• Title/Summary/Keyword: Excavation data

Search Result 461, Processing Time 0.028 seconds

Improvement of SOC Structure Automated Measurement Analysis Method through Probability Analysis of Time-History Data (시계열 데이터의 확률분석을 통한 SOC 구조물 자동화계측 분석기법 개선)

  • Jung-Youl Choi;Dae-Hui Ahn;Jae-Min Han;Jee-Seung Chung;Jung-Ho Kim;Bong-Chul Joo
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.679-684
    • /
    • 2023
  • Currently, large-scale and deep-depth excavation construction is being carried out in the vicinity of structures due to overdensity in urban areas in Korea. It is very important to secure the safety of retaining structures and underground structures for adjacent excavation work in urban areas. The safety of facilities is managed by introducing an automated measurement system. However, the utilization of the results of the automated measurement system is very low. Conventional evaluation techniques rely only on the maximum value of the measured data, and can overestimate abnormal behavior. In this study, we intend to improve the analysis technique for the automation measurement results. In order to identify abnormal behavior of facilities, a time-series analysis method for automated measurement data was presented. By applying a probability statistical analysis technique to a vast amount of data, highly reliable results were derived. In this study, the analysis method and evaluation method that can process the vast amount of data of facilities have been improved.

A study on pattern and 3D restoration of Chinese traditional women's robe, straight Ju(直裾深衣) (중국 전통 귀족 여성 예복인 직거심의(直裾深衣)의 패턴 및 3D 복원 연구)

  • Sun Yuan;Jihyeon Kim;Mi-hyang Na
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.25 no.4
    • /
    • pp.107-122
    • /
    • 2023
  • This study analyzed the style, dimensions, fabric patterns, colors, and fabrics of a traditional Chinese women's dress from the Zhou Dynasty, and reconstructed it in the form of a virtual garment using 3D CLO. Based on ancient flat image data and three-dimensional portrait data, who wore them, how they were worn, and how they were coordinated was analyzed. In order to analyze the size and pattern of the straight Ju Chines dress, data from the excavation report and the tomb owner's anthropometric measurements were combined to infer the wearing condition and organize the sculptural features. Dimensional analysis was carried out using a well-preserved small-scale woven cotton cloth as a restoration model, and the horizontal and vertical dimensions were reasonably estimated using the shape proportioning method. The analysis of the colors and patterns of the fabrics was based on the colors and patterns of the fabrics excavated from Masan Tomb No. 1 during the Eastern Zhou, Qin, and Han periods. Finally, a virtual model was created using data from the excavation report and the age and height information of the owner of the excavated robe, and the pose and size of the virtual model were determined using 3D CLO. Based on the previous research data, the garment was virtually sewn and simulated. The shape, pressure, and strain of the garment in different postures was also compared. Through the research direction of pattern and 3D restoration, this research maximizes the restoration of Chinese traditional women's dress and presents it in a more intuitive, comprehensive, and vivid way.

More Than 40 Percent of Data Unnecessarily Redundant in Corporate Databases

  • Moon, Jenghyearn
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.345-354
    • /
    • 2021
  • Data quality issue in information systems is analyzed with focus on conceptual data modeling. Extensive investigation through triangulation of case studies is attempted to find how much extent inappropriate data modeling practices exercised in real workplace environment. It is revealed that more than 40 percent of data adversely contributed to unnecessary data redundancy, i.e., the level of data obesity is over 40 percent. Another contribution of this paper lies in excavation of all the categories of inappropriate data modeling practices, which has been previously only partially uncovered in the literature. New findings in this paper prove that the extent of inappropriate modeling is more serious that previously reported.

Analysis on the Characteristics of Rock Blasting-induced Vibration Based on the Analysis of Test Blasting Measurement Data (시험발파 계측자료 분석을 통한 암석 발파진동 특성 분석)

  • Son, Moorak;Ryu, Jaeha;Ahn, Sungsoo;Hwang, Youngcheol;Park, Duhee;Moon, Duhyeong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.9
    • /
    • pp.23-32
    • /
    • 2015
  • This study examined blast testing measurement data which had been obtained from 97 field sites in Korea to investigate the comprehensive characteristics of rock blasting-induced vibration focusing on the effect of excavation types (tunnel, bench) and rock types. The measurement data was from the testing sites mostly in Kangwon province and Kyungsang province and rock types were granite, gneiss, limestone, sand stone, and shale in the order of number of data. The study indicated that the blasting-induced vibration velocity was affected by the excavation types (tunnel, bench) and bench blasting induced higher velocity than tunnel blasting. In addition, the vibration velocity was also highly affected by the rock types and therefore, it can be concluded that rock types should be considered in the future to estimate a blasting-induced vibration velocity. Furthermore, the pre-existing criteria was compared with the results of this study and the comparison indicated that there was a discernable difference except for tunnel blasting results based on the square root scaling and therefore, further studies and interests, which include the effects of rock strength, joint characteristics, geological formation, excavation type, power type, measurement equipment and method, might be necessarily in relation to the estimation of blasting-induced vibration velocity in rock mass.

