• 제목/요약/키워드: Failure forecasting

검색결과 76건 처리시간 0.022초

빙축열 시스템의 지능형 냉방부하예측에 관한 연구 (The Study on Intelligent Cooling Load Forecast of Ice-storage System)

  • 고택범
    • 전기학회논문지
    • /
    • 제57권11호
    • /
    • pp.2061-2065
    • /
    • 2008
  • In the conventional operation of ice-storage system based on operator's experience and judgement, the failure in forecast of cooling load occurs frequently due to operator's misjudgement and unskilled operation. This study presents the method of constructing self-organizing fuzzy models which forecast tomorrow temperature, humidity and cooling load periodically for economic and efficient operation of ice-storage system. To check the effectiveness and feasibility of the suggested algorithm, the actual example for forecasting temperature, humidity and cooling load of ice- storage system in KEPCO training institute, Sokcho, is examined. The computer simulation results show that the accuracy of temperature, humidity, cooling load forecast of the suggested algorithm is higher than that of the conventional methods.

신경회로망을 이용한 일일 냉방부하 예측에 관한 실험적 연구 (Experimental Study on Cooling Load Forecast Using Neural Networks)

  • 신관우;이윤섭;김용태;최병윤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 합동 추계학술대회 논문집 정보 및 제어부문
    • /
    • pp.61-64
    • /
    • 2001
  • The electric power load during the peak time in summer is strongly affected by cooling load. which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system etc are used to settle this problem. In this study, the method of estimating temperature and humidity to forecast the cooling load of ice-storage system is suggested. And also the method of forecasting the cooling load using neural network is suggested. For the simulation, the cooling load is calculated using actual temperature and humidity. The forecast of the temperature, humidity and cooling load are simulated. As a result of the simulation, the forecasted data approached to the actual data.

  • PDF

원자력 발전소 사고 예측 및 발전소 운행중지 정책 결정에 관한 연구 (Forecasting and Deciding When to Shutdown a Nuclear Power Plant to Prevent a Severe Accident)

  • Yang, Hee-Joong
    • 산업경영시스템학회지
    • /
    • 제23권55호
    • /
    • pp.25-31
    • /
    • 2000
  • To make a better decision about when to shutdown a nuclear power plant, we build a decision model using influence diagrams. We proceed the analysis adopting a bayesian approach. Firstly, an accident arrival rate is assumed to be known and this assumption is relaxed later. We perform our analysis on the cases of exponential time to accidents, and gamma distribution for the arrival rate. An optimal shutdown time is obtained considering the trade-off between the costs incurred by an accident due to late shutdown and the possible loss of revenues due to the early shutdown. We also derive the upper bound of the failure rate where we may operate the plant.

  • PDF

신경회로망을 이용한 냉방부하예측에 관한 연구 (The Study on Cooling Load Forecast using Neural Networks)

  • 신관우;이윤섭
    • 설비공학논문집
    • /
    • 제14권8호
    • /
    • pp.626-633
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system etc. are used to settle this problem. In this study, the method of estimating temperature and humidity to forecast the cooling load of ice storage system is suggested. And also the method of forecasting the cooling load using neural network is suggested. For the simulation, the cooling load is calculated using actual temperature and humidity, The forecast of the temperature, humidity and cooling load are simulated. As a result of the simulation, the forecasted data is approached to the actual data.

퍼지 논리를 이용한 일일 냉방부하 예측에 관한 연구 (A Study on Daily Cooling Load Forecast Using Fuzzy Logic)

  • 신관우;이윤섭
    • 제어로봇시스템학회논문지
    • /
    • 제8권11호
    • /
    • pp.948-953
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system are possible solutions to settle this problem. In this study. the method of estimating temperature and humidity to forecast the cooling load of ice-storage system is suggested, then the method of forecasting the cooling load using fuzzy logic is suggested by simulating that the cooling load is calculated using actual temperature and humidity. The forecast of the temperature, humidity and cooling load are simulated, and it is shown that the forecasted data approach to the actual data. Operating the ice-storage system by the forecast of cooling load with night electric power will improve the ice-storage system efficiency and reduce the peak electric power load during the summer season as a result.

로짓(Logit) 모델을 이용한 날씨요소와 송전선로 고장의 다중회귀분석 (Multiple Regression Analysis between Weather Factor and Line Outage using Logit Model)

  • 신동석;이윤호;김진오;이백석;방민재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.187-189
    • /
    • 2004
  • This paper investigates the effect of weather factors(such as winds, rain, snows, temperature, clouds and humidity) on transmission line outages. The result shows that weather variables have significant effects on the transmission line historical outages and the relationship between them is nonlinear. Multiple regression analysis using Logit model is proved to be appropriate in forecasting line failure rate in KEPCO systems. It could also provide system operators with useful informations about system operation and planing.

  • PDF

아파트 프로젝트의 초기 분양률 예측 회귀모델 (A Regression Model for Forecasting the Initial Sales Ratio of Apartment Building Projects)

  • 손승현;김도영;김선국
    • 한국건축시공학회지
    • /
    • 제19권5호
    • /
    • pp.439-448
    • /
    • 2019
  • 아파트 프로젝트는 사업성패에 영향을 미치는 요인은 매우 다양하다. 그러나 분양단가가 결정되고, 분양이 시작된 이후에는 사업에 가장 큰 영향을 미치는 요인은 분양 후 1개월간의 초기분양률이다. 일반적으로 사업주체는 경제상황, 주택시장의 동향, 사업지 인근의 주택가격 등 다양한 자료에 의해 초기분양률을 예측한다. 그러나 이러한 요인들을 초기분양률과 연계하여 정량적으로 계산하는 것은 매우 어렵다. 따라서 본 연구는 실제 수행된 아파트 프로젝트의 분양결과 자료를 이용하여 초기분양률 예측 회귀모델을 제안하는 것을 목적으로 한다. 본 연구를 위해 기존 분양실적자료 수집, 영향요인들의 상관관계 분석, 초기분양률 예측 회귀모델 작성을 진행한다. 본 연구의 결과는 아파트 프로젝트의 사업성 분석 시 초기 분양률 예측을 위한 기초자료로 활용되며, 사업 리스크 모델 개발의 핵심 자료로 활용된다.

