• Title/Summary/Keyword: Estimation Reserve

Search Result 46, Processing Time 0.02 seconds

Contingency and Management Reserves Estimation Method for Project Budget (프로젝트 예비비 편성 방법에 관한 연구)

  • Kwon, Hyukchun;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.

Testing Structural Changes in Triangular Data (삼각분할표에서 구조적 변화점 유무에 관한 검정)

  • Lee, Sung-Im
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.4
    • /
    • pp.551-562
    • /
    • 2008
  • The loss reserve is defined as a provision for an insurer's liability for claims or an insurer's estimate of the amount an individual claim will ultimately cost. For the estimation of the loss reserve, the data which make up the claims in general is represented as run-off triangle. The chain ladder method has known as the most representative one in the estimation of loss reserves based on such run-off triangular data. However, this fails to capture change point in trend. In order to test of structural changes of development factors, we will present the test statistics and procedures. A real data analysis will also be provided.

Technical and Financial evaluation for mineral project (광물자원 프로젝트의 기술성 및 경제성 평가 기법)

  • Cho, Seong-Jun
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.101-118
    • /
    • 2009
  • In order to invest in overseas mineral projects, it is necessary to have a ability of technical and financial evaluation. Reserve estimation is the most important for mineral appraisal. Geostatistical evaluation of tonnage and grade promises more accurate reserve estimation than traditional methods such as polygon, inverse distance method and so on even if it has some uncertainty. Selection of a mining method and a mineral processing is also important because capex and opcosts of a mineral project is due to the selection. Mineral project is usually evaluated financially using NPV and IRR which are calculated through DCF(Discount Cash Flow). Uncertainty of a mineral project is analyzed statistically using sensitivity analysis and montecarlo simulation.

  • PDF

Basal Area-Stump Diameter Models for Tectona grandis Linn. F. Stands in Omo Forest Reserve, Nigeria

  • Chukwu, Onyekachi;Osho, Johnson S.A.
    • Journal of Forest and Environmental Science
    • /
    • v.34 no.2
    • /
    • pp.119-125
    • /
    • 2018
  • The tropical forests in developing countries are faced with the problem of illegal exploitation of trees. However, dearth of empirical means of expressing the dimensions, structure, quality and quantity of a removed tree has imped conviction of offenders. This study aimed at developing a model that can effectively estimate individual tree basal area (BA) from stump diameter (Ds) for Tectona grandis stands in Omo Forest Reserve, Nigeria, for timber valuation in case of illegal felling. Thirty-six $25m{\times}25m$ temporary sample plots (TSPs) were laid randomly in six age strata; 26, 23, 22, 16, 14, and 12 years specifically. BA, Ds and diameter at breast height were measured in all living T. grandis trees within the 36 TSPs. Least square method was used to convert the counted stumps into harvested stem cross-sectional areas. Six basal area models were fitted and evaluated. The BA-Ds relationship was best described by power model which gave least values of Root mean square error (0.0048), prediction error sum of squares (0.0325) and Akaike information criterion (-15391) with a high adjusted coefficient of determination (0.921). This study revealed that basal area estimation was realistic even when the only information available was stump diameter. The power model was validated using independent data obtained from additional plots and was found to be appropriate for estimating the basal area of Tectona grandis stands in Omo Forest Reserve, Nigeria.

Potential of the kNN Method for Estimation and Monitoring off-Reserve Forest Resources in Ghana

  • Kutzer, Christian
    • Journal of Forest and Environmental Science
    • /
    • v.24 no.3
    • /
    • pp.151-154
    • /
    • 2008
  • Dramatic price increases of fossil fuels and the economic development of emerging nations accelerates the transformation of forest lands into monocultures, e.g. for biofuel production. On this account, cost efficient methods to enable the monitoring of land resources has become a vital ambition. The application of remote sensing techniques has become an integral part of forest attribute estimation and mapping. The aim of this study was to evaluate the potentials of the kNN method by combining terrestrial with remotely sensed data for the development of a pixel-based monitoring system for the small scaled mosaic of different land use types of the off-reserve forests of the Goaso forest district in Ghana, West Africa. For this reason, occurrence and distribution of land use types like cocoa and non-timber forest resources, such as bamboo and raphia palms, were estimated, applying the kNN method to ASTER satellite data. Averaged overall accuracies, ranging from 79% for plantain, to 83% for oil palms, were found for single-attribute classifications, whereas a multi-attribute approach showed overall accuracies of up to 70%. Values of k between 3 and 6 seem appropriate for mapping bamboo. Optimisation of spectral bands improves results considerably.

