• Title/Summary/Keyword: Estimation manufacturing cost

Search Result 84, Processing Time 0.03 seconds

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

A Bit of Factory Automation : Manufacturing Cost Estimation Using Group Technology (공장 자동화에 관한 소고 : 그룹 테크놀로지를 이용한 생산원가 추정)

  • Lee, Sung-Youl
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.2
    • /
    • pp.77-86
    • /
    • 1989
  • A fully automated cost estimation system(FACES) has been developed. Since speed, accuracy, and consistency are essential factors in automating a cost estimation, the use of computers in cost estimation system(CES) has grown rapidly in the last few years. FACES is a micro computer based cost estimation system that employs a manufacturing knowledge base. A Group Technology(GT) based part classification and coding(C&C) scheme is used to automate the process planning aspects of cost estimation. Variant process planning methods are employed to generate workstation routings from form features of the part. The system has been tested for an assembly of six machined parts. Results indicate that the system could provide a substantial improvement in accuracy, productivity, and performance over the more traditional full dialog approach to cost estimation. It also provides a good foundation for a factory automation by using a common GT based database through design to production.

  • PDF

A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing (주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구)

  • 김인준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

Development of a Costing Model for Wooden Patterns of Casting Structures for Machine Tools

  • Seo, Han-Tae;Choi, Jin-Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.24 no.4
    • /
    • pp.386-393
    • /
    • 2015
  • A study is carried out on investigation on pattern costs, identification of geometric parameters for the cost, and development of cost estimation models for casting patterns. Pattern costs for machine tool structures are collected and analyzed to identify the important geometric parameters that affect the costs. The parameters are used for the development of the costing models. It is found that the geometric parameters can be easily obtained from a CAD system and then the costing models estimate a pattern cost in a minimum time. The models are verified with the structures whose pattern cost was used for this study. It is expected that this costing models can evaluate the cost of casting structures of machine tools in search of a near-optimal design based on manufacturing cost and, for example, weight at the design stage.

Cost Estimation of Accidents in Auto-Glass Manufacturing Process (자동차유리 제조공정에서 발생하는 산업재해의 손실비용 추정)

  • Lim, Hyeon-Kyo;Lee, Seung-Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.1
    • /
    • pp.43-48
    • /
    • 2011
  • Estimation of accident costs would set a sound criterion on which invest judgement for work improvement would be decided. Unfortunately, however, the professional agency and most companies in Korea still adopt the conventional cost estimation method based on Heinrich's theory would not be applicable any more since it was developed about a century ago. This research was carried out to confirm the validity of conventional accident cost estimation method. With 110 accident cases occurred in an autoglass manufacturing plant for last 7 years, post-accident treatment procedure was simplified as a model with several phases, and practical costs were analyzed case by case. The results showed that, as expected, the company should the largest portion of loss due to accidents, and that mean indirect cost were 10.10(${\pm}20.70$) times as much as direct cost estimated by conventional method. Therefore, finally, accident types and items influenced much on accidents costs were analyzed and discussed.

Fabrication and Characterization of Micro parts by Mechanical Micro Machining: Precision and Cost Estimation (기계식 마이크로 머시닝을 이용한 마이크로 형상의 특성과 비용 평가)

  • Kang, Hyuk-Jin;Choi, Woon-Yong;Ahn, Sung-Hoon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.24 no.1 s.190
    • /
    • pp.47-56
    • /
    • 2007
  • Recently, demands on mechanical micro machining technology have been increased in manufacturing of micro-scale precision shapes and parts. The main purpose of this research is to verify the accuracy and cost efficiency of the mechanical micro machining. In order to measure the precision and feasibility of mechanical micro machining, various micro features were machined. Aluminum molds were machined by a 3-axis micro stage in order to fabricate microchips with $200{\mu}m$ wide channel for capillary electrophoresis, then the same geometry of microchip was made by injection molding. To evaluate the cost efficiency of various micro manufacturing processes, cost estimation for mechanical micro machining was conducted, and actual costs of microchips fabricated by mechanical micro machining, injection molding, and MEMS (Micro electro mechanical system) were compared.

Cost Function Estimation of Regional Manufacturing Industries in Ko-rea (지역별 제조업의 비용함수 추정)

  • 김상호;손영엽
    • Journal of the Korean Regional Science Association
    • /
    • v.11 no.2
    • /
    • pp.1-17
    • /
    • 1995
  • Regional production structres are investigated through an estimation of three-input(labor, capital and material) translog cost function. The estimation uses the pooled data in which time series data of 1970-1990 are combined with cross-sectional data corresponding to firm sizes. The empirical finding are the following: (1) the factors are Allen substitutes each otner in general except Pusan and a couple of regionss, and (2) estimates are very small in its absolute value irrespective of the regions. The low elasticity estimates of this study implies that substitytability among the three inputs are very weak in the regional manufacturing production compared to that in the national production. Seoul-Kyungki metropolitan area produces not only the smallest elasticities but relatively stable estimates without much fluctuation between the sub-regions of the area.

  • PDF

Strength Estimation of GGBF Slag Concrete by Warm Water Method (온수법에 의한 고로슬래그 미분말 혼합 콘크리트의 강도추정)

  • 문한영;최연왕;김용직
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.313-318
    • /
    • 2001
  • The cost of producing ready mixed concrete(remicon) has increased due to the rising cost of raw materials for concrete and transportation caused by the upturn of oil price. In contrast, its orders have also decreased due to the recession of the construction industry. In addition, the cost of delivery has decreased owing to the excessive competition among manufacturing companies, so manufacturing companies began mixing ground granulated blast-furnace slag or fly ash to lower the cost. However, there is no way to determine whether the strength of the concrete using the admixture is satisfied or dissatisfied with design strength at the early age. The purpose of this study is dedicated to early strength estimation of concrete mixed with an admixture, ground granulated blast-furnace slag.

  • PDF

Estimation of Manufacturing Time for Machined Parts (절삭가공물의 생산 시간 추정)

  • Kim, Kang
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.12 no.4
    • /
    • pp.1-8
    • /
    • 2003
  • It is well known that design cost is only about 5% of final product cost but over 70% of it is determined during design stage. Earlier in the product design and development cycle the design changes occur, more economic they become. Therefore, it is recommended that the manufacturing time and cost of product are considered in steps involved in designing and manufacturing a product as early as possible. In this study, it is proposed a possible way that cm be available for estimating manufacturing time of parts, which are manufactured by conventional material removal processes (e.g. turning, milling and drilling). For it to be useful in the early design stage, the minimum number of informations on dimension shape, and design features of part will be used in this method.

Estimation of geometry-based manufacturing cost of complex offshore structures in early design stage

  • Nam, Jong-Ho;Sohn, Se-Hwan;Singer, David J.
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.4 no.3
    • /
    • pp.291-301
    • /
    • 2012
  • A scalar metric for the assessment of hull surface producibility was known to be useful in estimating the complexity of a hull form of ships or large offshore structures by looking at their shape. However, it could not serve as a comprehensive measuring tool due to its lack of important components of the hull form such as longitudinals, stiffeners, and web frames attached to the hull surface. To have a complete metric for cost estimation, these structural members must be included. In this paper, major inner structural members are considered by measuring the complexity of their geometric shape. The final scalar metric thus consists of the classes containing inner members with various curvature magnitudes as well as the classes containing curved plates with single and double curvature distribution. Those two distinct metrics are merged into a complete scalar metric that accounts for the total cost estimation of complex structural bodies.