• Title/Summary/Keyword: Field performance test

Search Result 2,054, Processing Time 0.026 seconds

A Characteristic Analysis of High Pressure and High Temperature 3-way Ball Valve (고온.고압용 3-way 볼밸브의 특성해석)

  • Lee, Joon-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.11 no.4
    • /
    • pp.180-184
    • /
    • 2012
  • 3-way ball valves have been mostly used for high temperature/high pressure valves using in petrochemical carriers and oil tankers, which requires high quality products with confidentiality and durability. As a larger disaster may be generated by leakage of oil or gas from valves, thus the present research applied a numerical analysis method with thermal-structural coupled field analysis and the performance test. The Max stress by parts was confirmed through thermal-structural coupled field analysis and develop the 3-way ball valve design, which is safe on operating condition. And its performance was verified by carrying out pressure test, leakage test and durability test for the manufactured 3-way ball valves with satisfying it's regulations.

Structural Performance of an Advanced Compsites Bridge Superstructure for Rapid Installation (급속시공용 복합신소재 교량상부구조의 구조 성능)

  • Ji, Hyo-Seon
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.1 no.1
    • /
    • pp.34-45
    • /
    • 2010
  • This paper describes the design, manufacturing process, testing, application, and assessment of capacity-ratings of the first all advanced composites bridge on a public highway system. In order to verify the bridge design prior to the field application, a sub-scale bridge superstructure was built and tested in the laboratory. The field load test results were compared with those of the finite element analysis for the verification of validity. To investigate its in-service performance, field load testing and visual inspections were conducted under an actual service environment. The paper includes the presentation and discussion for advanced composites bridge capacity rating based on the stress modification coefficients obtained from the test results. The test result indicates that the advanced composites bridge has no structural problems and is structurally performing well in-service as expected. Since these composite materials are new to bridge applications, reliable data is not available for their in-service performance. The results may provide a baseline data for future field advanced composites bridge capacity rating assessments and also serve as part of a long-term performance of advanced composites bridge.

  • PDF

Development of the Hovering AUV test-bed and field test

  • Choi, Hyeung-Sik;Cho, Sohyung;Kim, Joon-Young
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.2 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • This paper describes the design and performance of a hovering AUV constructed at KMOU (Korea Maritime and Ocean University). Before the field test, we analyzed the dynamic performance of the AUV using a simulation program made by Matlab & Simulink. Also, a PID controller was designed to control the thrusters. Using 4 thrusters (2 vertical and 2 horizontal), the AUV could be controlled using dynamic motion with 4-DOF. A simulation and field test were conducted with way-point tracking, maintaining the desired depth. To perform way-point tracking, the AUV can be fine-tuned to the desired heading angle through the LOS (Line Of Sight) method. This paper shows the results of simulation and field tests.

A Study On Field Test of IGBT Type Propulsion System for Electric Locomotive (전동차용 IGBT형 추진제어장치의 본선시험에 관한 연구)

  • 박건태
    • Proceedings of the KIPE Conference
    • /
    • 2000.07a
    • /
    • pp.576-580
    • /
    • 2000
  • This paper describes about the field test of IGBT VVVF inverter for the propulsion system. The 1650kV class IGBT VVVF inverter has been developed. Therefore the field test is performed in SMG 6 Line to confirm its the reliability and performance. The train consists of 4M4T and the electrical equipment for field test are as follows : VVVF inverter 4 sets 16 traction motors and 3 SIVs The propulsion system which have the excellent acceleration/deceleration and the jerk chracteristics as well as starting ability on slope are taken through the field test.

  • PDF

Data Processing Method of Radar Processor Unit Test Equipment (레이다처리장치 시험장비의 데이터 처리방안)

  • Lee, Mincheol;Kim, Yong-min
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.6
    • /
    • pp.767-775
    • /
    • 2018
  • To develop and check a Radar Processor Unit, checking the function and performance of the requirement is very important factor in developing Radar. General methods for verifying the Radar is simulation test, environment linkage test and field operation test, firstly, in case of requirement analysis phase, verify Radar algorithm and design by using mathematical method based simulation test method, and secondly, in case of unit test and integrated test phase, Test Equipment is set to simulate radar environment in the lab to verify radar function and performance. Lastly, field operation test phase is carried out to confirm the function and performance after it is mounted on the actual equipment. To successfully develop Radar Processor Unit, using the method of field operation test method after sufficient test cases are tested in radar environmental interlocking method in order to save cost and testing period and because of this reason, development of the Radar Processor Unit Test Equipment is becoming very important factor. In this paper, we introduce the concept of test equipment development and important factors in test equipment, which are target simulation, data processing and device interlocking.

