• Title/Summary/Keyword: Excavation Method

Search Result 1,058, Processing Time 0.027 seconds

Mechanical Behavior of Tunnel Portal in Horizontal Arch Slope (수평 아치형 터널 갱구부 비탈면의 역학적 거동)

  • Yang, Mun-Sang;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.50-61
    • /
    • 2000
  • The ground around the portal of a tunnel is the most typical part showing the 3-dimensional mechanical behavior in the tunnel. The portal slope is constructed at the weathered soft rock-mass, and remains as a potential sliding mass. The slope failure around the tunnel portal may happen drastically and induce the great disaster; hence, for the permanent stability several special techniques are required. To solve this problem, the ground around the tunnel portal may be excavated in the arch shape to develop the arching effect in horizontal direction. With the arch-type portal slope, one can reduce considerably the excavation mass and the damage of environments. This approach has not been attempted yet due to the lack of understanding and the well-defined analyzing method, so the retaining wall type portal is more universal. The 3-dimensional finite element analyses were carried out to prove that the arch type is more advantageous in safety and cost than the right angle type. The influence of the tunnel construction sequence and the strength of the rock-mass on the slope stability was investigated by focusing on the maximum shear strain in the slope, and the yield zone at the tunnel face.

  • PDF

Development of penetration rate model and optimum operational conditions of shield TBM for electricity transmission tunnels (터널식 전력구를 위한 순굴진율 모델 개발 및 이를 활용한 쉴드TBM 최적운전 조건 제안)

  • Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.623-641
    • /
    • 2020
  • About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.

Chromosomal Localization of Korean Cattle (Hanwoo) BAC Clones via BAC end Sequence Analysis

  • Chae, Sung-Hwa;Kim, Jae-Woo;Choi, Jae Min;Larkin, Denis M.;Everts-van der Wind, Annelie;Park, Hong-Seog;Yeo, Jung-Sou;Choi, Inho
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.20 no.3
    • /
    • pp.316-327
    • /
    • 2007
  • In this study, a Korean native cattle strain (Hanwoo) evidencing high performance in terms of both meat quality and quantity was employed in the generation of 150,000 BAC clones with an average insert size of 140 kb, and corresponding to about a 6X coverage of bovine chromosomal DNA. The BAC clones were pooled in a mini-scale via three rounds of a pooling protocol, and the efficiency of this pooling protocol was evaluated by testing the accuracy of accessibility to the positive clones, via a PCR-based screening method. Two sets of primers designed from each of two known genes were tested, and each yielded 2 or 3 positive clones for each gene, thereby indicating that the BAC library pooling system was appropriate with regard to the accession of the target BAC clones. Analyses of $3.3{\times}10^6$ base pairs obtained from the 7,090 BAC end sequence (BES) showed that 34.88% of the DNA sequence harbored the repetition sequence. Analysis of the 7,090 BES to the $1^{st}$ and $2^{nd}$ generation radiation hybrid map of the cattle genome, using the COMPASS program designed for the construction of a cattle-human comparative mapping, resulted in the localization of a total of 1,374 clones proximal to 339 $1^{st}$ generation markers, and 1,721 clones proximal to 664 $2^{nd}$ generation markers. Collectively, the BAC library and pooling system of the BAC clones from the Korean cattle, coupled with the chromosome-localized BAC clones, will provide us with novel tools for the excavation of desired clones for genome mapping and sequencing, and will also furnish us with additional information regarding breed differences in cattle.

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

A Coupled Analysis of Finite Elements and Boundary Elements for Time Dependent Inelastic Problems (시간의존 비탄성 문제의 유한요소-경계요소 조합에 의한 해석)

  • Kim, Moon Kyum;Huh, Taik Nyung;Jang, Jung Bum;Oh, Se Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.3
    • /
    • pp.25-34
    • /
    • 1993
  • The long-term behavior, such as in excavation problems of weak medium, can be dealt with by the elasto-viscoplasticity models. In this paper, a combined formulation of elasto-viscoplasticity using boundary elements and finite elements without using internal cells is presented. The domain integral introduced due to the viscoplastic stresses is transformed into a boundary integral applying direct integration in cylindrical coordinates. The results of the developed boundary element analysis are compared with those from the explicit solution and from the finite element analysis. It is observed that the boundary element analysis without internal cells results in some error because of its deficiency in handling the nonlinearity in local stress concentration. Therefore, a coupled analysis of boundary elements and finite elements, in which finite elements are used in the area of stress concentration, is developed. The coupled method is applied to a time dependent inelastic problem with semi-infinite boundaries. It results in reasonable solution compared with other methods where relatively higher degree of freedoms are employed. Thus, it is concluded that the combined analysis may be used for such problems in the effective manner.

