the stress distributions in surrounding bone, using 3-dimensional finite element method. Methods: A 3-dimensional finite element model of a cement retained implant composed of three unit implants, simplified ceramic crown and supporting bone was developed according to the design of ement retained implant for this study. two kinds of surface distributed oblique loads(100 N) are applied to following occlusal surfaces in the single crowns; 1) oblique load on 2 occlusal points(50N for each buccal cusp, 2 buccal cusps exist), 2) oblique load on 4 occlusal points(25N for each buccal and lingual cusp, 2 buccal and 2 lingual cusps exist) Results: The results of the comparison of the stress distributions on surrounding bone are as follows. In the condition of oblique load on 2 occlusal points, VMS was 741.3 Mpa in the M1(Ø$4.0{\times}13mm$) model and 251.2 Mpa in the M2(Ø$5.0{\times}13mm$) model. It means the stress on the supporting bone is decreased. The results of oblique load on 4 occlusal points are similar to this one. Conclusion: Increasing the diameter of the implant fixture is helpful to distribute the stress on the supporting bone. Also, to obtain the structural stability of the supporting bone, it is effective to distribute the load evenly on the occlusal surface of crown in producing single crown implant.

Predicted Performance of the Integrated Artificial Lighting System in Relation to Daylight Levels (채광시스템과 인공조명설비의 통합기술 및 성능평가연구)

  • Kim, G.;Kim, J.T.
    • Journal of the Korean Solar Energy Society
    • /
    • v.22 no.3
    • /
    • pp.47-56
    • /
    • 2002
  • The office is an excellent candidate for implementing daylighting techniques because of the relatively high electric lighting power densities and long daytime use pattern. The quantity of light available for a space can be translated in term of the amount of energy savings through a process of a building energy simulation. To get significant energy savings in general illumination, the electric lighting system must be incorporated with a daylight - activated dimmer control. A prototype configuration of an office interior has been established and the integration between the building envelope and lighting and HVAC systems is evaluated based on computer modeling of a lighting control facility. First of all, an energy-efficient luminaire system is designed for both a totally open-plan office interior and a partitioned office. A lighting design and analysis program, Lumen-Micro 2000 predicts the optimal layout of a conventional fluorescent lighting fixture to meet the designed lighting level and calculates unit power density, which translates the demanded amount of electric lighting energy. A dimming control system integrated with the contribution of daylighting has been applied to the operating of the artificial lighting. Annual cooling load due to lighting and the projecting saving amount of cooling load due to daylighting under overcast diffuse sky are evaluated by a computer software, ENER-Win. In brief, the results from building energy simulation with measured daylight illumination levels and the performance of lighting control system indicate that daylighting can save over 70 percent of the required energy for general illumination in the perimeter zones through the year. A 25 % of electric energy for cooling may be saved by dimming and turning off the luminaires in the perimeter zones.

On the Development of Spot and ARC Welding Dual-Purpose Robot System (스포트 및 아크 용접 겸용 로보트 시스템의 개발)

  • Ryuh, B.S.;Lee, Y.J.;Lee, Y.B.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.6
    • /
    • pp.13-19
    • /
    • 1995
  • A dual purpose robot automation system is developed for both arc welding and spot welding by one robot within a cell. The need for automation of both arc welding and spot welding processes is urgent while the production volume is not so big as to accommodate separate stations for the two processes. Also, space is too narrow for separate stations to be settled down in the factory. A spot welding robot is chosen and the functions for arc welding are implemented in-house at cost of advanced functions. For the spot welding, a single pole type gun is used and the robot has to push down the plate to be wolded, which causes the robot positioning error. Therefore, position error compensation algorithm is developed. The basic functions for the arc welding processes are implemented using the digital I/O board of robot controller, PLC, and A/D conversion PCB. The weaving pattern is taught in meticulously by manual teach. A fixture unit is also developed for dual purpose. The main aspects of the system is presented in this paper especially in the design and implementation procedure. The signal diagrams and sequence logic diagrams are also included. The outcome of the dual purpose welding cell is the increased productivity and good production stability which is indispensable for production volume prediction. Also, it leads to reduction of manufacturing lead time.

  • PDF

Structural Performance of the Cast-in-place Anchor in Cracked Concrete used in Power Plant Facilities (균열 콘크리트에 매립된 발전설비 현장설치용 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jung, Woo-young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.7
    • /
    • pp.120-128
    • /
    • 2019
  • It is very important to verify the seismic performance and stability of the power plant fixture in the domestic power plant, because earthquakes have increased in frequency around the world which resulted in the frequent occurrence of power plant damage caused by the failure of electric power facilities. In this study, through the on-site inspection of power plant fixation unit installed in domestic power plants, we carried out structural performance evaluation of the fixation unit anchor bolts installed on the concrete slabs. The field survey showed M12 J hook anchor bolts were used. Anchor bolt pullout and shear performance evaluation were performed based on ASTM E 488-96 standard. Moreover, artificial crack with the width of 0.5 mm was applied during the experiment based on ATM355.4 and ETAG 001. The comparison of M12 J hook anchor bolt pullout and shear test result to design value required in domestic and international design standard, show a satisfactory result. M12 J hook anchor pullout and shear performance was found to be about 35% and 7%, respectively, higher than the required design value.