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

Safety Evaluation of Subway Tunnel Structures According to Adjacent Excavation (인접굴착공사에 따른 지하철 터널 구조물 안전성 평가)

  • Jung-Youl Choi;Dae-Hui Ahn;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.559-563
    • /
    • 2024
  • Currently, in Korea, large-scale, deep excavations are being carried out adjacent to structures due to overcrowding in urban areas. for adjacent excavations in urban areas, it is very important to ensure the safety of earth retaining structures and underground structures. accordingly, an automated measurement system is being introduced to manage the safety of subway tunnel structures. however, the utilization of automated measurement system results is very low. existing evaluation techniques rely only on the maximum value of measured data, which can overestimate abnormal behavior. accordingly, in this study, a vast amount of automated measurement data was analyzed using the Gaussian probability density function, a technique that can quantitatively evaluate. highly reliable results were derived by applying probabilistic statistical analysis methods to a vast amount of data. therefore, in this study, the safety evaluation of subway tunnel structures due to adjacent excavation work was performed using a technique that can process a large amount of data.

Control Method of Adaptive Duty-cycling for Monitoring System in Excavations (굴착현장 모니터링 시스템을 위한 적응적인 듀티사이클링 제어 기법)

  • Kim, Taesik;Min, Hong;Jung, Jinman
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.6
    • /
    • pp.141-146
    • /
    • 2016
  • Geotechnial engineering projects that requires excavation activity can cause massive ground deformation and this can damage adjacent structures. Depending on the engineering characteristics of ground material and the excavation depth, the ground movement is various. To overcome this issue, the ground deformation is monitored by multiple sensors. Typically, an inclinometer is installed behind the support wall. In this paper, we present an adaptive duty-cycling control mechanism using wireless sensors for monitoring ground deformation in excavations. The proposed mechanism dynamically adjusts the sleep time based on the urgency degree of sensed data from inclinometer. Through analytical evaluation of expected latency time, we confirm our adaptive duty-cycling mechanism has lower latency compared with periodic duty-cycling mechanism under variable conditions.

Preliminary numerical analysis of controllable prestressed wale system for deep excavation

  • Lee, Chang Il;Kim, Eun Kyum;Park, Jong Sik;Lee, Yong-Joo
    • Geomechanics and Engineering
    • /
    • v.15 no.5
    • /
    • pp.1061-1070
    • /
    • 2018
  • The main purpose of retaining wall methods for deep excavation is to keep the construction site safe from the earth pressure acting on the backfill during the construction period. Currently used retaining wall methods include the common strut method, anchor method, slurry wall method, and raker method. However, these methods have drawbacks such as reduced workspace and intrusion into private property, and thus, efforts are being made to improve them. The most advanced retaining wall method is the prestressed wale system, so far, in which a load corresponding to the earth pressure is applied to the wale by using the tension of a prestressed (PS) strand wire. This system affords advantages such as providing sufficient workspace by lengthening the strut interval and minimizing intrusion into private properties adjacent to the site. However, this system cannot control the tension of the PS strand wire, and thus, it cannot actively cope with changes in the earth pressure due to excavation. This study conducts a preliminary numerical analysis of the field applicability of the controllable prestressed wale system (CPWS) which can adjust the tension of the PS strand wire. For the analysis, back analysis was conducted through two-dimensional (2D) and three-dimensional (3D) numerical analyses based on the field measurement data of the typical strut method, and then, the field applicability of CPWS was examined by comparing the lateral deflection of the wall and adjacent ground surface settlements under the same conditions. In addition, the displacement and settlement of the wall were predicted through numerical analysis while the prestress force of CPWS was varied, and the structural stability was analysed through load tests on model specimens.

Analysis of Ground Movement During Diaphragm Well Panel Constructions in Sedimentary Marine Deposit (해성점토층에 실시된 지중연속벽 시공에 의한 지반의 변위 분석)

  • Lee Cheol-Ju
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.43-54
    • /
    • 2005
  • The ground movements during three. full-scale trial diaphragm wall (DW) panel constructions were monitored and analysed. The DW panels were constructed in reclaimed fill where sedimentary marine deposit and residual weathered soils are being consolidated. The monitoring data showed exceptionally large lateral ground movements of up to 293 mm near a trench due to the DW panel constructions, which is about 0.8$\%$ D, where D is the maximum excavation depth. It was observed that deliberate holding period of the trench resulted in a significant increase in the lateral ground movements of about 50-225$\%$. A pre-treatment of the marine deposit by installing a single line of jet grout columns around the trench prior to the excavation was found to be a very effective way of reducing the ground movements. The measured ground settlements were compared with some relevant case histories. DW panel constructions in sedimentary marine deposit are likely to cause maximum ground surface settlement up to 0.225$\%$ D.

Monitoring Result of Rock Mass Behavior during Excavation of Deep Cavern (대심도 지하 공간 굴착시의 암반거동 - 일본 SUPER KAMIOKANDE의 사례 -)

  • Lee Hong-Gyu
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.11-25
    • /
    • 2006
  • The world's largest nucleon decay experiment facility is constructed at a depth of approximately 1,000 meters, in the Kamio Mine, Japan. The excavated cavern is consisted of a cylinder of 42.4 m high and a semi elliptical dome of 15.2 m high, with a bottom diameter of 40 m. The total excavation volume is approximately $69,000\;m^3$. Because of the character as a large cavern excavation in deep underground, there is many unknown factors in rock mechanics. Based on the results of rock test and numerical analysis, the monitoring of rock mass behavior accompanying progress of construction was performed by various instruments installed in the rock mass surrounding the cavern. The monitoring data was used in the study of measures for cavern stability.