Axial Bearing Characteristics of Tip-transformed PHC Piles through Field Tests (현장검증시험에 의한 선단변형 PHC말뚝들의 연직하중 지지특성에 관한 연구)

  • Choi, Yongkyu;Kim, Myunghak
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.11
    • /
    • pp.107-119
    • /
    • 2018
  • PHC piles, extension-plate attached PHC piles, and steel pipe attached PHC piles were installed in field test site. Axial compressive static load tests including load distribution test and Pile Driving Analyzer (after driving) were done on the tip-transformed PHC piles and the grouted tip-transformed PHC piles. Load-displacement curves of three different type of PHC piles, which are PHC pile (TP-1), extension plate attached PHC pile (TP-2) and steel pipe attached PHC pile (TP-3), showed almost the same behavior. Thus bearing capacity increase effect of the tip-transformed PHC piles was negligible. Share ratio of side resistance and end bearing resistance for PHC pile, extension plate attached PHC pile, and steel pipe attached PHC pile were 95.8% vs. 4.2%, 95.6% vs. 4.4%, and 97.8% vs. 2.2% respectively.

Study on the Applicability of Dynamic Pile Load Test to Check Integrity during Installation of Extension Plate Attached PHC Piles and Bolts Spliced PHC Piles and the Correct Proof Test of the Transformed-installation PHC Piles (확장판 선단부착 PHC말뚝 및 볼트 수직이음을 사용한 PHC말뚝의 시공 중 건전성 확인을 위한 동재하시험의 적용성 및 변형시공법 PHC말뚝들의 올바른 검증시험에 관한 연구)

  • Kim, Myunghak;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.12
    • /
    • pp.115-131
    • /
    • 2018
  • Extension plate attached PHC piles and bolts spliced PHC piles were installed in field test site. Pile integrities were checked during installation with dynamic pile test and the actual pile conditions after installation were compared with integrity index (${\beta}$ index) by PDA test. Theoretically the break in near pile end or pile end (especially extension plate itself) was very difficult to access by integrity index (${\beta}$ index) and also require a high level of knowledge and field experience on PDA test. First actual wave equation of bolts spliced PHC piles due to bolts spliced equipment can be different with welding spliced. Second wave length of the stress wave from installing can be longer than the height of bolts spliced equipment (about 100 mm). Third Beta processing in PDA analysis function is very difficult to access without a high level of knowledge and field experience on wave equation. Above-mentioned three reasons can make conclusion that traditional PDA test in domestic site can not access the integrity of bolts spliced equipment in bolts spliced PHC piles.