Agrophotovoltaic (APV) system is an integrated system producing crops as well as solar energy. Because crop production underneath Photovoltaic (PV) modules requires delicate management of crops, smart farming equipment such as real-time remote monitoring sensors (e.g., soil moisture sensors) and micro-climate monitoring sensors (e.g., thermometers and irradiance sensors) is installed in the APV system. This study aims at introducing a decision support system (DSS) for smart farming in an APV system. The proposed DSS is devised to provide a mobile application service, satellite image processing, real-time data monitoring, and performance estimation. Particularly, the real-time monitoring data is used as an input of the DSS system for performance estimation of an APV system in terms of production yields of crops and monetary benefit so that a data-driven function is implemented in the proposed system. The proposed DSS is validated with field data collected from an actual APV system at the Jeollanamdo Agricultural Research and Extension Services in South Korea. As a result, farmers and engineers enable to efficiently produce solar energy without causing harmful impact on regular crop production underneath PV modules. In addition, the proposed system will contribute to enhancement of the smart farming technology in the field of agriculture.
The 4th Industrial Revolution and the continuous development of Science and Technology have also required a speedy business promotion method in the defense industry. Advanced countries including the United States are already boldly innovating the existing high-cost and long-term acquisition system with the highest priority in weapons development to cope with the military rise of Russia and China. The Ministry of National Defense and the Defense Acquisition Program Administration have also recently introduced a quick acquisition system and are applying it to business promotion. In addition, some small-scale projects and weapons systems are being reorganized so that they can be managed by the units demanding them. After an organizational diagnosis of the Project Acquisition Group by the Ministry of National Defense in 2020, it has been reassigned as a subordinate unit of the Army Logistics Command from a direct unit managed by the Army HQ. As a result, problems such as work conflict or redundancy have been identified. In addition, a system has been implemented to shorten the acquisition period by applying a rapid acquisition program in the field of weapons systems by benchmarking the rapid acquisition program of advanced countries. The force support system project process will also need to introduce such a quick acquisition system. In addition, the Ministry of National Defense is considering ways to delegate some weapon systems to each military, which will then carry out tasks ranging from requirements determination to project management. Accordingly, it is now time to expand the organization for the management of the Army's weapons system acquisition project. Therefore, in this paper, the Army Project Acquisition Group was analyzed on its organization, acquisition procedures, and cooperation systems, with presentations of development plans for each field.
Rapid prototyping (RP) technologies are mainly performed by layered manufacturing (LM) process which manufactures 3D physical objects by depositing 2D sections in a direction. Thus, deformations are apt to occur in overhanging area of the RP processed part. Also, excessive adhesion between part and platform of the RP apparatus is generated. In order to prevent these problems, most of the RP technologies adopt support structure. Main element to support a part in the support structure is strand. In actual field, however, the number of strand is determined by the software operating reference guide or RP system operator's experience. In this paper, a methodology to determine the optimal strand spacing is presented through experiments and measurements for the SL part deformation by change of strand spacing and part weight in the support structure of the stereolithography.
본 연구는 재난현장에서 실시간으로 발생하는 정보들을 신속하게 수집·분석하여 정확한 재난현장상황파악과 의사결정을 지원할 수 있는 현장지원시스템의 통합방안을 제안하고, 프로토타입 시뮬레이션을 통해 현장 적용성을 검토하는 것에 그 목적이 있다. 이를 위해 재난현장에서 활용 할 수 있는 정보수집·공유·융합 기술에 대해 검토하였으며, 재난관리 전단계에 필요한 정보자원과 정보의 효율적인 흐름을 만들어낼 수 있는 스마트 재난현장지원시스템의 통합방안에 대해 제시하였다. 이를 기반으로 제작된 프로토타입으로 시스템 운용 가능성을 검토하기 위해 풍수해 재난 시나리오를 토대로 시뮬레이션을 진행하였으며, 시스템 내의 다양한 기능들이 정상적으로 구현되어 GIS 상황판에 표출되는 것을 확인하였다. 본 연구를 통해 급변하는 재난환경 속에서 효율적이고 능동적인 재난대응이 가능해질 것이라 기대된다.
Since 1990, Agency for Defense Development is operating the non-magnetic laboratory for the development of key technology for the underwater magnetic stealth part, the research of the magnetic application weapons and the technical support for Korean Navy. Recently, we installed the new three-axis earth magnetic field simulator and the measurement system in the non-magnetic laboratory which is replacing the existing outdated facility. In this paper, we deal with the detailed design result of the earth magnetic field simulator and the measurement system. Also, we describe the effective method to separate the permanent and the induced magnetic field from the measured data for a scaled model ship using the earth magnetic field simulator and the measurement system.
A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.
Currently, in Korea, the number of handicapped children receiving inclusive education in general schools is expanding. In the inclusive education field, the most important tasks are personal needs support, such as toilet assistance, meal assitance, and support for wearing and taking off various assistive devices. A significant portion of the support work in the actual education field is related to clothing. Therefore, it is necessary to research and develop universal fashion designs for handicapped children at school where inclusive education is implemented. To achieve this aim, this study analyzed the concepts, principles and, characteristics of universal fashion design through theoretical research and established research principles. In this study, two fact-finding surveys were conducted. Next, a total of 10 universal fashion designs were proposed considering both the preceding survey results and the principles of universal fashion design Among them, the four designs that were considered most suitable were selected for universal fashion design through F.G.I (Focus Group Interview) analysis conducted by experts. The four selected designs were made by referring to the size framework based on the '6th Human Body Size Survey Report of Korea'. The completed experimental clothes were proposed as the final universal fashion design for handicapped children by conducting external evaluation through a virtual clothing system and real clothes.
Rao, M. Mohana;Satyanarayana, S.;Kumar, S. Vinay;Jain, H.S.
Journal of Electrical Engineering and Technology
/
제5권4호
/
pp.631-636
/
2010
Gas-insulated transmission lines (GITL) are valued as technological solutions in hydro-power stations due to their enormous power handling capabilities. The performance of GITL is a function of the size of metallic particles inside the gas-insulated chamber. Electrostatic field (E-field) enhancement is a common phenomenon in gas-insulated lines due to these metallic particles. In this study, the E-field enhancement factor is calculated by considering metallic particles at various locations in the gas-insulated line/bus section, such as high-tension (HT) conductor, high-voltage shields, support insulator, and inner surface of grounded enclosure. For this purpose, a two-dimensional model based on finite element (FE) method is developed. The length of the metallic particle is in the range of 1 to 10 mm while the diameter is between 1 to 3 mm. E-field enhancement is also computed for various particle configurations of the gas-insulated system, with focus on dielectric coating made of epoxy on HT conductor and inner surface of grounded enclosure.
A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.
This paper provides a case study of development testing and evaluation of design goal of Interferometric SAS (Synthetic Aperture Sonar) system that is developing supported by Civil-Military Technology Cooperation Center in offshore fields. For Deep water operating capabilities evaluation, We have surveyed candidate field, bathymetric mapping and target identification over 200 m depth, East Sea. In testing phase, We have provided environmental information of testing field include water column, seabed and weather condition in real time. And to compare excellency of developing InSAS, we have gather commercial imaging sonar system data with same target. This case study will support the Test Readiness Review of future underwater surveillance system developing via investigate marine testing field environment, testing facilities and planning.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.