• Title/Summary/Keyword: Fire Power Potential

Search Result 41, Processing Time 0.028 seconds

Algorithms for Fire Sequencing Problem in Unplanned Artillery Attack Operation (포병부대 비계획 사격순서 결정 알고리즘)

  • Choi, Yong-Baek;Kim, Kyung-Sup
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.2
    • /
    • pp.37-44
    • /
    • 2012
  • This paper focuses on scheduling problems arising in the military. In planned artillery attack operations, a large number of threatening enemy targets should be destroyed to minimize fatal loss to the friendly forces. We consider a situation in which the number of available weapons is smaller than the number of targets. Therefore it is required to develop a new sequencing algorithm for the unplanned artillery attack operation. The objective is to minimize the total loss to the friendly forces from the targets, which is expressed as a function of the fire power potential, after artillery attack operations are finished. We develop an algorithm considering the fire power potential and the time required to destroy the targets. The algorithms suggested in this paper can be used in real artillery attack operations if they are modified slightly to cope with the practical situations.

EMC Safety Margin Verification for GEO-KOMPSAT Pyrotechnic Systems

  • Koo, Ja-Chun
    • International Journal of Aerospace System Engineering
    • /
    • v.9 no.1
    • /
    • pp.1-15
    • /
    • 2022
  • Pyrotechnic initiators provide a source of pyrotechnic energy used to initiate a variety of space mechanisms. Pyrotechnic systems build in electromagnetic environment that may lead to critical or catastrophic hazards. Special precautions are need to prevent a pulse large enough to trigger the initiator from appearing in the pyrotechnic firing circuits at any but the desired time. The EMC verification shall be shown by analysis or test that the pyrotechnic systems meets the requirements of inadvertent activation. The MIL-STD-1576 and two range safeties, AFSPC and CSG, require the safety margin for electromagnetic potential hazards to pyrotechnic systems to a level at least 20 dB below the maximum no-fire power of the EED. The PC23 is equivalent to NASA standard initiator and the 1EPWH100 squib is ESA standard initiator. This paper verifies the two safety margins for electromagnetic potential hazards. The first is verified by analyzing against a RF power. The second is verified by testing against a DC current. The EMC safety margin requirement against RF power has been demonstrated through the electric field coupling analysis in differential mode with 21 dB both PC23 and 1EPWH100, and in common mode with 58 dB for PC23 and 48 dB for 1EPWH100 against the maximum no-fire power of the EED. Also, the EMC safety margin requirement against DC current has been demonstrated through the electrical isolation test for the pyrotechnic firing circuits with greater than 20 dB below the maximum no-fire current of the EED.

A Study on Validation Methodology of Fire Retardant Performance for Cables in Nuclear Power Plants (원자력발전소 케이블 난연성능 검증 방법론 개선을 위한 연구)

  • Lee, Sang Kyu;Moon, Young Seob;Yoo, Seong Yeon
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.1
    • /
    • pp.140-144
    • /
    • 2017
  • Fire protection for nuclear power plants should be designed according to the concept of "Defense in Depth" to achieve the reactor safety shutdown. This concept focuses on fire prevention, fire suppression and safe shutdown. Fire prevention is the first line of "Defense in Depth" and the licensee should establish administrative measures to minimize the potential for fire to occur. Administrative measures should include procedures to control handling and use of combustibles. Electrical cables is the major contributor of fire loads in nuclear power plants, therefore electrical cables should be fire retardant. Electrical cables installed in nuclear power plants should pass the flame test in IEEE-383 standard in accordance with NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants". To assure the fire retardant of electrical cables during design life, both aged and unaged cable specimens should be tested in accordance with IEEE-383. It can be generally thought that the flammability of electrical cables has been increased by wearing as time passed, however the results from fire retardant tests performed in U.S.A and Korea indicate the inconsistent tendency of aging and consequential decrease in flammability. In this study, it is expected that the effective methodology for validation of fire retardant performance would be identified through the review of the results from fire retardant tests.

