• Title/Summary/Keyword: Fault Restoration

Search Result 101, Processing Time 0.039 seconds

Development of An Expert system with Knowledge Learning Capability for Service Restoration of Automated Distribution Substation (고도화된 자동화 변전소의 사고복구 지원을 위한 지식학습능력을 가지는 전문가 시스템의 개발)

  • Ko Yun-Seok;Kang Tae-Gue
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.12
    • /
    • pp.637-644
    • /
    • 2004
  • This paper proposes an expert system with the knowledge learning capability which can enhance the safety and effectiveness of substation operation in the automated substation as well as existing substation by inferring multiple events such as main transformer fault, busbar fault and main transformer work schedule under multiple inference mode and multiple objective mode and by considering totally the switch status and the main transformer operating constraints. Especially inference mode includes the local minimum tree search method and pattern recognition method to enhance the performance of real-time bus reconfiguration strategy. The inference engine of the expert system consists of intuitive inferencing part and logical inferencing part. The intuitive inferencing part offers the control strategy corresponding to the event which is most similar to the real event by searching based on a minimum distance classification method of pattern recognition methods. On the other hand, logical inferencing part makes real-time control strategy using real-time mode(best-first search method) when the intuitive inferencing is failed. Also, it builds up a knowledge base or appends a new knowledge to the knowledge base using pattern learning function. The expert system has main transformer fault, main transformer maintenance work and bus fault processing function. It is implemented as computer language, Visual C++ which has a dynamic programming function for implementing of inference engine and a MFC function for implementing of MMI. Finally, it's accuracy and effectiveness is proved by several event simulation works for a typical substation.

Application Management System with ZeroMQ and Alarms in Distribution Management System (배전운영 시스템에서의 ZeroMQ와 알람 정보를 이용한 운영기능 관리 시스템)

  • Kim, Pil-Seok;Kang, Ho-Young;Lim, Il-Hyung;Park, Jong-Ho;Shin, Yong-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1161-1167
    • /
    • 2015
  • Distribution Management System(DMS) ienhancing distribution automation system-based operation efficiency is an optimized system by various operational applications in a distribution network. DMS employs various applications like topology reconfiguration, volt/var control, and restoration at events such as overload, voltage violation, and a fault in a distribution system. An operation efficiency to employ multi-applications as restoration with short-term load forecasting is higher than a performance by a single application; and the applications are accomplished by an operator’s control. Applications’ combination is determined by various alarm information which means critical issues in order to operate a distribution system. Thus, this paper proposes an application management system which can configure application combination, control applications depending on alarm information and check their performance condition. The proposed application management system can be customized by operator easily and have high operation efficiency and reliability because it is worked by reviewed alarm information from operator.

The Optimized Standards and Criteria for Installing Switches on Distribution Feeder (국내 배편계통의 최적 개폐기 설치 기준)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.5
    • /
    • pp.238-246
    • /
    • 2002
  • Utilities are trying to install the equipment of high quality to avoid deterioration of supply reliability. In addition, many sectionalizing switches which can decrease the total outage value for a fault are installed for the same reason. Therefore, utilities are interested in stun dards and criteria for installing switches to optimize the total cost on distribution systems. The affect of sectionalizing switches installed on distribution feeder is gradually decreased because the failure rate on distribution feeder is decreased. Also the automation for distribution systems is widely applied for the efficient operation. Therefore, the renewal for installation standards of sectionalizing switches Is required to reflect the current operation situation. The variable data is used to consider the KEPCO's real situation of distribution feeder as follows; the feeder capacity, connecting rate, feeder length, failure rate of distribution feeder, the failure rate of switches, perception time of feeder fault, the restoration time for a faulted section, the transfer time to other feeders, and the switching time. In this study, We propose equations which can determine the number of sectionalizing switches for minimizing the outage and switch installation cost.

The optimized standards and criteria for installing switches on distribution feeder (국내 배전계통의 최적 개폐기 설치 기준(I))

  • Cho, Nam-Hun;O, Jae-Hyeong;Lee, Heung-Ho;Ha, Bok-Nam
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.70-73
    • /
    • 2002
  • Utilities are trying to install the equipment of high quality to avoid deterioration of supply reliability. In addition, many sectionalizing switches which can decrease the total outage value for a fault are installed for the same reason. Therefore, utilities are interested in standards and criteria for installing switches to optimize the total cost on distribution systems. The affect of sectionalizing switches installed on distribution feeder is gradually decreased because the failure rate on distribution feeder is decreased. Also the automation for distribution systems is widely applied for the efficient operation. Therefore, the renewal for installation standards of sectionalizing switches is required to reflect the current operation situation. The variable data is used to consider the KEPCO's real situation of distribution feeder as follows; the feeder capacity, connecting rate, feeder length, failure rate of distribution feeder, the failure rate of switches, perception time of feeder fault, the restoration time for a faulted section, the transfer time to other feeders, and the switching time. In this study, We propose equations which can determine the number of sectionalizing switches for minimizing the outage and switch installation cost.

