• Title/Summary/Keyword: Fault Restoration

Search Result 101, Processing Time 0.03 seconds

Fault Locator using GPS Time-synchronized Phasor for Transmission Line (송전선로의 동기페이저를 이용한 고장점 표정장치)

  • Lee, Kyung-Min;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.1
    • /
    • pp.47-52
    • /
    • 2016
  • Fault location identification in the transmission line is an essential part of quick service restoration for maintaining a stable in power system. The application of digital schemes to protection IEDs has led to the development of digital fault locators. Normally, the impedance measurement had been used to for the location detection of transmission line faults. It is well known that the most accurate fault location scheme uses two-ended measurements. This paper deals with the complete design of a fault locator using GPS time-synchronized phasor for transmission line fault detection. The fault location algorithm uses the transmitted relaying signals from the two-ended terminal. The fault locator hardware consists of a Main Processor Unit, Analog Digital Processor Unit, Signal Interface Unit, and Power module. In this paper, sample real-time test cases using COMTRADE format of Omicron apparatus are included. We can see that the implemented fault locator identified all the test faults.

A Restoration Automation Algorithm on a Fault in Substation of SCADA-coordinated Distribution Automation System (SCADA가 통합된 배전자동화 시스템의 변전소 사고 시 복구 자동화 알고리즘)

  • Hong, Jun-Ho;Lim, Il-Hyung;Lee, Seung-Jae;Kim, Tae-Wan;Choi, Myeon-Song;Ha, Bok-Nam;Lee, Sung-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2107-2114
    • /
    • 2009
  • It is impossible to take the instant action in the distribution system When fault occures in a substation because operation of the substation and the distribution system are separated. However the power system automation has been studying about unity operation and co-operation between SCADA and DAS(Distribution Automation System). In this paper proposes a new algorithm of efficiency restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR in united system between DAS and SCADA. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads. In the case studies, the proposed algorithm have been verified in 2 MTR and 3 MTR substation

A Restoration Algorithm using Moving the tie Switch in Distribution System in case of Fault Occur in Power system Substation MTR (변전소 내 주변압기 사고 발생 시 배전계통 연계점 이동을 통한 복구 알고리즘)

  • Hong, Jun-Ho;Lee, Seung-Jae;Choi, Myeon-Song;Lim, Il-Hyung;Kim, Tae-Wan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.159_160
    • /
    • 2009
  • In this paper proposes a new algorithm of efficiency outage restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads.

  • PDF

Development of a Real-Time Restoration System for radially operated 154kV Loop System (154kV 방사상 운전계통에 대한 실시간 고장복구시스템 개발 1(알고리즘))

  • Jung, Jung-Won;Lee, Gi-Won;Park, Kyu-Hyun;Choo, Jin-Boo;Yoon, Yong-Beum
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.851-853
    • /
    • 1997
  • This paper presents an algorithm for real-time restoration of radially operated 154kV loop system. Restoration procedure consists of 4 procedures; recognition of faults, identification of fault locations, seperation of fault locations and restoration of blackout areas. This algorithm adopts expert's knowledge for safe and accurate operation of the real-time restoration system (APRS: Automatic Power Reconfiguration System).

  • PDF

An Expert System for Fault Restoration using Tree Search Strategies in Distribution System (트리탐색법을 이용한 사고복구 전문가시스템)

  • 김세호;최병윤;문영현
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.3
    • /
    • pp.363-371
    • /
    • 1994
  • This thesis investigates an expert system(ES) to propose fault restoration plan by utilizing tree search strategies. In order to cope with an extensive amount of data and frequent breaker switching operations in distribution systems, the database of system configuration is constructed by using binary trees. This remarkably enhances the efficiency of search algorithm and makes the proposed ES easily adaptable to system changes due to switching operations. The rule-base is established to fully utilize the meris of tree-structured database. The inferring strategy is developed mainly based on the best-first search algorithm to increase computation efficiency. The proposed ES has been implemented to efficiently deal with large distribution systems by reducing computational burden remarkably compared with the conventional ES's.

  • PDF

A Study on Outage Restoration Guide Including Load Cutoff in Distribution System (부하차단을 포함한 배전계통 정전복구방안에 관한 연구)

  • 김세호
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.1
    • /
    • pp.98-104
    • /
    • 2004
  • This paper represents the fast and efficient load transfer guide for fault or outage restoration in distribution system. For restoration guide, system trace is performed to reverse direction(source side) from tie breaker in tree-structured distribution network. Search space and breaker's combinational number for restoration guide are greatly reduced. It is proposed the load transfer method including first stage restoration(single load transfer, double load transfer, triple load transfer), second stage restoration(transferring load to neighboring feeder in order to expand the capacity margin) and load cutoff guide. The proposed method can be easily applied to primary customer restoration, multi-fault recovery and distribution automation system.

A Novel Algorithm for Reducing Restoration Time in Smart Distribution Systems Utilizing Reclosing Dead Time

  • Hussain, Akhtar;Choi, Myeon-Song;Lee, Seung-Jae
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1805-1811
    • /
    • 2014
  • After an occurrence of a fault in any distribution system, it is desired to limit the effects of the fault to smallest possible area and restore the un-faulty areas as soon as possible. Due the advancements in communication technologies, this task can be achieved in multiple efficient ways. In order to decrease the restoration time in the Smart Grid Distribution Management System (SDMS) a communication based algorithm is proposed in this paper, in which the restoration can be done during reclosing. This paper also analyzes various communication failures with power failures cases including the entire network of communication failures. Results of all these cases have been verified by doing simulations.

Evaluation of Restoration Capability in Radial Primary Distribution System (배전계통의 복구능력 평가방법)

  • Lim, Seong-Il;Ha, Bok-Nam;Lee, Jung-Ho;Cho, Nam-Hun;Lee, Seong-Jae
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.267-269
    • /
    • 1999
  • One of the main jobs of the operators is to make it sure to have a service continuity in a fault situation. This paper proposes a restoration index which indicates the restoration capability of the feeder in case of a fault. A necessary and sufficient condition for a feeder to have 100% restoration of the outage is also described.

  • PDF

A Study on the Restoration Aid Expert System for Distribution Networks (배전계통의 복구 지원 전문가 시스템에 관한 연구)

  • Lee, H.J.;Lee, K.S.;Lee, C.K.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.3-5
    • /
    • 2001
  • When a fault occurs on distribution network. blackout region may happen, then it should be restored as fast as possible to minimize interruption of electric service. In this paper. A near optimal method to restore distribution network is proposed. For an optimal restoration, the number or switching operations must be minimized. The proposed method generates a general restoration plan for any distribution network fault and designed to reduce switching operations considering available load transfers. In this method overall process time can reduce with heuristic rules, which make a reduction of search space before restoration process. To achieve a near optimal solution, multiple load transfer algorithm is proposed too.

  • PDF

An Expert System for Security Assessment in Distribution System (배전계토에서의 안전도 평가를 위한 전문가 시스)

  • Park, Byoung-youn;Kim, Se-Ho;Moon, Young-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.2
    • /
    • pp.179-188
    • /
    • 1994
  • This paper deals with implementation of an expert system to obtain an optimal plan of load transfer for fault restoration with the capability of security monitoring and assessment in distribution systems. Based on the technique of load transfer tree analysis, the proposed expert system can afford to assist system operators in proposing an optimal plan of load transfer for fault restoration, In paticular, an application of the proposed ES to practical distribution systems yields an optimal load transfer plan which ensures system security by considering security assessment for contingency of feeders and main transformers in the knowledge based sense.