  • PDF

Characteristics of the Earth Pressure Magnitude and Distribution in Jointed Rockmass (절리가 형성된 암반지층에서 발생된 토압의 크기 및 분포특성)

  • Son, Moorak;Yoon, Cheolwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6C
    • /
    • pp.203-212
    • /
    • 2011
  • This paper investigates the caharactheristics of the earth pressure magnigue and distribution in jointed rockmass for a safe and economic design and construction of earth retaining structures installed in rock stratum. For this purpose, this study will first investigate the limitations and problems of the existing earth pressure studies and then to overcome them th study will conduct the discontinuum numerical parametric studies based on the Discrete Element Method (DEM), which can consider the joint characteristics in rock stratum. The controlled parameters include rock type and joint conditions (joint shear strength and joint angle), and the magnitude and distribution characteristics of earth pressure have been investigated considering the interactions between the ground and the retaining structures. In addition, the comparison between the earth pressures induced in rock stratum and Peck's earth pressure for soil ground has been carried out. From the comparison, it is found that the earth pressure magnitude and distribution in jointed rockmass has been highly affected by rock type and joint condition and has shown different characteristics compared with the Peck's empirical earth pressure. This result would hereafter be utilized as an important information and a useful data for the assessment of earth pressure for designing a retaining structures installed in jointed rockmass.

Monitoring of Formaldehyde Concentration in Exhibition Hall Using Passive Sampler (Passive Sampler를 이용한 유물 전시관내 폼알데하이드 농도 모니터링)

  • Lee, Sun Myung;Lim, Bo A;Kim, Seojin
    • Journal of Conservation Science
    • /
    • v.33 no.5
    • /
    • pp.319-329
    • /
    • 2017
  • In this study, formaldehyde concentrations in two exhibition halls were monitored using a passive sampler from May 2012 to April 2013. Formaldehyde concentrations in the exhibition halls were 5 to 36 times higher than concentrations outdoors. Concentrations inside the exhibition room and showcase varied according to pollutant source, HVAC(heating, ventilation, air conditioning)system and environment management. The formaldehyde concentration levels were corrected according to a standard method prescribed by Indoor Air Quality Management Law of the Ministry of Environment, Korea. As a result, Most concentration levels exceeded the exhibition standard of the Ministry of Environment($100{\mu}g/m^3$) and artifacts conservation standard of Tokyo National Museum($50{\mu}g/m^3$). Seasonal concentrations in the exhibition room and showcase were in the order summer>fall>spring>winter. Formaldehyde emissions increased in summer when air temperature and relative humidity are both high. Formaldehyde concentration distribution according to the temperature and relative humidity showed positive correlation. Air temperature showed good correlation because $R^2$ was in the range of 0.8~0.9. Analysis of formaldehyde emission characteristics in the exhibition hall would be helpful in efforts to improve indoor air quality.

FEM Analysis of Controlled Low Strength Materials for Underground Facility with Bottom Ash (바톰애쉬를 이용한 지하매설관용 유동성뒤채움재의 FEM 해석)

  • Lee, Kwan-Ho;Lee, Kyung-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.5
    • /
    • pp.2368-2373
    • /
    • 2012
  • In this research, finite element method was carried out to evaluate the defomation of pipe and surface displacement for backfill of underground ficility. Various conditions for analysis were employer, including two different pipes(PE and concrete pipe), two different excavation depth(60cm and 150cm) and width(1.5D and 2D), a regular sand backfill, and four different flowable backfills. The vertical deformation of 60 cm diameter for PE was measured three times more than that of 30 cm diameter. The measured deformations for regular backfill and four flowable backfills were 0.320mm, and 0.135mm to 0.155mm, respectively. It ratio was around 40%. In case of 30cm diameter of concrete pipe, the measured vertical defomation was around 0.004mm for all the backfill materials. In case of installation depth, the effect of flowable backfill for flexible pipe is better than for rigid pipe. There is little effect on the deformation of concrete pipe with regular sand backfill and flowable backfill.