A Study on the Needs to Improve the Regulations and the Design Features of Fire Protection for UAE Nuclear Power Plants (UAE원전 화재방호계통 설계특성과 화재방호규제 개선 필요성 연구)

  • Ma, Jin-Soo;Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.25 no.5
    • /
    • pp.54-61
    • /
    • 2011
  • The study is to analysis of fire protection regulations for the nuclear power plants (NPP) in the United States, Japan, the UAE (United Arab Emirates), and Korea with the intention of exporting NPP to the UAE. Fire protection regulations for NPP for these countries permit the fire protection design and facilities in accordance with the evaluation of the potential fire hazards. However, in Korea, the NPP is a part of power generation facilities in Korea fire protection law, and the atomic energy act classifies them as the reactor and related nuclear facilities. The fire protection law and atomic energy act are different to the criteria for the fire protection of NPP. To maintain the leading position as a nuclear exporting country, the performance-based fire hazard analysis should be reasonably incorporated in the design of the fire protection system. It was suggested that the integrated requirements of the fire protection for NPP should be incorporated to the construction article for the fire protection facilities specified in paragraph 2 of Act II, being classified into the special objects to be protected against fire, which requires a performance-based design in order to incorporate the specific requirements for NPP.

EVALUATION OF AN ACCIDENT MANAGEMENT STRATEGY OF EMERGENCY WATER INJECTION USING FIRE ENGINES IN A TYPICAL PRESSURIZED WATER REACTOR

  • PARK, SOO-YONG;AHN, KWANG-IL
    • Nuclear Engineering and Technology
    • /
    • v.47 no.6
    • /
    • pp.719-728
    • /
    • 2015
  • Following the Fukushima accident, a special safety inspection was conducted in Korea. The inspection results show that Korean nuclear power plants have no imminent risk for expected maximum potential earthquake or coastal flooding. However long- and short-term safety improvements do need to be implemented. One of the measures to increase the mitigation capability during a prolonged station blackout (SBO) accident is installing injection flow paths to provide emergency cooling water of external sources using fire engines to the steam generators or reactor cooling systems. This paper illustrates an evaluation of the effectiveness of external cooling water injection strategies using fire trucks during a potential extended SBO accident in a 1,000 MWe pressurized water reactor. With regard to the effectiveness of external cooling water injection strategies using fire engines, the strategies are judged to be very feasible for a long-term SBO, but are not likely to be effective for a short-term SBO.

A Study on Fire Investigation Technique For Single Line to Ground Faults in Distribution Line Using EMTP Simulation (EMTP 시뮬레이션을 통한 배전선로의 1선 지락 사고시 화재 조사 기법에 관한 연구)

  • Yoo, Jeong Hyun;Kim, Hie Sik;Lee, Hoon Gi;Cho, Yong Sun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.3
    • /
    • pp.21-26
    • /
    • 2018
  • Approximately 20% of the total fire is electrical fire, and electrical energy is a potential source of heat. Large-scale fault currents that occur during a line ground fault flow into electric utility poles, electric power equipment, or electric appliances of the customer, and cause simultaneous electrical fire. In this paper, we investigated the possibility of fire through the change of fault current flowing in faulty and sound feeder in case of 1 line ground fault in 22.9 kV distribution line. We propose a fire investigation analysis method for simultaneous multiple electrical fire such as evidence analysis method, and fault current occurrence confirmation method in case of fire accident by analyzing the fault current occurring in the ground fault in the distribution line using EMTP, electric power system analysis program.

Implementation of a Inference based Intelligent Distribution Panel System for Prevention and fast Detection of fire caused by Electricity (전기화재 예방과 신속 감지를 위한 추론기반 지능형 수배전반 시스템 구현 연구)

  • Park, Chan-Eom;Kim, Kyung-Dong;Lee, Seung-Chul;Yang, Won-Young
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.82-85
    • /
    • 2006
  • With the fast growing number of skyscrapers and large ultrahigh apartment complexes, the concerns on fire caused by electricity also grow. Among about 30,000 fires recorded annually, roughly one third of them are hewn to be caused by electricity. If one of such high and densely populated buildings or apartments catches a fire, the consequence can potentially be quite catastrophic. However, with the rapid development of the techniques in the fields of communications and computers, electric power distribution systems for such buildings and apartments have been largely digitalized in recent years. More detailed informations on the operating status are now available, which enables more sophisticated monitoring and early detection of potential fire caused by electricity. In this paper, we present an inference technique that can be used as one of the basic techniques in building intelligent distribution panel systems that can effectively monitor, prevent and detect the occurrence of fire caused by electricity. The technique can accommodate production rules in linguistic expressions on high abstraction levels. Fire finding strategies can be easily modified to provide more effective countermeasures. Simulation results show that inference capabilities and thus the capability of fire monitoring in power distribution panel systems can be significantly enhanced with our approach.

