• Title/Summary/Keyword: Field Construction Process

Search Result 874, Processing Time 0.027 seconds

A STUDY OF INVOICELESS PROCESS USING RFID IN CONSTRUCTION FIELD

  • Tai Sik Lee ;Kyoung Soon Park ;Ja Kyoung Koo ;Young Hyun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1250-1255
    • /
    • 2005
  • Application of radio frequency Identification (RFID) technology in construction industry is not that progressive compared with other industries, because of it's high price experimental research. This research focus on potential application of RFID which eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. This paper suggest an invoiceless system using RFID technology, Process productivity and efficiency for material management is observed through WebCYCLONE and is compared with other processes.

  • PDF

SAMPLE PATH PROPERTY OF CHENTSOV FIELDS

  • Kim, Joo-Mok
    • Journal of the Chungcheong Mathematical Society
    • /
    • v.11 no.1
    • /
    • pp.35-44
    • /
    • 1998
  • Let {X(t), $t{\in}\mathbb{R}^n$} be a $S{\alpha}S$ H-sssis Chentsov random field with control measure m. We consider a geometric construction for L$\acute{e}$vy-Chentsov random fields and Takenaka random fields. Finally, we proved some property of conjugate classes and a.s. H$\ddot{o}$lder unboundedness of $S{\alpha}S$ H-sssis Chentsov random fields for all order ${\gamma}$ > H.

  • PDF

Building-up and Feasibility Study of Image Dataset of Field Construction Equipments for AI Training (인공지능 학습용 토공 건설장비 영상 데이터셋 구축 및 타당성 검토)

  • Na, Jong Ho;Shin, Hyu Soun;Lee, Jae Kang;Yun, Il Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.99-107
    • /
    • 2023
  • Recently, the rate of death and safety accidents at construction sites is the highest among all kinds of industries. In order to apply artificial intelligence technology to construction sites, it is essential to secure a dataset which can be used as a basic training data. In this paper, a number of image data were collected through actual construction site, for which major construction equipment objects mainly operated in civil engineering sites were defined. The optimal training dataset construction was completed by annotation process of about 90,000 image dataset. Reliability of the dataset was verified with the mAP of over 90 % in use of YOLO, a representative model in the field of object detection. The construction equipment training dataset built in this study has been released which is currently available on the public data portal of the Ministry of Public Administration and Security. This dataset is expected to be freely used for any application of object detection technology on construction sites especially in the field of construction safety in the future.

Visualizing Construction Process Linking Process Simulation (프로세스 시뮬레이션을 연계한 건설공정 시각화)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.73-79
    • /
    • 2006
  • Even though graphical simulation is very useful for construction planning, the application of graphical simulation has a limitation in dealing with objects without fixed form like earthmoving process. In this case, the mathematical/statistical simulation about the productivity of the whole processes based on the numerical data of working time, waiting time and working capacity of using equipment becomes effective. The mathematical/statistical simulation is not fully utilized in the field of construction due to the difficulties of creating process models and securing trust the numerically expressed results of simulation. In this research, the output of discrete-event simulation programs which are the most common mathematical/statistical simulation tool for construction processes were analyzed for the purpose of earthmoving process visualization. The purpose of this research is to develop a graphical simulation system that can help the construction planner select most suitable equipment and construction methods through the visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc.

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

Cases of Artificial Intelligence Development in the Construction field According to the Artificial Intelligence Development Method (인공지능 개발방식에 따른 건설 분야 인공지능 개발사례)

  • Heo, Seokjae;Chung, Lan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.217-218
    • /
    • 2021
  • The development of artificial intelligence in the field of construction and construction is revitalizing. The performance and development techniques of artificial intelligence are changing rapidly, but if you look at the cases of domestic construction sites, they are using technologies from 5 to 7 years ago. It is right to follow a stable method in consideration of commercialization, but the previous AI development method requires more manpower and time to develop than the current technology. In addition, in order to actively utilize artificial intelligence technology, customized artificial intelligence is required to be applied to ever-changing changes in construction sites. it is the reality As a result, even if good AI technology is secured at the construction site, it is reluctant to introduce it because there is no advantage in terms of time and cost compared to the existing method to apply it only to some processes. Currently, an AI technique with a faster development process and accurate recognition has been developed to cope with a fluid situation, so it will be important to understand and introduce the rapidly changing AI development method.