Effect of Joint Cohesive Strength on the Earth Pressure against the Support System in a Jointed Rock Mass (절리형성 암반지층 굴착벽체 작용토압에 대한 절리 점착강도의 영향)

  • Son, Moorak;Solomon, Adedokun
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.7
    • /
    • pp.41-53
    • /
    • 2014
  • This study examined the magnitude and distribution of the earth pressure on the support system in a jointed rock mass by considering different joint shear strength, rock type, and joint inclination angle. The study particularly focused on the effect of joint cohesive strength for a certain condition. Based on a physical model test (Son and Park, 2014), extended parametric studies were conducted considering rock-structure interactions based on the discrete element method, which can consider the rock and joint characteristics of rock mass. The results showed the earth pressure was strongly affected by the joint cohesive strength as well as the rock type and joint inclination angle. The study indicated that the effect of joint cohesive strength was particularly significant when a rock mass was under the condition of joint sliding. This paper investigates the magnitude of joint cohesive strength to prevent a joint sliding for each different condition. The test results were also compared with Peck's earth pressure, which has been frequently used for soil ground. The comparison indicated that the earth pressure in a jointed rock mass can be significantly different from that in soil ground. This study is expected to provide a better understanding of the earth pressure on the support system in a jointed rock mass.

A Study on Techniques of the construction and Space Structure of Nam-hea city walls (남해읍성의 공간구성과 축조기법에 관한 연구)

  • Kwon, Soon-Kang;Lee, Ho-Yeol
    • Journal of architectural history
    • /
    • v.18 no.5
    • /
    • pp.59-80
    • /
    • 2009
  • The purpose of this study is to investigate the history, space structures, blueprint, and techniques of the construction of Nam-hea city walls. Nam-hea city walls were relocated in 1439 from Whagumhun-Sansung(火金峴山城) to the present site, nearby Nam-hea Um.(南海邑) The city walls were rebuilt after they were demolished during Japanese invasion on Korea in 1592 and their reconstruction was also done in 1757. At present, the city walls only partially remained due to the urbanization of the areas around them. A plane form of the City wall is a square, and the circumference os approximately 1.3km. According to the literature, the circumference of the castle walls is 2,876尺, the height is 13尺, and the width is 13尺 4寸. Hang-Kyo(鄕校). SaGikDan(社稷壇), YoeDan(厲壇), SunSo(船所) which is a harbor, as well as government and public offices such as Kaek-Sa(客舍) and Dong-Hun(東軒) existed inside the castle walls. Inside the castle walls were one well, five springs, one ditch, and one pond, and in the castle walls, four castle gates, three curved castle walls, and 590 battlements existed. The main government offices inside castle walls were composed of Kaek-Sa, Dong-Hun, and Han-Chung(鄕廳) their arrangements were as follows. Kaek-Sa was situated toward North. Dong-Hun was situated in the center of the west castle walls. The main roads were constructed to connect the North and South castle gate, and subsidiary roads were constructed to connect the East and West castle gate. The measurement used in the blueprint for castle wall was Pobaek-scale(布帛尺:1尺=46.66cm), and one side of it was 700尺. South and North gate were constructed in the center of South and North castle wall, and curved castle walls was situated there. One bastion was in the west of curved castle walls and two bastions were in the east of curved castle walls. The east gate was located in the five eighths of in the east castle wall. Two bastions were situated in the north, on bastion in the south, one bastion in the south, and four bastions in the west castle wall. The castle walls were constructed in the following order: construction of castle field, construction of castle foundation, construction of castle wall, and cover the castle foundation. The techniques used in the construction of the castle walls include timber pile(friction pile), replacement method by excavation.

  • PDF