• 제목/요약/키워드: Existing cost model

검색결과 824건 처리시간 0.029초

장수명화와 시공성을 고려한 새로운 공동주택 모델의 초기 비용절감 가능성 연구 - 구조체와 외장전환 사례분석을 중심으로 - (A Study on the Possibility of Initial Cost Saving in the New Housing Model Considering Long-life and Constructability - Focused on the Case Analysis with Converting Skeleton and Cladding to New Systems -)

  • 김수암;신성은;정준수;손영진
    • 한국주거학회논문집
    • /
    • 제23권6호
    • /
    • pp.49-59
    • /
    • 2012
  • This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.

유전알고리즘을 이용한 하천수질관리모형에 관한 연구 (A Study on the River Water Quality Management Model using Genetic Algorithm)

  • 조재현;성기석
    • 상하수도학회지
    • /
    • 제18권4호
    • /
    • pp.453-460
    • /
    • 2004
  • The objective of this research is to develop the water quality management model to achieve the water quality goal and the minimization of the waste load abatement cost. Most of existing water quality management model can calculate BOD and DO. In addition to those variables, N and P are included in the management model of this study. With a genetic algorithm, calculation results from the mathematical water quality model can be used directly in this management model. Developed management model using genetic algorithm was applicated for the Youngsan River basin. To verify the management model, water quality and pollution source of the Youngsan River had been investigated. Treatment types and optimum treatment costs of the existing and planned WWTPs in the baisn were calculated from the model. The results of genetic algorithm indicate that Kwangju and Naju WWTP have to do the advanced treatment to achieve the water quality goal about BOD, DO and TP. Total annual treatment cost including the upgrade cost of existing WWTPs in the Youngsan River basin was about 50.3 billion Won.

Analysis of Economic Lifespan for Replacement Policy of Container Ship using Fuzzy Interval Numbers

  • Jang, Woon-Jae
    • 한국항해항만학회지
    • /
    • 제35권2호
    • /
    • pp.173-178
    • /
    • 2011
  • This study determined the ship replacement life expectancy from an economic perspective. There are many ambiguities in the cost for calculation of economic lifespan, and these were expressed as fuzzy numbers. Also, a fuzzy cost model using fuzzy numbers was developed and suggested as a more practical analysis method than the existing cost model. And the suggested fuzzy model was used to determine the economic lifespan for various types of container ships. As the result, Without fuzziness, the economic lifespan of 5000 TEU Ships was found to be 19 years. it was found that the greater the container ship, the greater the economic lifespan was.

대중교통 통행배정모형의 통행비용함수 분석 (A Study on Travel Cost Function of Transit Assignment Model)

  • 김경태;이석;권용석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1902-1907
    • /
    • 2007
  • This paper suggests improvements in travel cost function of transit assignment model by analysing existing model. Two types of travel cost function are widely used for congested public networks. The one is used for strictly restricting public transport capacity. Another is non-decreasing function such as BPR function. In this paper, we analyse two types of travel cost function in case of intercity rail. The characteristics of intercity rail are different from those of public transit in urban area. Therefore travel cost function must be differently applied in each case.

  • PDF

비용 효과도 최적화 기반 양산 무기체계 환경 부하 선별 시험 설계 방법 (The Mass Production Weapon System Environmental Stress-Screening Test Design Method based on Cost-effective-Optimization)

  • 김장은
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제18권3호
    • /
    • pp.229-239
    • /
    • 2018
  • Purpose: There is a difficulty in Environmental Stress Screening (ESS) test design for weapon system's electrical/electronic components/products in small and medium-sized enterprises. To overcome this difficulty, I propose an easy ESS test design approach algorithm that is optimized with only one environment tolerance design information parameter (${\Delta}T$). Methods: To propose the mass production weapon system ESS test design for cost-effective optimization, I define an optimum cost-effective mathematical model ESS test algorithm model based on modified MIL-HDBK-344, MIL-HDBK-2164 and DTIC Technical Report 2477. Results: I clearly confirmed and obtained the quantitative data of ESS effectiveness and cost optimization along our ESS test design algorithm through the practical case. I will expect that proposed ESS test method is used for ESS process improvement activity and cost cutting of mass production weapon system manufacturing cost in small and medium-sized enterprises. Conclusion: In order to compare the effectiveness of the proposed algorithm, I compared the effectiveness of the existing ESS test and the proposed algorithm ESS test based on the existing weapon system circuit card assembly for signal processing. As a result of the comparison, it was confirmed that the test time was reduced from 573.0 minutes to 517.2minutes (9.74% less than existing test time).