  • PDF

A Study of the field application on fully Dry-process Waterproofing system (건식방수공법의 현장적용 사례 연구)

  • Yoon kwang-Pil;Moon So-Hyun;Jang Jin-Ho;Jang Sung-Ju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.197-202
    • /
    • 2005
  • This study started to confirm and prove for the applicability of the dry-process waterproofing system to cover the defects of the wet-process waterproofing system according to weather circumstance, foundation condition and maintenance, etc. This process has triple combined waterproofing system using asphalt sheet, metal sheet, engineering plastic film. It is not influenced by the concrete's crack as the foundation of the roof according to the movement of the building because the waterproofing system is designed for maintaining good quality by absorbing the stress of contraction and expansion that is occurred by the variation of temperature. Ali components used in this process can be recycled environmentally. The superiority of this process proved and reconfirmed through with the investigation of about 130 fields, around 30,000nf for two years.

  • PDF

Prospects of Bidding System in Mechanical Construction Field due to Environmental Change in Construction Production Processes (건설생산체계의 환경 변화에 따른 기계설비분야 발주시스템 변화 전망)

  • Kang, Byung-Ha;Kim, Kyung-Rae
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1104-1111
    • /
    • 2009
  • Mechanical facilities in modern buildings and industrial plants become more important in the view points of energy and environment issues. However, mechanical construction fields are still considered as to be subjected to buildings, even though design and construction of mechanical fields in the construction production process is independent of other fields. Recently, 'Framework Act on the Construction Industry' has been revised since 2007. According to the revision, the barrier of general construction and specialized construction is collapsed and the construction company can register any type of construction classification if they are able to carry out the construction mission. The mechanical construction fields are exempt until 2011 because of the protection of mechanical construction industry. In the present study, the bidding system has been prospected due to the revision of 'Basic Law on Construction Industry' after 2011. The trends for development of mechanical construction fields has been also discussed.

  • PDF

Understanding of Group Modeling Process with Geological Field Trip applied on Social-Construction of Scientific Model: Focusing on Constraints (과학적 모델의 사회적 구성 수업을 적용한 야외지질학습에서 나타나는 조별 모델 구성과정 이해: 제약조건을 중심으로)

  • Choi, Yoon-Sung;Choi, Jong-Rim;Kim, Chan-Jong;Choe, Seung-Urn
    • Journal of the Korean earth science society
    • /
    • v.38 no.4
    • /
    • pp.303-320
    • /
    • 2017
  • Purpose of this study is understanding of group modeling process focusing on constraints with geological field trip applied on social-construction of scientific model. This study was carried out on 12 students of 3 groups who participate in the study 'S' gifted education center. Students were conducted to theme of 'How was formation of Mt. Gwanak?' on 2 field trip classes and 3 modeling classes. Semi-structured interviews, all discourse of field trip and modeling classes, records of personal and group activity were analyzed to constraints based on theoretical background proposed by Nersessian (2008). Results as follows. First, sources of constraints are scientific knowledge, contents observed by students during field trips and additional materials things to be explained by model during modeling class with geological field trip applied on social-construction of scientific model. Second, there are 3 types of constraints to affect making group modeling. It is that shared constraint which used commonly by all the group members. It called selected constraint that used during the initial modeling and later were reflected on for use in the group modeling. And it is that generated constraints, which were not in the initial modeling but were used later in the group modeling. This study suggests that not only the constraints can help to understand of making group model through how they used but also show that example of learning with geological field trip on social-construction of scientific model to contribute school science.

Optimum Construction Duration for Road Tunnel Excavation Works (도로터널 굴착공사의 적정공기 판단기준)

  • Kim, Ha-Na;Kim, Dae Young;Kim, Dae-Young;Jeong, Seong-Chun;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.