• Title/Summary/Keyword: Fire Scheduling

Search Result 14, Processing Time 0.018 seconds

Reflection Noise Rejection of Ultrasonic Sensor using Scheduling Firing Method (계획송신방법에 의한 초음파 반사노이즈 제거)

  • Jin, Tae-Seok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.1
    • /
    • pp.41-47
    • /
    • 2012
  • In this paper, we proposed a new method which analyzes and eliminates errors occurring by multi-reflection of ultrasonic firing in mobile robot application. This new method allows ultrasonic sensors to fire at rates that are three times faster than those customary in conventional applications readings due to ultrasonic noise disturbance. It is possible them to collect and predict sensor data much faster than conventional methods. Furthermore, this method's capability allows mobile robot to navigate in a complex and unknown environment and to collaborate in the same environment with multiple mobile robot, even if their ultrasonic sensors operate. And it's usefulness to avoid moving obstacles by capability of rapid collecting data. Finally, we present experimental results that demonstrate the performances of the new proposed method by experiments in a multi-reflective environment.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Design and Implementation of Beacon based Wireless Sensor Network for Realtime Safety Monitoring in Subway Stations (지하철 역사에서 실시간 안전 모니터링 위한 비컨 기반의 무선 센서 네트워크 설계 및 구현)

  • Kim, Young-Duk;Kang, Won-Seok;An, Jin-Ung;Lee, Dong-Ha;Yu, Jae-Hwang
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.4
    • /
    • pp.364-370
    • /
    • 2008
  • In this paper, we proposed new sensor network architecture with autonomous robots based on beacon mode and implemented real time monitoring system in real test-bed environment. The proposed scheme offers beacon based real-time scheduling for reliable association process with parent nodes and dynamically assigns network address by using NAA (Next Address Assignment) mechanism. For the large scale multi-sensor processing, our real-time monitoring system accomplished the intelligent database processing, which can generate not only the alert messages to the civilians but also process various sensing data such as fire, air, temperature and etc. Moreover, we also developed mobile robot which can support network mobility. Though the performance evaluation by using real test-bed system, we illustrate that our proposed system demonstrates promising performance for emergence monitoring systems.