투입노력 양에 기반한 소프트웨어 유지보수 비용산정 모형 (A Software Maintenance Cost Estimation Model based on Real Maintenance Efforts)

  • 정은주;유천수
    • Journal of Information Technology Applications and Management
    • /
    • 제19권2호
    • /
    • pp.181-196
    • /
    • 2012
  • The cost of software maintenance occupies about two thirds in the software lifecycle. However, it is not easy to estimate the cost of software maintenance because of various viewpoints about software maintenance, unclear estimation methods, and complex procedures. Until now, the cost estimation model has used compensation factors for software characteristic and environment on the basis of program size. Especially, most of existing models use maintenance rate of total software cost as a main variable. This paper suggests the software maintenance cost estimation model that uses the result of calculating real maintenance efforts. In this paper, we classify functional maintenance and non-functional maintenance as software maintenance activity type. For functional maintenance, present function point of target software is needed to evaluate. The suggested maintenance cost evaluation model is applied to a software case in public sector. This paper discusses some differences between our model and other modes.

장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델 (Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges)

  • 조효남;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

간섭현상을 고려한 생산/재고 정책의 시뮬레이션 분석 (A Simulation Analysis of Producton/Inventory Policy with Interference)

  • 박회룡;최진영
    • 산업경영시스템학회지
    • /
    • 제18권35호
    • /
    • pp.131-138
    • /
    • 1995
  • For the purpose of the reduction of tile cost, a production/inventory model including the interference phenomenon was developed. By investigating the cause and the characteristics of the direct/indirect cost due to the interference phenomenon, a strategy for suitable production was developed. The developed model was quantitatively validated using an existing-EPQ model and the SIMAN package was used to simulate and animate the model. Consequently, it was presented that the total operating cost of the system could be decreased with tile proposed model.

  • PDF

경제급전방식에 의한 확률적 운전비계산 모델 (Probabilistic Production Costing Model based on Economic Load Dispatch)

  • 심건보;이봉용;신종린;김정훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 전기.전자공학 학술대회 논문집(I)
    • /
    • pp.640-643
    • /
    • 1987
  • A probabilistic production costing model based on the economic load dispatch has been developed. Objective function is composed of fuel cost which is a function of generation output and the failure cost. Coefficients of the failure cost is determined from the known equivalent generation cost. The model is compared with other existing methodolgies and the excellent results are obtained.

  • PDF

Evaluation of Conversion Action Data Mechanisms in Cost-Per-Action Advertising

  • Tian, Li;Lee, Kyoung-Jun
    • 한국경영정보학회:학술대회논문집
    • /
    • 한국경영정보학회 2008년도 춘계학술대회
    • /
    • pp.428-433
    • /
    • 2008
  • The online advertising industry's business model undertakes the change from CPM (cost-per-mille)-based to CPC (cost-per-click)-based. However, due to the problem of 'Click Fraud', CPA (cost-per-action) has been regarded as a new step. For CPA, publishers need to get information after a user clicks an advertisement. Therefore, in CPA, the key is to get Conversion Action Data (CAD). This paper introduces two existing mechanisms for getting CAD, compare their characteristics, and analyze their limitations. Then the two new mechanisms are introduced and their requirements and feasibility are analyzed. Lastly, we compare the existing two and the new two mechanisms, and point out each mechanism's business possibility, value and Application Area. This paper will help publishers choose the most appropriate mechanism on the basis of their situation.

  • PDF