The field-test of Power Quality Meter and Power Management System in order to verify the performance (PQM 및 PQMS 성능검증을 위한 실증시험)

  • Choi, Sun-Kyu;Song, Il-Keun;Kwon, Tae-Ho;Han, Jae-Wook
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.235-239
    • /
    • 2005
  • This paper gives a field-test method and result of PQM(Power Quality Meter) and PQMS(Power Quality Management System). The field-test was carried out as our own method. So, the test method has several kinds of improvement in this paper because it is first time to try the field-test of the equipment. However, we expect that the test result of PQM & PQMS has been used as a reference data which makes a scheme of evaluating performance of the equipment that has been used or is developed.

  • PDF

An Evaluation of Selective Grounding Fault Protective Relaying Technique Performance on the Ungrounded DC Traction Power Supply System (도시철도 직류 비접지 급전계통에서의 선택 지락보호시스템의 성능평가)

  • Jung, Hosung;Kim, Joouk;Shin, Seongkuen;Kim, Hyungchul;An, Taepung;Yun, Junseok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1964-1969
    • /
    • 2012
  • This paper presents to verify the selective grounding fault protective relaying technique for the ungrounded DC traction power supply system. This system selectively blocks fault section when grounding fault occurred. In order to perform this verification, field test facilities have been installed on Oesam substation and Worldcup-Stadium substation, and field test process has been suggested. Also, selective grounding fault protective relaying components and rail voltage reduction device have been tested with the various trial examinations. In order to compare and evaluate performance of the selective grounding fault protective relaying function, field test system was modeled and the system fault simulation results were compared and evaluated with the field test result. Performance of selective grounding fault protective relaying function was evaluated with the above-mentioned process, and the fact that the system recognizes fault section irrespective of insulation between rail and ground and fault resistance from grounding fault.

Evaluation of the Performance of One-way Drainage Filter by Field Test (시험시공을 통한 일방향 배수필터의 성능 평가)

  • Seo, Dong-Uk;Kim, Hyeon-Tae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.4
    • /
    • pp.47-53
    • /
    • 2012
  • It is needed to install a one-way drainage filter to prevent a seepage from lake or river outside of embankment and to promote a drainage from a flood inside of embankment when dikes such as lake dike, river dike, etc are constructed. However, the results of research for one-way drainage filter are insufficient. Therefore, through the field test of one-way drainage filter, this study checked a function of one-way drainage filter with a test of performance. As a result of field test, water flow in dike was blocked in the interception direction of the section that one-way drainage filter was installed, but water passed to the flow allowance direction of the section. Therefore we confirmed the function of one-way drainage filter. Seepage quantity in the flow allowance direction of the one-way drainage filter section was low as 74.6~80.5 % than that in the section without installation of filter because of a reduction effect of seepage with filter. And seepage quantity of field test was low as 64.3~90.0 % than that in results of seepage analysis because the coefficient of permeability of embankment in field is different from the results of laboratory test. In the future, more study will be needed to solve several problems which are related to fix the filter on slide, durability of filter, etc.

Thin Bonded Concrete Overlay for Concrete Pavement Rehabilitation (콘크리트포장의 박층 콘크리트 덧씌우기공법)

  • 윤경구;이형준;엄주용;서영찬
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.635-642
    • /
    • 1997
  • This research focused on the development of concrete overlay and test, which was conducted at 88 Highway 105k, 2 lanes of 290 m. The field application test consists of 6 cm and 10 cm bonded concrete overlay and 25 cm unbonded concrete overlay, using the slag cement for opening lanes for traffic early. The overlay were placed in a day. The whole period of traffic closing wes 8 day and it was reopened to traffic after concrete overlay has cured for 3 day. 5 cracks were founded when the field test section was investigated after 1 month, but all these may not make significant problems to overlay because these initiated and growed at the same line of repair section. The rideability and skid resistance become much better like in the new pavement after overlay. The structural capacity against deflection was much. which were verified by FWD(Falling Weight Deflectometer). The field test section is being used in a good condition and the results of field application and pavement performance analysis are encouraging. This rehabilitation methods may be adopted in Korea after a more field performance verifications.

  • PDF

Performance Test for the SIGMA Communication System

  • Jeong, Seonyeong;Lee, Hyojeong;Lee, Seongwhan;Shin, Jehyuck;Lee, Jungkyu;Jin, Ho
    • Journal of Astronomy and Space Sciences
    • /
    • v.33 no.4
    • /
    • pp.335-344
    • /
    • 2016
  • Scientific CubeSat with Instruments for Global Magnetic Fields and Radiations (SIGMA) is a 3-U size CubeSat that will be operated in low earth orbit (LEO). The SIGMA communication system uses a very high frequency (VHF) band for uplink and an ultra high frequency (UHF) band for downlink. Both frequencies belong to an amateur band. The ground station that communicates with SIGMA is located at Kyung Hee Astronomical Observatory (KHAO). For reliable communication, we carried out a laboratory (LAB) test and far-field tests between the CubeSat and a ground station. In the field test, we considered test parameters such as attenuation, antenna deployment, CubeSat body attitude, and Doppler frequency shift in transmitting commands and receiving data. In this paper, we present a communication performance test of SIGMA, a link budget analysis, and a field test process. We also compare the link budget with the field test results of transmitting commands and receiving data.