적응시간 간격 알고리즘을 이용한 KIM의 계산 효율성 개선 (The Improvement of Computational Efficiency in KIM by an Adaptive Time-step Algorithm)

  • 남현;최석진
    • 대기
    • /
    • 제33권4호
    • /
    • pp.331-341
    • /
    • 2023
  • A numerical forecasting models usually predict future states by performing time integration considering fixed static time-steps. A time-step that is too long can cause model instability and failure of forecast simulation, and a time-step that is too short can cause unnecessary time integration calculations. Thus, in numerical models, the time-step size can be determined by the CFL (Courant-Friedrichs-Lewy)-condition, and this condition acts as a necessary condition for finding a numerical solution. A static time-step is defined as using the same fixed time-step for time integration. On the other hand, applying a different time-step for each integration while guaranteeing the stability of the solution in time advancement is called an adaptive time-step. The adaptive time-step algorithm is a method of presenting the maximum usable time-step suitable for each integration based on the CFL-condition for the adaptive time-step. In this paper, the adaptive time-step algorithm is applied for the Korean Integrated Model (KIM) to determine suitable parameters used for the adaptive time-step algorithm through the monthly verifications of 10-day simulations (during January and July 2017) at about 12 km resolution. By comparing the numerical results obtained by applying the 25 second static time-step to KIM in Supercomputer 5 (Nurion), it shows similar results in terms of forecast quality, presents the maximum available time-step for each integration, and improves the calculation efficiency by reducing the number of total time integrations by 19%.

주요 지역별 특성과 이동 기간 학습 기법을 활용한 장기 전력수요 예측 모형 개발 (Development of Long-Term Electricity Demand Forecasting Model using Sliding Period Learning and Characteristics of Major Districts)

  • 공인택;정다빈;박상아;송상화;신광섭
    • 한국빅데이터학회지
    • /
    • 제4권1호
    • /
    • pp.63-72
    • /
    • 2019
  • 전력 에너지의 경우 발전 및 송전 과정을 거쳐 사용자에게 제공된 이후에는 회수가 불가능하기 때문에 정확한 수요 예측에 기반한 최적 발전 및 송배전 계획이 필요하다. 전력 수요 예측의 실패는 2011년 9월에 발생한 대규모 정전사태와 같이 다양한 사회적·경제적 문제를 야기할 수 있다. 전력 수요 예측 관련 기존 연구에서는 ARIMA, 신경망모형 등 다양한 방법으로 개발이 되었다. 하지만 전국 단위의 평균 외기온도를 사용한다는 점과, 계절성을 구분하기 위한 획일적 기준을 적용하는 한계점으로 인해 데이터의 왜곡이나 예측모형의 성능 저하를 초래하고 있다. 이에 본 연구에서는 전력 수요 예측 모형의 성능을 향상하기 위해 전국을 5대 권역으로 구분하여 지역적 특성과 이동 기간 학습 기법을 통해 계절적 특성을 반영한 선형회귀모형과 신경망 모형의 장기적 전력 수요 예측 모형을 개발하였다. 이를 통해 중장기부터 단기에 이르기까지 다양한 범위의 수요 예측에 해당 모델을 활용할 수 있을 뿐만 아니라 특정 기간 중에 발생하는 다양한 이벤트와 예외 상황을 고려할 수 있을 것이다.

  • PDF

대수형 학습효과에 근거한 소프트웨어 신뢰모형에 관한 통계적 공정관리 비교 연구 (The Assessing Comparative Study for Statistical Process Control of Software Reliability Model Based on Logarithmic Learning Effects)

  • 김경수;김희철
    • 디지털융복합연구
    • /
    • 제11권12호
    • /
    • pp.319-326
    • /
    • 2013
  • 소프트웨어의 디버깅 오류의 발생 시간에 의존하는 많은 소프트웨어 신뢰성 모델이 연구되었다. 소프트웨어 오류 탐색 기법은 사전에 알지 못하지만 자동적으로 발견되는 에러를 고려한 영향요인과 사전 경험에 의하여 세밀하게 에러를 발견하기 위하여 테스팅 관리자가 설정해놓은 요인인 학습효과의 특성에 대한 문제를 비교 제시 하였다. 본 연구에서는 학습효과 비동질적인 유한고장모형 분석을 위한 모수 추정은 우도함수를 이용하였다. 소프트웨어 시장에 인도하기 위한 결정에 대하여 조건부 고장률은 중요한 변수가 되고 이러한 고장 모델은 실제 상황에서 많이 사용되고 있다. 통계적 공정 관리 (SPC)는 소프트웨어 오류의 예측을 모니터링 함으로써 소프트웨어의 신뢰성 향상에 크게 기여할 수 있다. 이러한 컨트롤 차트는 널리 소프트웨어 산업의 소프트웨어 프로세스 제어를 위해 사용된다. 본 연구에서는 로그 위험 학습 효과 속성의 비동질적인 포아송 과정의 평균값 기능을 사용한 컨트롤 메커니즘을 제안하였다.