• Title/Summary/Keyword: Extension Remodeling

Search Result 73, Processing Time 0.023 seconds

Case History: Micropiling for Existing Foundation Retrofits (마이크로파일을 이용한 기초보강공법의 국내 적용 사례)

  • Lee, Jung-Hoon;Choi, Chang-Ho;Cho, Sam-Deok;Lee, Ki-Hwan;Jo, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF

A Study on the Load Distribution Ratio and Axial Stiffness on Existing and Reinforcing-Pile in Vertical Extension Remodeling (수직증축시 기존말뚝과 보강말뚝의 하중분담율 및 축강성 분석)

  • Jeong, Sang-Seom;Cho, Hyun-Cheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.1
    • /
    • pp.17-30
    • /
    • 2019
  • This study presents the application of the numerical and analytical technique to simulate the Load Distribution Ratio (LDR) and to define axial stiffness on reinforcing pile foundation ($K_{vr}$) in vertical extension remodeling structure. The main objective of this study was to investigate the LDR between existing piles and reinforcing piles. Therefore, to analyze the LDR, 3D FEM analysis was performed as variable for elastic modulus, pile end-bearing condition, raft contacts, and relative position of reinforcing pile in a group. Also, using the axial stiffness ($K_{ve}$) of existing piles, the axial stiffness of reinforcing pile was defined by 3D approximate computer-based method, YSPR (Yonsei Piled Raft). In addition $K_{vr}$ was defined by reducing the $K_{ve}$considering the degradation of the existing piles.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Developing Aged-Housing Remodeling Technology for Improving Structural and Equipment Performance;Introduction of Center for Aged-housing Remodeling Technology (노후 공동주택 구조 및 설비성능개선 기술 개발;연구단 소개)

  • Han, Ju-Yeoun;Cha, Hee-Sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.233-239
    • /
    • 2006
  • As the number of aged-housing has been rapidly increased, many kinds of defects and problems such as degeneration of housing environment, structural performance, and equipment performance have been appeared. The reconstruction as the way to improve the aged-housing has been used mostly because the legal process of the reconstruction is relatively easy. On the other hand, it has caused problems such as the lack of natural aggregate, the environmental damages owing to construction wastes, the loss of national resources, and the lack of the housing for rent nearby the reconstruction area. This problems limit active tying into the reconstruction business at present in the industrial and political perspective. In this context, it is required to revitalize the remodeling rather than the reconstruction. In order to reach this objective, this research aims at identifying the user-oriented performance for the housing industry and developing the new technologies. It is expected that the result of this research can contribute to more revitalize the remodeling as tying researches in terms of design, structure, equipment, and construction.

  • PDF

A Study of Prestressed Concrete Pile Stiffness for Structural Analysis of Condominium Remodeling with Vertical Story Extension (수직증축형 공동주택 리모델링 구조해석을 위한 PC말뚝 강성에 관한 연구)

  • Choi, Changho;Lee, Hyunjee;Choi, Kisun;You, Youngchan;Kim, Jinyoung
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.81-92
    • /
    • 2017
  • According to the revision of the Housing Act in 2013, it has been possible to carry out an apartment remodeling project involving two to three floor vertical extension. The remodeling project with vertical extension requires foundation reinforcement because structural safety due to additional load and enhanced seismic criteria must be met. In this case, structural analysis is performed to analyze the load distributed to existing PC pile and reinforced additional pile. The vertical stiffness ($K_v$) of the pile is required for structural analysis, but the research on the 20~30 year old PC pile stiffness is very limited. In this paper, the stiffness of the PC pile in accordance with the change of diameter and length was analyzed by examining the results of 38 field pile load tests performed during the construction of the apartments in the 1990's. As a result of the analysis, the pile stiffness decreases with the increase of the length-diameter ratio (L/D). In addition, the results of on-site pile load test are compared with the coefficient 'a' for estimating pile stiffness proposed in Korea Highway Bridge Design Standard (2008) and the Pile Foundation Design Guideline of Korea Railroad Corporation (2012). It shows that 'a' obtained through the estimation of the literature is very similar to the field test results in the range of 10

Seismic Performance Enhancement of Building Structures with Beam-end Rotation Type Dampers (보단부 회전형감쇠기를 이용한 건축구조물의 내진성능보강)

  • Woo, Sung-Sik;Lee, Sang-Hyun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.18 no.6
    • /
    • pp.589-597
    • /
    • 2008
  • The vertical extension of a building in general remodeling process increases both gravity and seismic loads by simply adding masses to the building. In this study, a vertical extension structural module(VESM) is proposed for enhancing seismic performance of the existing buildings by utilizing the story-increased parts. The proposed VESM is composed of steel column, steel beam, and beam-end rotational damper. The steel columns are connected to the shear walls and transfer the wall rotation in out-of plane to the steel beam, and then the beam-end rotational damper dissipates the earthquake-induced energy. Numerical analysis result from a cantilever beam of which end-rotation is restricted by rotational damper indicates that the displacement, base shear, and base overturning moment of the existing structures showing cantilever behavior can be significantly reduced by using the proposed method. Also, it is observed that friction-type rotational damper is effective than viscous one.

