Transactions of the Korean Society of Mechanical Engineers A
/
v.25
no.3
/
pp.443-451
/
2001
This paper addresses an on-line scheduling method for track systems in semiconductor fabrication. A track system is a clustered equipment performing photolithography process in semiconductor fabrication. Trends toward high automation and flexibility in the track systems accelerate the necessity of the intelligent controller that can guarantee reliability and optimize productivity of the track systems. This paper proposes an-efficient on-line scheduling method that can avoid deadlock inherent to track systems and optimize the productivity. We employ two procedures for the on-line scheduling. First, we define potential deadlock set to apply deadlock avoidance policy efficiently. After introducing the potential deadlock set, we propose a deadlock avoidance policy using an on-line Gantt chart, which can generate optimal near-optimal schedule without deadlock. The proposed on-line scheduling method is shown to be efficient in handling deadlock inherent to the track systems through simulation.
Transactions of the Korean Society of Mechanical Engineers A
/
v.29
no.11
s.242
/
pp.1463-1471
/
2005
This paper proposes an agent-based scheduling method fur semiconductor wafer fabrication facilities with hard inter-operation temporal constraints. The scheduling problem is to find the feasible schedules that guarantee both logical and temporal correctness. A proposed multi-agent based architecture is composed of scheduling agents, workcell agents, and machine agents. A scheduling agent computes optimal schedules through bidding mechanisms with a subset or entire set of the workcell agents. A dynamic planning-based approach is adopted for the scheduling mechanism so that the dynamic behaviors such as aperiodic job arrivals and reconfiguration can be taken into consideration.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.1
/
pp.153-161
/
2016
Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.
Journal of Korean Institute of Industrial Engineers
/
v.35
no.4
/
pp.266-279
/
2009
This paper focuses on the problem of scheduling wafer lots with limited waiting times between pairs of consecutive operations in a semiconductor wafer fabrication facility. For the problem of minimizing total tardiness of orders, we develop a priority rule based scheduling method in which a scheduling decision for an operation is made based on the states of workstations for the operation and its successor or predecessor operation. To evaluate performance of the suggested scheduling method, we perform simulation experiments using real factory data as well as randomly generated data sets. Results of the simulation experiments show that the suggested method performs better than a method suggested in other research and the one that has been used in practice.
Modeling and system development for the fabrication process in the semiconductor manufacturing is presented in this paper. Maximization of wafer production can be achieved by the wafer flow balance under high utilization of bottleneck machines. Relatively simpler model is developed for the fabrication line by considering main characteristics of logistics. Simulation system is developed to evaluate the line performance such as balance rate, utilization, WIP amount and wafer production. Scheduling rules and input rules are suggested, and tested on the simulation system. We have shown that there exists good combination of scheduling and input rules.
This paper presents a development of operation scheduling and reactive operation scheduling system for hull fabrication. The methodology for implementing operation scheduling system is HHGA(Hierarchical Hybrid Genetic Algorithm) which exploits both the global perspective of the genetic algorithm and the rapid convergence of the heuristic search for operation scheduling. The methodology for the reactive operation scheduling is the revised HHGA which consists of manual schedule editor for occurrence of exceptional events and the revised scheduling method used in operation scheduling. As the results of experiment, it has been confirmed that HHGA is able to search good operation scheduling within reasonable time, and the revised HHGA is able to search load-balanced reactive operation scheduling with minimum changes of initial operation schedule within short period of time.
반도체 Wafer Fabrication 공정은 무수한 공정과 복잡한 Lot의 흐름 등으로 다른 제조 형태에 비해 효율적인 관리가 대단히 어려운 부문이다. 본 연구는 반도체 Fab을 대상으로 주어진 생산 소요량과 목표 공기를 효율적으로 달성하기 위한 Shift 단위의 생산 일정계획을 대상으로 하였다. 특히, 전 공정 및 장비를 고려하기보다는 Bottleneck인 Photo 공정의 Stepper를 중심으로, 공정을 Layer단위로 묶어, 한 Shift에서 어떻게 Stepper를 할당하고 생산계획을 할 것인가를 결정하기 위한 2단계 방법론을 제시하고, Stepper 할당 및 계획에 필요한 3가지 알고리즘들을 제시하였다. 이 기법들을 소규모의 예제들에 대해 적용한 결과와 최적해와의 비교를 통하여 그 성능을 평가하였다.
Journal of Korean Society of Industrial and Systems Engineering
/
v.26
no.4
/
pp.63-71
/
2003
This paper analyses a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advance. The manufactured components are subsequently assembled into products. The completion time of a job(product) is measured by the latest completion time of its all components at the pre-assembly stage. The problem has the objective measure of minimizing the total weighted completion time of a finite number of jobs. Two lower bounds are derived and tested in a branch-and-bound scheme. Also, three constructive heuristic algorithms are developed based on the machine aggregation and greedy strategies. Some empirical evaluation of the performance of the proposed branch-and-bound and heuristic algorithms are also performed.
The inherent complexity of semiconductor fabrication processes makes it hard to solve well-known job scheduling problems in analytical ways, which leads us to rely practically on discrete event modeling simulations to learn the effects of changing the system's parameters. Meanwhile, unpredictable disturbances such as machine failures and maintenance diminish the productivity of semiconductor manufacturing processes with fixed scheduling policies; thus, it is necessary to adapt job scheduling policy in a timely manner in reaction to critical environmental changes (disturbances) in order for the fabrication process to perform optimally. This paper proposes an adaptive job control framework for a wafer fabrication process in a control system theoretical approach and implements it based on a DEVS modeling simulation environment. The proposed framework has the advantages in view of the whole systems understanding and flexibility of applying new rules compared to most ad-hoc software approaches in this field. Furthermore, it is flexible enough to incorporate new job scheduling rules into the existing rule set. Experimental results show that this control framework with adaptive rescheduling outperforms fixed job scheduling algorithms.
Journal of Korean Institute of Industrial Engineers
/
v.21
no.3
/
pp.357-369
/
1995
Wafer fabrication process is the most important and critical process in semiconductor manufacturing. The process is very complicated and hard to establish an efficient schedule due to its complexity. Furthermore, several performance indices such as due dates, throughput, cycle time and workstation utilizations are to be considered simultaneously for an efficient schedule, and some of these indices have negative correlations in performances each other. We develop an efficient heuristic scheduling algorithm; Hybrid Input Control Policy and Hybrid Dispatching Rule. Through numerical experiments, it is shown that the proposed Hybrid Scheduling Algorithm gives better performance compared with existing algorithms.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.