  • PDF

Consideration of a structural-change point in the chain-ladder method

  • Kwon, Hyuk Sung;Vu, Uy Quoc
    • Communications for Statistical Applications and Methods
    • /
    • v.24 no.3
    • /
    • pp.211-226
    • /
    • 2017
  • The chain-ladder method, for which run-off data is employed is popularly used in the rate-adjustment and loss-reserving practices of non-life-insurance and health-insurance companies. The method is applicable when the underlying assumption of a consistent development pattern is in regards to a cumulative loss payment after the occurrence of an insurance event. In this study, a modified chain-ladder algorithm is proposed for when the assumption is considered to be only partially appropriate for the given run-off data. The concept of a structural-change point in the run-off data and its reflection in the estimation of unpaid loss amounts are discussed with numerical illustrations. Experience data from private health insurance coverage in Korea were analyzed based on the suggested method. The performance in estimation of loss reserve was also compared with traditional approaches. We present evidence in this paper that shows that a reflection of a structural-change point in the chain-ladder method can improve the risk management of the relevant insurance products. The suggested method is expected to be utilized easily in actuarial practice as the algorithm is straightforward.

Triffin Dilemma and International Monetary System : Evidence from Pooled Mean Group Estimation

  • Guan, Long-Fei;Lau, Wee-Yeap
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.5 no.2
    • /
    • pp.5-14
    • /
    • 2018
  • This study is motivated based on concern from some renowned scholars and central bankers whom have raised the issue of the sustainability of the International Monetary System (IMS). Using the panel data set of four major international currencies, USD, JPY, EUR and GBP from 1973 to 2013 with Pooled Mean Group (PMG) estimator, to re-examine whether Triffin dilemma still exists through investigating the relationship between the reserve share, current account balance and real effective exchange rate. The evidence from the result indicates that Triffin dilemma exists only in the long run, and shows that in the long-run, current account balance is proportionate to the increased real effective exchange rate while varies inversely with the reserve shares. However, the estimation for the short-run is not significant to prove the existence of Triffin dilemma. In addition, we investigated the non-dollar panel sample and found that the international monetary system still suffers from Triffin dilemma even without the dollar. To overcome Triffin dilemma, immediate step such as having currency swap mechanism is recommended. In medium term, a multi-polar Monetary System is suggested, and in the longer time, a supranational currency will be used to replace all the currencies in the world.

Quantification of Cerebral Perfusion Reserves using Deadtime Correction of Gamma Camera and Norma1ized Difference Ratio Image in Brain SPECT (뇌혈류 SPECT에서 감마카메라 불응시간보정과 정규화 감산영상을 이용한 뇌혈류 비축능의 정량화)

  • 이재성;곽철은
    • Journal of Biomedical Engineering Research
    • /
    • v.17 no.4
    • /
    • pp.443-448
    • /
    • 1996
  • Sequential brain SPECT imaging has been used to assess the cerebral perfusion reserve(CPR) in cerebrovascular diseases(UD). We have realized parametric images of CPR using deadtime correction of gamma camera and normalized difference ratio. For the anatomical localization of CPR, the parametric images were registered to the contours of the cerebral regions using optimal threshold method, which showed to reflect the CPR more reliably and distinctively than the simple subtraction. We conclude that the quantitative estimation of CPR using normalized difference ratio image could be useflll for the diagnosis and prognostic assessment of CVD.

  • PDF

Estimation of the Number of Change-Points with Local Linear Fit

  • Kim, Jong-Tae;Choi, Hey-Mi
    • Journal of the Korean Data and Information Science Society
    • /
    • v.13 no.2
    • /
    • pp.251-260
    • /
    • 2002
  • The aim of this paper is to consider of detecting the location, the jump size and the number of change-points in regression functions by using the local linear fit which is one of nonparametric regression techniques. It is obtained the asymptotic properties of the change points and the jump sizes. and the correspondin grates of convergence for change-point estimators.

  • PDF