• Title/Summary/Keyword: Fill slope

Search Result 78, Processing Time 0.022 seconds

Analysis of Soil Bailed Wall under Piled Bridge Abutment (교대하부 도로확장에 적용된 쏘일네일 벽체의 해석)

  • Im, Yu-Jin
    • The Journal of Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.83-96
    • /
    • 2004
  • A soil mailed wall is adapted as road widening measure and is constructed under a miniature abutment built on steel pipe piles. The soil nailed wall called for removal of the existing embankment slope to permanently retain the fill behind the abutment. The soil nailed wall is fully instrumented and is monitored. A 3D finite element analysis is used to study further the behavior of the soil nailed wall. The complete sequence of construction is simulated. The numerical model is calibrated against the instrumented nailed wall. Then a parametric study is conducted. The results provide valuable information related to the effect of the excavation and nailing on the following: axial load and bending moment in the piles, load in the nails, and wall deflections.

  • PDF

Analysis of the Effectiveness of Simplified Slope Stabilization Methods for the Continuous Utilization of Skid Trails (산림작업로의 지속적 활용을 위한 간이 사면안정처리 효과분석)

  • Lee, Kwan-Hee;Hwang, Jin-Seong;Ji, Byoung-Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.4
    • /
    • pp.582-591
    • /
    • 2019
  • This study was conducted to develop low-cost, simplified slope stabilization methods for the continuous utilization of skid trails, and to analyze the effect of the developed methods. Slope stabilization methods were created on the fill slopes of skid trails in the Forest Technology and Management Research Center of the National Institute of Forest Science.We measured the settlement and bearing capacity of skid trail surfaces, and the displacement of slope stabilization methods with respect to the number of passes (maximum 100 passes) by a logging truck weighing 17 tons. The constancy of slope stabilization methods was determined by measuring displacement of the stabilization structure with respect to the number of logging truck passes. Results showed that the bearing capacity in most cases was insufficient, but that the settlement of skid trails was less than 150 mm, which was considered reasonable. In addition, the stability of root staking wallswas somewhat low, but the average displacements of all slope stabilization methods were generally around 20 mm or less, indicating no issues regarding structural stability. By applying the simplified stabilization methods to skid trail maintenance following timber harvesting, efficient timber harvesting can be achieved. Additionally, these methods can be utilized as permanent forest management infrastructures and complement insufficient forest road facilities.

A Case Study on the Slope Collapse and Reinforcement Method of the Phyllite Slope (천매암 지역에서의 비탈면 붕괴 원인규명 및 보강대책 사례연구)

  • Cho, Younghun;Lim, Daesung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.8
    • /
    • pp.83-93
    • /
    • 2010
  • The purpose of this study is to present emergency rehabilitation, cause and the countermeasure of reinforcement about reinforced retaining wall and the slope collapse of the phyllite ground. The study area is broken easily because this area has rock mass discontinuity such as stratification, foliation, joint and fold. And this area consists of the ground where it happens easily to the failure of structure like reinforced retaining wall because of the phyllite ground sensitive to weathering. Counterweight fill in front of reinforced retaining wall was performed as emergency rehabilitation about displacement of reinforced retaining wall and the failure at the rear of slope on phyllite ground. After that, additional displacement didn't occur. Boring and geophysical exploration were launched to present emergency rehabilitation and develop the long-term method of reinforcement. This could grasp anticipated range of the failure section and identify internal and external factors of the cause of the slope collapse. Several methods of reinforcement were suggested by conducting the numerical analysis. When conducting design and construction of major structures at the ground which has complex discontinuities, the precise site investigation should be conducted. During construction, immediate action for over-displacement should be taken by performing the periodic measurement.

USE OF FIBREDRAIN IN DREDGED CLAY RECLAMATION PROJECT

  • Lee, S.L.;Yong, K.Y.;Soehoed A R
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.11a
    • /
    • pp.96-109
    • /
    • 2001
  • Land was reclaimed at the waterfront in the Pluit area of Jakarta for a 90ha residential-cum-recreational development. The reclamation works involve construction of permanent and temporary dykes, fill placement, soil improvement, dredging of internal canals and marina, and construction of canal revetment. The site lies on 16m to 18m thick soft seabed deposits. Settlement of the reclaimed areas will result as a consequence of consolidation of the soft underlying sediments. In order to reduce post-construction settlement to within acceptable levels, a system of vertical drains and preloading was adopted. This paper describes the use of Fibredrain, a prefabricated vertical drain made of jute and coir fibres developed at the National University of Singapore, in the soil improvement works and a secondary use in the construction of perimeter dykes for the reclamation works. The construction of the perimeter dyke must be carried out in such a way that slope stability is on ensured. Bamboo rafts and bamboo clusters with Fibredrain inserted, and stage construction were employed to improve stability during the dyke formation for the Pantai Mutiara project.

  • PDF

A Study on the Face Slab Deformation of Concrete Faced Rockfill Dams During Initial Impoundment (초기 담수 중 콘크리트 표면차수벽형 석괴댐의 슬래브 거동에 관한 연구)

  • Won, Myoung Soo;Kim, Hyeong Joo;Jung, Young Chae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.129-139
    • /
    • 2015
  • Concrete-Face Rock-Fill Dams (CFRDs) are rock-fill dams with watertight-concrete slabs on its upstream slope instead of its central earth cores. The design for CFRDs are still largely empirical and typically based on past experiences. This paper presents a description of the concrete face slabs and leakage behaviors of two post-constructed CFRDs based on the data gathered through instrumentation during the initial impoundment. The results show that the strain on the concrete face slab and the horizontal displacements of the vertical slab joints are slightly affected by both the seasonal temperature change and water loading during the initial impoundment. The deformation of perimetric joints are less affected by the temperature change, however it is significantly affected by the water loading during the initial impoundment. The leakage rate is significantly affected by the hydrostatic load and the deformation of the perimetric joints.