  • PDF

Case Study on Stability Assessment of Pre-existing Fault at CO2 Geologic Storage (CO2 지중저장 시 단층 안정성 평가)

  • Kim, Hyunwoo;Cheon, Dae-Sung;Choi, Byung-Hee;Choi, Hun-Soo;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.23 no.1
    • /
    • pp.13-30
    • /
    • 2013
  • Increase of pore fluid pressure resulting from injection of $CO_2$ may reactivate pre-existing faults, and the induced seismic activities can raise the safety issues such as seal integrity, restoration of storage capacity, and, in the worst case, removal of previously injected $CO_2$. Thus, fault stability and potential for $CO_2$ leakage need to be assessed at the stage of site selection and planning of injection pressure, based on the results of large-scale site investigations and numerical modeling for various scenarios. In this report, studies on the assessment of fault stability during injection of $CO_2$ were reviewed. The seismic activities associated with an artificial injection of fluids or a release of naturally trapped high-pressure fluids were first examined, and then site investigation methods for the magnitude and orientation of in situ stresses, the distribution and change of pore fluid pressure, and the location of faults were generally summarized. Recent research cases on possibility estimation of fault reactivation, prediction of seismic magnitude, and modeling of $CO_2$ leakage through a reactivated fault were presented.

Service Restoration In Distribution Networks Using Cyclic Best-First Search (순환적 최적우선탐색을 이용한 배전계통의 정전복구)

  • Choi, Sang-Yule
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.5
    • /
    • pp.162-168
    • /
    • 2004
  • Service restoration is an emergency control in distribution control centers to restore out-of-service area as soon as possible when a fault occurs in distribution networks. Therefore, it requires fast computation time and high quality solutions for load balancing. In this paper, a load balance index and heuristic guided best-first search are proposed for these problem. The proposed algorithm consists of two parts. One is to set up a decision tree to represent the various switching operations available. Another is to identify the most effective the set of switches using proposed search technique and a feeder load balance index. Test results on the KEPCO's 108 bus distribution system show that the performance is efficient and robust.

A Restoration Method for Improving Fault Recovery in MPLS Networks Routing Protocol (패킷망에서 NGN을 위한 라우팅 프로토콜MPLS망에서 장애 개선을 위한 복구 기법)

  • In Chi-Hyung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.11B
    • /
    • pp.956-966
    • /
    • 2004
  • Nowadays, NGN(Next Generation Network) is evolving into network with packet based QoS.\ulcorner This paper presents the recovery method as a selecting way of more efficient path in MPLS network that reduces the service interruption time. In order to increase the efficiency of usage of recovering resource which is one of major functions of disorder recovering, it opens the state information of each Node both to fault detector and bandwidth broker so that it reduces message transmission time for recovery when functional disorder occurs. in addition, by effective management and adjustment of required bandwidth of entire network depending on the changes of traffic load, it improves the efficiency of bandwidth usage. and in MPLS network supporting priority selection function, it allocates domains depending on the traffic relating to priority order to the entire network so that\ulcorner it efficiently allocates proper resources to the restoring process between the entry and the end for the traffic of high priority and for low priority traffic, it restores path oかy inside disordered domain. by doing this, it reduces resetting time and unnecessary massage transmission.

Development of Expert System for Operation in Distribution Systems with Graphic Integrated Environments (그래픽 통합 환경을 갖춘 배전계통 운용 전문가 시스템 개발)

  • Kim, Se-Ho;Seo, Ki-Sung;Kim, Jeong-Keun;Park, Byoung-Youn;Woo, Kwang-Bang
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.9
    • /
    • pp.960-972
    • /
    • 1992
  • This paper deals with the development of expert system in distribution system which combined with graphic user interface. The proposed expert system can recognize and adjust to the system change, and includes the rule bases of security monitoring. Also it provides load transfer algorithm for efficient load distribution. The graphic user environment for expert system is implemented in the mouse-oriented user interface with overlapped window functions and pull-down menus. Therefore, the developed graphic integrated expert system can afford to assist system operators very conveniently through the various graphic function in proposing an optimal plan of load transfer for fault restoration and outage schedule.

Introduction of the fault restoration practice result applied to real time power system operation using DTS (DTS를 활용한 고장복구 모의훈련 결과의 실시간 계통운영 적용 사례 소개)

  • Jung, Chang-Hyun;Kim, Jae-Ho;Jung, Eung-Soo;Lee, Ik-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.376-377
    • /
    • 2011
  • DTS(Dispatcher Training Simulator)는 EMS(Energy management System) 전력계통 모델을 기반으로 off-line 환경에서 운영되는 급전원 훈련용 시뮬레이터이다. 급전원들은 DTS를 활용하여 다양한 상황별 시나리오를 반복 훈련함으로써 실제 전력계통 운영 및 유사시 대응능력을 배양할 수 있다. 본 논문은 전력거래소 중앙급전소에서 급전원 훈련용으로 사용되는 DTS의 다양한 기능 및 구조, 활용실적과 실시간 계통운영 적용 사례를 소개하고자 한다.

  • PDF

The Self-Fault Restoration Strategy for the Load Balancing in the Distribution Systems (부하 균등화를 지향하는 배전계통의 자율적 고장복구 방법론 연구)

  • Ko, Yun-Seok;Lee, Seo-Han;Choi, Hyun-Chul;Shin, Jae-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.147_148
    • /
    • 2009
  • 본 연구에서는 기존 중앙제어방식의 고장구간 분리 및 복구 시 문제점을 해소하기 위해 새로운 시도로서 고장이 완전히 분리된 상태에서 자율적 복구 알고리즘을 제안하였다. 제안된 방법론에서 무전압을 경험하는 FRTU들은 분하분할을 시도하고, 각 연계 개폐기 FRTU들은 자기의 부하융통 영역들을 동시에 자율적, 순차적으로 결정하도록 함으로서 전전시간을 최소화함은 물론, 합리적인 범위 내에서 부하분담 균등화가 얻어지도록 설계하였다.

  • PDF