• Title/Summary/Keyword: Extra-dosed bridges

Search Result 2, Processing Time 0.018 seconds

Safety Evalution of on the cable of Extra dosed bridges by fire (화재에 대한 Extra-dosed교 케이블의 안전성 평가)

  • Rhu, Bong-Jo;Song, Young-Sun;Park, Weon-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.23-33
    • /
    • 2008
  • Extra dosed bridge among the Cabled-stayed bridges have been increasingly built in korea in recently. But such bridges were often damaged by fire due to car collison. In this study Extra dosed bridges among the cabled-supported bridges are selected to analysis model frequently to be designed and/or constructed in recent and furture in this study. COSMOS FloWorks 2007 software are used for Heat Transfer Analysis and Thermal Stress Analysis. The safety of wire, HDPE pipe and stainless steel pipe are investigated. In the case of the constant of the temperature of the heat source, the significant three variables for the analysis are selected for study : (1) the distance between the fire-proof bulk head and the heat source, (2) wind velocity, (3) the height of the end of Stainless steel pipe.

Development and Performance Experiment of Iso-tensioning System using Electrical Resistance Loadcell (전기저항식 로드셀을 이용한 균등긴장시스템 개발 및 성능실험)

  • Park, Won-Tae;Chun, Kyoung-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.2
    • /
    • pp.220-226
    • /
    • 2016
  • Because MS(Multi-Strand) cables consist of many strands, a jacking force is applied to each strand one by one for cable construction. All strands should have an equal tensile force when the last one is wedged. This is the core technology for MS iso-tensioning. In this study, a new MS cable iso-tensioning system was developed for controlling and jacking the high-strength strands, with an ultimate tensile strength of 2,200MPa, for a stay cable of extra-dosed/cable-stayed bridges. The newly developed iso-tensioning system consists of electrical resistance load cells, hydraulic jacking devices, hydraulic pumps, and integrated controllers. Moreover, it is embedded with an algorithm that can control and predict the variations in tensile forces of the Master and Slave strands in real time. Actual experiments were carried out to verify the function and performance of the newly developed system. This system was applied successfully to the stay cable construction of 2nd Tae-in extra-dosed bridge in Gwangyang.