An Adaptive and Real-Time System for the Analysis and Design of Underground Constructions

  • Gutierrez, Marte
    • Geotechnical Engineering
    • /
    • v.26 no.9
    • /
    • pp.33-47
    • /
    • 2010
  • Underground constructions continue to provide challenges to Geotechnical Engineers yet they pose the best opportunities for development and deployment of advance technologies for analysis, design and construction. The reason for this is that, by virtue of the nature of underground constructions, more data and information on ground characteristics and response become available as the construction progresses. However, due to several barriers, these data and information are rarely, if ever, utilized to modify and improve project design and construction during the construction stage. To enable the use of evolving realtime data and information, and adaptively modify and improve design and construction, the paper presents an analysis and design system, called AMADEUS, for underground projects. AMADEUS stands for Adaptive, real-time and geologic Mapping, Analysis and Design of Underground Space. AMADEUS relies on recent advances in IT (Information Technology), particularly in digital imaging, data management, visualization and computation to significantly improve analysis, design and construction of underground projects. Using IT and remote sensors, real-time data on geology and excavation response are gathered during the construction using non-intrusive techniques which do not require expensive and time-consuming monitoring. The real-time data are then used to update geological and geomechanical models of the excavation, and to determine the optimal, construction sequences and stages, and structural support. Virtual environment (VE) systems are employed to allow virtual walk-throughs inside an excavation, observe geologic conditions, perform virtual construction operations, and investigate stability of the excavation via computer simulation to steer the next stages of construction.

  • PDF

Development of Back Analysis Program for Total Management Using Observational Method of Earth Retaining Structures under Ground Excavation (지반굴착 흙막이공의 정보화시공 종합관리를 위한 역해석 프로그램 개발)

  • 오정환;조철현;김성재;백영식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10c
    • /
    • pp.103-122
    • /
    • 2001
  • For prediction of ground movement per the excavation step, observational results of ground movement during the construction was very different with prediction during the analysis of design. step because of the uncertainty of the numerical analysis modelling, the soil parameter, and the condition of a construction field, etc. however accuratly numerical analysis method was applied. Therefore, the management system through the construction field measurement should be achieved for grasping the situation during the excavation. Until present, the measurement system restricted by ‘Absolute Value Management system’only analyzing the stability of present step was executed. So, it was difficult situation to expect the prediction of ground movement for the next excavation step. In this situation, it was developed that ‘The Management system TOMAS-EXCAV’ consisted of ‘Absolute value management system’ analyzing the stability of present step and ‘Prediction management system’ expecting the ground movement of next excavation step and analyzing the stability of next excavation step by‘Back Analysis’. TOMAS-EXCAV could be applied to all uncertainty of earth retaining structures analysis by connecting ‘Forward analysis program’ and ‘Back analysis program’ and optimizing the main design variables using SQP-MMFD optimization method through measurement results. The application of TOMAS-EXCAV was confirmed that verifed the three earth retaing construction field by back analysis.

  • PDF

A Study on the Stability of Existing Subway Tunnel due to Construction of New Underpass (지하차도 건설에 따른 기존 지하철터널 안정성에 대한 연구)

  • Chung, Jee-Seung;Choi, Jae-Young;Lee, Jin-Hyuk
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.57-63
    • /
    • 2016
  • Recently, subways in the city are formed a vast underground network which is interfered with construction when large-scale infrastructure will be planned to nearby existing subway tunnels. Researches have been restricted to estimate stability of existing subway tunnel due to adjacent excavation causued by small construction such as buildings. In this paper, OO underpass is planned on the top of existing subway tunnel, which will be need large-scale excavation, is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to excavation by stages on construction of underpass. The 3D-numerical analysis was performed by using the MIDAS/GTS program. The stability on existing subway tunnel caused by sequential excavation is analysed using numerical results. Based on the analysis, the excavation orders and reinforcement methods was suggested for stability of exiting subway tunnel.

Development and Application of Construction Control System for Excavation (굴착 관리 정보화 시스템의 개발 및 적용)

  • 권오순;정충기;김재관;이해성;김명모
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.153-166
    • /
    • 1999
  • Since the reliability of results by the existing analyzing method is low, in the case of for excavation performed in urban area whose stability is of great importance, construction control based on field monitoring is always necessary. But the field monitoring reflects only the behavior of construction process that has already been carried out, and it has limitations in predicting the behavior of the expected construction process, which is practically more important for construction control. In this study, construction control system for excavation which can predict the behavior of the expected processes during construction with high degree of accuracy, is developed by adopting inverse analysis. The inverse analied applied field monitoring results to excavation analysis can improve the reliability of predicted results. The developed system uses an elasto-plastic soil spring model for the excavation analysis and the minimization of least squared errors between measured displacements and calculated displacements for the inverse analysis. All the required processes for construction control can be performed as an integrated work within the system reflecting real time application and user's convenience. Their applicabilitis are confirmed by two case studies.

  • PDF

SOME PROBLEMS AND REMEDIAL MEASARES OF BRACED EXCAVATION IN URBAN AREAS (도심지 지하굴착의 문제점과 개선방향)

  • 김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.158-168
    • /
    • 1994
  • This report describes aspects of recent braced excavation constructed in built up areas where adjacent buildings or underground utilities are likely to be subjected to settlement and damages. Trends and choice of earth retaining structures for deep excavation are present, and some desigen and construction techniques are introduced in order to minimise possible adverse effects to the urban environment. Some problems in design and construction of braced excavation in urban area are closely examined and remedial measrures are proposed.

