• Title/Summary/Keyword: Eurobalise

Search Result 4, Processing Time 0.032 seconds

A Study on Radion Frequency of the Transponder System for High-speed and High-precision Train Location Detection (고속열차 위치검지를 위한 트랜스폰더 시스템 운용 주파수 연구)

  • Ahn, Il-Yeop;Sung, Nak-Myoung;Kim, Jaeho;Choi, Sung-Chan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.237-242
    • /
    • 2017
  • This paper presents development of the transponder system which provides an accurate train position, especially for supporting 400km/h high speed train. Here, we analyzed an operating frequency band of the transponder system which can be interoperable with the Eurobalise system already installed in Korea railroad as to be used for the automatic train protection (ATP). By investigating the power frequency band and its data frequency band of the transponder system, we presents the adoptable frequency band for the developed transponder system. Additionally, through the real testbed using HEMU-430X, we evaluate its performance requirement and shows interoperable operation with the Eurobalise system.

A review of ATP Onboard System's Test procedure (열차방호장치(ATP) 차상설비 시험절차에 대한 고찰)

  • Chang, Seok-Gahk;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1163-1168
    • /
    • 2008
  • Automatic Train Protection(ATP) System is developed by ETCS(European Train Control System) CONSORTIUM for unify Europe railway system. ATP system is composed of Eurobalise and EuroATC. Nowadays, Korea construct ATP system in conventional line and new electrical locomotives also install ATP system. It is important to verify quality which form checklist during Factory Acceptance Test at beyond the seas. In this paper, review the process, test item, norm and checklist for the Balise Transmission Module, Compact Antenna Unit, Vehicle Control Unit and Communication Controller at the Plymouth Bombardier and Vasteras enics factory.

  • PDF

A Study on the Safety Braking Distance in ATP System (ATP시스템의 안전제동거리에 대한 연구)

  • Kim, Min-Kyu;Kim, Min-Seok;Kim, Jong-Soo;Yun, Yu-Boem;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.132-139
    • /
    • 2011
  • ATP(Automatic Train Protection) system in railroad signalling system is on-board signalling system which is controlled by train control information such as location and speed of trains. Safety is ensured by transmitting the train control information between on-board and wayside device in the ATP system. When an engineer disregards the speed limit on a tachometer, the train is automatically stopped by the on-board device. Recently, the studies of increasing speed of the train have been developed. Eurobalise in ERTMS/ETCS system is used in case that speed of trains is up to 500[km/h]. A study of safety braking distance is needed by increasing the speed of train in the ATP system. Train data and track data are required to calculate the safety braking distance. The train data includes formations of trains, length of trains, service brake and emergency brake etc. Also, the track data includes slope of track, curve of track, length of track, speed limit etc. In this paper, the speed profile is computed by analyzing the train and track data in the ATP system. It is demonstrated by applying to subway line 2 in Seoulmetro through the on-site test.

  • PDF

Parallel Descrambling of Transponder Telegram for High-Speed Train (고속철도용 트랜스폰더 텔레그램의 병렬 디스크램블링 기법)

  • Kwon, Soon-Hee;Park, Sungsoo;Shin, Dong-Joon;Lee, Jae-Ho;Ko, Kyeongjun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.2
    • /
    • pp.163-171
    • /
    • 2016
  • In order to detect the exact position of high-speed train, it is necessary to obtain location information from the transponder tag installed along the track. In this paper, we proposed parallel descrambling scheme for high-speed railway transponder system, which aims for reducing the processing time required to decode telegram. Since a telegram is stored in a tag after information bits are scrambled by an encoder, decoding procedure includes descrambling of received telegram to recover the original information bits. By analyzing the structure of the descrambling shift register circuit, we proposed a parallel descrambling scheme for fast decoding of telegram. By comparing the required number of clocks, it is shown that the proposed scheme significantly outperforms the original one.