Developing Aged-Housing Remodeling Technology for Improving Structural and Equipment performance;Introduction of Center for Aged-housing Remodeling Technology (노후 공동주택 구조 및 설비성능개선 기술 개발;2차년도 실적 및 차년도 연구계획 소개)

  • Han, Ju-Yeoun;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.190-196
    • /
    • 2007
  • As the number of aged-housing has been rapidly increased, many kinds of defects and problems such as degeneration of housing environment, structural performance, and equipment performance have been appeared. The reconstruction as the way to improve the aged-housing has been used mostly because the legal process of the reconstruction is relatively easy. On the other hand, it has caused problems such as the lack of natural aggregates, the environmental damages owing to construction wastes, the loss of national resources, and the lack of the housing for rent nearby the reconstruction area. This problems limit active tying into the reconstruction business at present in the industrial and political perspective. In this context, it is necessary to revitalize the remodeling rather than the reconstruction. In order to reach this objective, this research aims at identifying the user-oriented performance for the housing and deducing the core technology. It is expected that the result of this research can contribute to more revitalize the remodeling as tying researches in terms of design, structure, equipment, and construction.

  • PDF

A Research on the Change of Spatial Usage though Enlargment and Remodeling of Urban Traditional Residences - Focused on Dining-Kitchen conversion of seoul Urban Traditional Residences - (증.개축에 따른 도시한옥 공간사용 방식의 변화에 관한 실태 조사연구 - 서울시 도시한옥의 DK화를 중심으로 -)

  • Kim, Seok-Woo;Koo, Soo-Young;Kim, Young-Bum;Park, Yong-Hwan
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.5
    • /
    • pp.111-118
    • /
    • 2009
  • Urban houses of traditional Korean Style are a type of habitation that happened during a transitional period when the modernization of habitation had progressed in 1930s, and also a habitation folding societal trails that had adapted and developed into urbanization together with the native traits of traditional Korean Style houses. Because they keep our style of living and the process of change just as they were, it is important work to shed light on and keep a record of it. So, this thesis arranges the contents of research on the actual condition of living, and may try to reason by analogy the changing style of residents' living through the change of space composition and the way of space usage for the urban houses of traditional Korean style that were changed by extension and remodeling of residents. As the concrete matters, it is to grasp the physical and spatial change of urban houses of traditional Korean style in accordance with extension and remodeling, and to analyze in which part and how they had been changing for the spatial composition of urban houses of traditional Korean style according to the change of living style, and especially the change toward a stand-up type of k stand-and the following traits and factors of the change toward Dining-Kitchen. The kitchen changed toward Dining-Kitchen shows some typical discrepancies depending on the location of kitchen as like a case of changing toward Dining-Kitchen from the existing location, a case of extending into the rear side of kitchen, a case of switching of location between kitchen and the inner room, and a case of changing toward Dining-Kitchen from the location of a room across from the main living room. As kitchen changed toward Dining-Kitchen like these, it shows that the connecting trace into the inner room came out, each room came to show a bit clearer function but grow smaller relation with the threshing ground, and also the function of the threshing ground came reduced.

Analysis of Load Distribution Behavior in Vertical Extension Remodeling from Stiffness of Existing and Reinforcing Pile by Load Test (현장 재하시험을 통한 수직증축시 기존 말뚝과 보강 말뚝의 강성에 따른 하중분담거동 분석)

  • Kim, Seok-Jung;Wang, Cheng-Can;Han, Jin-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.8
    • /
    • pp.61-72
    • /
    • 2020
  • It is generally considered that differences of axial stiffness between exiting pile and reinforcing pile affect the load distribution ratio during vertical extension remodeling. But there are few cases to verify the effect of stiffness by field load test on load distribution ratio in Korea. In this paper, a series of load tests for micropiles were carried out to evaluate the effect of axial stiffness on the load distribution ratio. First, different types of micropiles were constructed so that conventional micropiles simulated existing piles and waveform micropiles simulated reinforcing piles. Secondly, load tests were performed to evaluate the stiffness of each piles. After then, the raft was installed to make a piled raft system and load tests were applied on foundation to verify the effect of axial stiffness on the load distribution ratio. The experimental results show that the stiffness of waveform micropiles were 2.5 times larger than that of conventional micropiles, and the load distribution ratio between existing and reinforcing piles was increased according to axial stiffness of piles.

Surgery for a Case of Three-Compartment Trigeminal Schwannoma : Technical Aspects

  • Chung, Jong-Chul;Chung, Seung-Young;Kim, Seong-Min;Park, Moon-Sun
    • Journal of Korean Neurosurgical Society
    • /
    • v.48 no.4
    • /
    • pp.383-387
    • /
    • 2010
  • Complete removal of three-compartment trigeminal schwannomas is a challenge to neurosurgeons. To expand exposure of each compartment, the combination and modification of skull base approaches are necessary. The 61-year-old woman was admitted with chronic headache. Preoperative magnetic resonance imaging showed $47{\times}50{\times}40\;mm$-sized tumor originating primarily in the middle cranial fossa extended to the posterior and the infratemporal fossa. We performed operation in five stage; 1. Zygomatic osteotomy, 2. Inferior temporal fossa plate removal and foramen ovale opening, 3. Cavernous sinus opening, 4. Tailored anterior petrosectomy, 5. Meckel's cave opening. Combination of skull base surgery should be concerned according to the patient. In this study, extradural basal extension with zygomatic osteotomy, interdural posterior extension with tailored anterior petrosectomy, and intracavemous exploration are reasonable options for remodeling three-compartment lesion into a single compartment. Tailoring of bone resection and exploring through natural pathway between meningeal layers accomplish single-stage operation for complete removal of tumors.