  • PDF

A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction (고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구)

  • Seon-Ah Jo;Ju-Hwan Jung;Hee-Hwan Ryu;Jun-Sik Park;Tae-Min Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.5
    • /
    • pp.357-371
    • /
    • 2023
  • In cable tunnel construction using TBM, the vertical shaft is an essential structure for entrance and exit of TBM equipment and power lines. Since a shaft penetrates the ground vertically, it often encounters rock mass. Blasting or rock splitting methods, which are mainly used to the rock excavation, cause public complaints due to the noise, vibration and road occupation. Therefore, mechanical excavation using vertical shaft excavation machine are considered as an alternative to the conventional methods. However, at the current level of technology, the vertical excavation machine has limitation in its performance when applied for high strength rock with a compressive strength of more than 120 MPa. In this study, the potential utilization of waterjet technology as an excavation assistance method was investigated to improve mechanical excavation performance in the hard rock formations. Rock cutting experiments were conducted to verify the cutting performance of the abrasive waterjet. Based on the experimental result, it was found that ensuring excavation performance with respect to changing in ground conditions can be achieved by adjusting waterjet parameters such as standoff distance, traverse speed and water pressure. In addition, based on the relationship between excavation performance, uniaxial compressive strength and RQD, it was suggested that excavation performance could be improved by artificially creating joints using the abrasive waterjet. It is expected that these research results can be utilized as fundamental data for the introduction of vertical shaft excavation machines in the future.

Case Study of Structure Damage due to Adjacent Deep Excavation (깊은 굴착에서 근접시공에 따른 구조물 피해사례 연구)

  • 김성욱;김주봉
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.113-120
    • /
    • 1999
  • Deep excavation,1 in the urban areas may cause terrible damages to the adjacent structures. Most damages are due to the settlement of ground during excavation work. This article introduces two actual examples of structure damage in subway construction projects. A through of attempts to find out the factors that are affecting to the settlement of ground was made through site investigations and analyses of measurement data. Some suggestions are given to prevent the repeat of trial and error in deep excavation projects. This kind of attempts are eccentrical to the development and improvement of information-oriented construction method.

  • PDF

Case Study of Environmental Impact Assessment about Groundwater Outflow during Railroad Tunnel Construction (철도건설사업시 터널지하수 유출에 관한 환경영향평가 사례 연구)

  • Lee Jeongho;Yoo Heonseok;Lee Young Soo;Park Chang Sug
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.303-308
    • /
    • 2004
  • It is recently reported that the importance of environmental impact assessment(EIA) about groundwater outflow problems is beingy raised in the case of tunnel excavation during railroad construction. The EIA about groundwater outflow into railroad tunnel is generally performed using the results of numerical analysis embodied through groundwater flow modeling program like MODFLOW. The basic data for this modeling include (1) the geological and hydrogeological investigation data along the planned block of tunnel excavation, (2) total amount of outflowed groundwater during tunnel excavation, and (3) the status of groundwater level fluctuation in the water-supply wells distributed in the planned block of tunnel excavation. In this study, the authors analyzed the cases of the computational modeling about groundwater outflow in three planned blocks of railroad tunnel, and suggest the environmental impact factors and mitigation plan during EIA of tunnel excavation in railroad construction.

  • PDF

The illegal case and Improvement of Excavation (흙막이 굴착공사의 부실 사례 및 개선방향)

  • Choi, Jung-Bum;Shin, Seung-Mock
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.643-650
    • /
    • 2009
  • The necessary consequence by the rapid economic growth in large-scale urban excavation is increasing. If the site is the congested in downtown, the scale of excavation will get the large-scale and the extreme depth. We have achieved a high level technology internationally by the design and construction of underground excavation since 1980's. But the accidents during excavation are frequently occurring. So, this demage instigates the human life loss as well as economical loss. The recent accident is come about the damage for public facilities such as the railroad, subway and etc. in addition to the loss of life and property. For these reasons, the recent accident is being caused the damage of copious social overhead capital. The reasons of collapse during excavation can be classified roughly into the administrative part(sanction, permission), the investigation and design, the construction and management and etc. In this study the close check for the cases of the recent collapse is performed and the improvement course for the prevention of collapse is found.

  • PDF

A Study on Excavation Path Design of Excavator Considering Motion Limits (실차의 거동한계를 고려한 굴착기의 굴착 경로설계 연구)

  • Shin, Dae Young
    • Journal of Drive and Control
    • /
    • v.18 no.2
    • /
    • pp.20-31
    • /
    • 2021
  • An excavator is a construction machine that can perform various tasks such as trenching, piping, excavating, slope cutting, grading, and rock demolishing. In the 2010s, unmanned construction equipment using ICT technology was continuously developed. In this paper, the path design process was studied to implement the output data of the decision stage, and the path design algorithm was developed. For example, the output data of the decision stage were terrain data around the excavator, excavator mechanism information, excavator hydraulic information, the position and posture of the bucket at key points, the speed of the desired bucket path, and the required excavation volume. The result of the path design was the movement of the hydraulic cylinder, boom arm, bucket, and bucket edge. The core functions of the path design algorithm are the function of avoiding impact during the excavation process, the function to calculate the excavation depth that satisfies the required excavation volume, and the function that allows the bucket to pass through the main points of the excavation process while maintaining the speed of the desired path. In particular, in the process of developing the last function, the node tracking method expressed in the path design table was newly developed. The path design algorithm was verified as this path design satisfied the JCMAS H02 requirement.