THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

Fast Track 건축공사의 BIM 적용 사례에 관한 연구 (A Case Study of BIM application to the Building Construction Project using Fast Track Method)

  • 유필상;한병민;정민구;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.210-211
    • /
    • 2013
  • The purpose of this research is to perform a case study for verifying problems of BIM application to the building construction project using Fast Track method. The object of case study is an actual construction project completed in 2013. As a result, some problems and solutions for those were extracted. The result of this study will contribute revitalization to the BIM application in the project using Fast Track method.

  • PDF

복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석 (Application Method of Phase Division of Fast Track for Construction Project with Complex Structures)

  • 김현수;황재영;강효정;박상미;이재희;강인석
    • 대한토목학회논문집
    • /
    • 제42권1호
    • /
    • pp.95-105
    • /
    • 2022
  • 최근 공사규모의 대형화, 복잡화 등으로 토목, 건축, 기계 등의 복합공종으로 구성된 공사들은 공기절감을 위해 패스트트랙(Fast Track) 방식으로 진행되는 사례가 많으며, 패스트트랙 방식에서는 적정 단계구분이 전체 프로젝트의 공기 책정에 중요한 사안이다. 본 연구에서는 복합공종으로 구성된 건설공사가 패스트트랙으로 진행될 때 적용할 수 있는 단계구분 방식을 제시하고 있다. 이를 위해 연구에서는 토목, 건축공사로 구성된 4개의 축구전용경기장 공사를 적용 사례로 분석하여 세분화된 공정분류체계(Work Breakdown Structure, WBS)를 통해 주요 단계별 공정 구분에 의한 일정표를 분석하고, 5가지 시안을 적용하여 패스트트랙 단계구분의 적정성을 분석한다. 분석된 시안중에서 최소 공기를 갖는 시안에 대하여 패스트트랙 단계구분 및 단계별 주요 공정의 구성 모형을 제시하였다. 이러한 방법론은 패스트트랙이 적용되는 유사한 규모의 대형 복합공사에서 패스트트랙 적용 시에 적정 단계 구분과 단계별 공정 구성 체계에 활용성을 가질 수 있다.

패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발 (AR system for FAB construction management using BIM data under fast track condition)

  • 이상원;이광수;최성인;류성찬;박정서
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향 (A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement)

  • 박종순;신창준;유병기;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.5-12
    • /
    • 2008
  • 양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.

  • PDF

Fast clip을 적용한 콘크리트궤도용 분기기 개발 (Development of turnout on concrete track using Fast clip)

  • 황광하;류기대;박춘복;박광련;윤병현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1002-1008
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. there are classified variously according to rail type, sleeper type, fastening system, track type. Construction of concrete track are on the increase recently to secure the safety of track structure as well as to reduce the maintenance cost. SFC fastening system used the plain track a lot and for those reasons, The fast clip turnout demand growing to improving efficiency of the maintenance cost by unification of fastening clip on whole line. in this study is about development of the fastening system for new turnout using fast clip. this fastening system assembled elasticity pad underneath a base plate. its can change stiffness how to adjust contact surface area of elasticity pad Developed fastening system have passed test according to rule of KRS-TR0014-09R (rail fastening system) and Performance Certification by KR.

  • PDF

댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구 (The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis)

  • 윤재호;문영일
    • 한국수자원학회논문집
    • /
    • 제36권5호
    • /
    • pp.715-724
    • /
    • 2003
  • 이 연구의 목적은 사회간접자본의 대표적인 시설인 댐과 같이 기획, 조사, 타당성분석 단계에서부터 설계, 계약, 시공 및 유지관리단계까지 건설 생애주기가 긴 경우 Risk에 노출되는 시간 또한 길어져 건설기간 지연에 따른 비용증가는 물론 적기 미 준공시의 증액비용과 이용연기에 따른 편익손실로 국가 전체의 경쟁력을 저하시킴으로 이들 문제점을 감소시키는 방법을 모색하는 것이다. 이에 본 연구에서는 생애주기 각 단계별로 경제성분석을 통한 공기와 비용을 연계 분석하여 효율적이고 체계적인 사업수행단계 및 건설공정 Network모델을 도출하고 이 성과를 토대로 생애주기분석에 있어 Fast Track기법을 적용하는 하나의 새로운 방안으로 제안하고자 한다.

캄보디아 시엠립 우회도로건설 사업 소개 (Introduction on the by-pass road construction for Siem Reap, Cambodia)

  • 노한성;김효배
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.614-625
    • /
    • 2008
  • The project of Construction of Siem Reap bypass road in Cambodia consists of alignment improvement of existing route, extension of width of road and laterite paving. This project is carried out by fast-track method on the design and construction for bypass road of 15.2 km length and 8m width for five months. Though some difficulties for the construction works such as the location of borrow pit and rock source, rainy seasons etc, the construction could be completed successfully owing to the cooperation of related authorities, company and residents. This 2 way Angkor detouring road will function as industrial roads in Siemreap region. These new two roads will not only bring better logistics requirements and safety, but also impact to poverty alleviation and preservation the beauty of the ecological environment of Angkor region. The basic information related to geotechnical engineering of this project is introduced.

  • PDF

Economic and Fast-track Rehabilitation of Concrete Pavements and Bridge Decks

  • Ramseyer, Chris;Chancellor, Brent;Kang, Thomas H.K.
    • International Journal of Concrete Structures and Materials
    • /
    • 제2권2호
    • /
    • pp.107-113
    • /
    • 2008
  • The last 10 years have seen considerable growth in the use of proprietary and special repair cements for concrete pavements in the state of Oklahoma. Many of these products lend themselves to "fast track" construction techniques that allow reopening to traffic within 12 hours or less. These products achieve high early strengths by accelerating the Portland cement hydration process for both Type I and Type III cements. In this paper, the important features of a durable repair which include strength, compatibility and bond or adhesion are first discussed. Then the development, testing and field implementation of the aforementioned materials are discussed including the learning curve required to implement a repair system, not just install a new material. Some of the materials discussed, while expensive on a cost per unit basis, hold great promise for economical use on fast track project.

광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구 (A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center)

  • 정재진;유병기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.32-39
    • /
    • 2003
  • 지방자치단체에서 공공공사 발주시 발주자는 사업추진에 대한 전문성 및 관리능력이 취약하며, 사업추진을 위한 전문조직을 갖추어 운영하는 것에 대한 부담과, 현행 책임감리 업무의 한계성에 대한 대안으로 건설사업관리(CM)용역의 발주를 선호하는 추세이다. 그러나 설계${\cdot}$시공일괄공사의 여건에서는 대형건설사업의 수행 및 CM적용 사례가 많지 않고, 일괄공사의 특성에 따른 문제 등으로 통상적으로 설계단계의 업무와 책임감리업무를 혼합한 형태로 CM업무가 수행되고 일어 전반적인 CM업무가 적용된다고 될 수 없다. 따라서 일괄공사에 적절하고 체계적인 CM방식이 정착되기 위하여는 앞으로도 많은 실험적 적용과 경험축적을 필요로 하고 있으며 이를 바탕으로 한 현실적인 적용방안의 모색이 요구되고 있다. 본 연구에서는 광진구민회관의 CM적용사례를 요약하여 실시설계관리, 설계${\cdot}$시공VE수행, Fast-Track적용, PMIS 운영 등에 대한 실무적용상의 문제점과 이에 대한 각각의 개선방향을 제시하고, 결론에서는 일괄공사에서 효율적으로 CM임무를 수행할 수 있는 방안을 제시하였다.

  • PDF