Deformation Behavior of Existing Concrete-Faced Rockfill Dam due to Raising (증고에 따른 기존 CFRD 댐체의 변형거동)

  • Shin, Donghoon;Cho, Sungeun;Jeon, Jesung;Lee, Jongwook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.77-83
    • /
    • 2007
  • In this study, deformation behavior of existing concrete face rockfill dam, which is raised to a certain height to enhance storage capacity or to improve hydraulic and hydrologic stability, is examined using numerical analysis method. The results obtained from FEM analysis show a possibility that additional fill at downstram slope of existing CFRD dam body may lead undesirable deformations and stresses in existing dam body, especially in face concrete, such as settlements in upper part and bulging in lower part, excessive bending moments, and eventualy tensile cracks. Therefore, in designing multi-staged raising construction of CFRD, it is essential to consider deformations and stresses to be developed within and between exisiting dam body and added parts due to additional fill, and to prepare a proper measure to prevent abnormal deformations and stresses in the dam body including added parts.

  • PDF

Pullout Characteristics of Pressure Reinjection-Grouted Reinforcements in Clay (점성토 지반에 설치된 압력재주입 그라우팅 보강재의 인발특성)

  • Seo, Jungwon;Kim, Nara;Lee, Bongjik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.9
    • /
    • pp.83-89
    • /
    • 2012
  • Anchor, soil nail and micropile have been widely used for slope reinforcement and foundation. These all methods need grouting work after placing reinforcing member. The pressure injection-grouting techniques helps to increase the bearing capacity of reinforcing member by enhancing larger effective pile diameter and increasing the radial stresses acting on the grout body and causing irregular surface. However, the pressure reinjection-grouting techniques is not commonly used because grouting equipment and practical application example are short and the verification of reinforcing effect is difficult. In this study, the laboratory test was performed to evaluate the reinforcing effect with variation of grouting methods in clay. As a result of the test, the pressure reinjection-grouting techniques showed that the pullout capacity of reinforcing member increased up to 1.22~2.61 times comparing to the gravity fill techniques.

Pullout Characteristics of Reinforcing Body Using Pressure Re-injection Grouting Method (압력재주입 그라우팅 방식을 이용한 보강재의 인발특성)

  • Lee, Bongjik;Kim, Sangsu;Youn, Junsik;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.10
    • /
    • pp.25-31
    • /
    • 2010
  • Anchor, soil nail, micropile have been widely used for slope reinforcement and foundation. These all methods need grouting work after placing reinforcing member. In domestic case, gravity fill techniques and pressure grouting techniques are mainly used. In contrast the pressure re-injection grouting method is not commonly used because grouting equipment and lack of practical application example is short and the verification of reinforcing effect is difficult. Pressure re-injection grouting is a kind of post grouting which technique increases the radial stresses acting on the grout body and causes irregular surface to be developed around bond length that tends to interlock the grout and the ground. In this study, the field test was performed to evaluate the reinforcing effect with the variation of grouting methods and pullout characteristics of reinforcing member placed by pressure re-injection grouting method. The test results showed that the post-grouting methods were useful to increase the pullout capacity.

A Case Study of Soil-Cement Fill for Tunneling (소일시멘트 복토후 터널굴착에 대한 사례 연구)

  • Shin Il-Jae;Kang Jun-Ho;Suh Young-Ho
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.359-368
    • /
    • 2005
  • In case the overburden of a tunnel is too low to adopt NATM, cut and cover method generally can be chosen as alternative. However, in tunneling some area with very low or no overburden between two mountains, the cut and cover method requires additional construction of a couple of tunnel portals and the maintenance of portal slopes until backfilling is completed. As a solution for this problem, increasing the tunnel overburden by raising the ground level can be effective. This paper presents the case study for tunneling at C240 site in Taiwan High Speed Railway(THSR) in which soil-cement filling method was used for pre-banking before tunnel excavation. Cement content of filling material was $2\~4\%$ and thickness of filling a round was $130\~250\;mm$. The stability evaluation for the soil-cement slope and concrete lining of low cover tunnel was conducted by numerical analysis.

Numerical Analysis of Relief Well Effect for Seepage Control of Small Fill Dam (소규모 필댐의 침투수 관리를 위한 감압정 효과에 대한 수치해석)

  • Chang, Jaehoon;Yoo, Chanho;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.2
    • /
    • pp.5-13
    • /
    • 2020
  • The relief wells have been studied to be effective in seepage control in small dams such as agricultural dams. However, quantitative studies on the effects of the relief well are rare and there is no design standard also. To quantitatively analyze the effects of the seepage control in small dams, the research of up-lift pressure influencing the toe of dam body was conducted by seepage analysis, which investigates the behavior characteristics, according to the conditions of dam and foundation. The effect of seepage control was studied by analyzing the reduction effect of up-lift pressure at foundation ground of the toe of downstream dam slope depending on the installation of the relief well. As a result, it was found that the relief wells are effective in reducing the pore water pressure in the foundation, which can cause piping and sliding failure.