  • PDF

A Study on the Development of the Weapon System Effectiveness Indices (I) (한국적 무기체계 효과지수 개발에 관한 연구 (I) -무기체계 효과측정 방법론-)

  • Min, Kye-Ryo;Park, Kyung-Soo
    • Journal of the military operations research society of Korea
    • /
    • v.5 no.1
    • /
    • pp.123-135
    • /
    • 1979
  • Weapon System effectiveness indices are a key factor to the cost-effectiveness analysis in the process of allocating national resources in an optimal fashion. First part of this paper reviews the need of weapon -effectiveness indices, historical development of methodologies on military strength evaluation with various models of indices, and the interrelation-ship between weapon effectiveness indices and war-game. Second part of this paper analyzes the concepts and usage of the already developed methodologies, i .e., index of power, weapon lethality index (W.L.I.), index of fire power potential (I.F.P), fire power potential (F. P. P), and weapon effectiveness indices/weighted unit value (W. E. I/W. U. V.). Finally, weaknesses and limits of these methodologies are compared and evaluated. Result of this research shows that the W. L. I, I. F. P, and F. P. P seem to possess many non-scientific or ambiguous facets, but the W. E. I/W. U. V method produces more detailed, inclusive, and reasonable indices. The paper concludes with the emphasis on the importance of the provision of the theoretical bases to develop effectiveness indices which can be used to evaluate Korean weapon systems, and the early establishment of a specialized research group to manage and develop methodologies on the weapon effectiveness indices.

  • PDF

A Study on Investigation Method of the Electric Fire Scene Caused by Lightning (낙뢰로 인한 전기화재의 현장조사기법 연구)

  • Song, Jae-Yong;Sa, Seung-Hun;Nam, Jung-Woo;Kim, Jin-Pyo;Park, Nam-Kyu
    • Fire Science and Engineering
    • /
    • v.25 no.1
    • /
    • pp.50-56
    • /
    • 2011
  • In recently years, occurrences of lightning return strokes have been increased by global worming effect and intensity of lightning impulse voltage and current accompanied by lightning discharges has being strengthening. In Korea, 560 thousand lightning discharges happened in 200S. According to the increasing frequencies of lightning, human deaths and damages to the structure have been increased steadily. Electric fire caused by lightning return strokes due to the breakdown between power line and ground line from the ground potential rise on a process of the lightning impulse current through to the ground. The damages of lightning were occurring at same time in the neighboring areas of the lightning point. In order to protect from the lightning stroke, we made a suggestion to use protection devices and equipotential bonding at the dangerous areas. The analysis results of electric fires caused by lightning would be utilized to investigate and to find accurate fire cause in the fire scenes.

The Recommendation on Power Saving through the Measuring of the Standby Power of OA Equipments (OA기기의 대기전력 측정을 통한 절전 평가 제안)

  • Kim, Man-Geon;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.161-167
    • /
    • 2013
  • The purpose of this study was to assess power loss in the computer and office automation equipment and identified a way to save power consumptions through field measurement. In this study, the meaning of standby power was to consume power while waiting for the use of any electronic equipment. This standby consumption was about 11% of total power consumption even though we did not seriously realize it. Therefore, it was very important to measure accurate power consumption at the standby status of electronic equipment. In addition, it also helped to reduce potential risks of electricity associated disasters. This study proposed the way to reduce power losses through automatic turn off switches for power outlets and switches. Finally, this study can evaluate power consumption patterns that can reduce power consumptions and potential risks of power related disasters. This also can achieve the goals of sustainability that can reduce environmental impacts by lowering energy consumptions and greenhouse gas emissions.